Loading…
Loading…
Tender Value
₹21.3 L
EMD Value
₹42,680
Closing Date
19 Jun 2026, 6:00 pm5d left
Executive Engineer PWD Divison Gandoh
Executive Engineer PWD Divison Gandoh
Permanent Restoration of Bhatyas Manoo Road from km ist Rd 600to km 11by way of construction of R/wall ,
2026_PWDJK_312222_2
E-NIT 10 of 2026-27
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Divison Gandoh
₹42,680
12 Jun 2026
12 Jun 2026
20 Jun 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
12 Jun 2026 - 18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil : | 513.6 | Cum | 256.85 | ₹1,31,918.16 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 30.05 | Cum | 5,202.9 | ₹1,56,347.15 |
| 3 | Providing and laying in position cement concrete (1:3:6) with 20% boulders incl. curing but excluding the cost of centering and shuttering all work upto plinth level | 255.26 | Cum | 4,774.46 | ₹12,18,728.66 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work | 376.8 | Sqm | 286.35 | ₹1,07,896.68 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 96 | Sqm | 628.95 | ₹60,379.2 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 16.62 | Cum | 218.4 | ₹3,629.81 |
| 7 | Providing and laying non-pressure of specified class R.C.C. Pipes including collars / spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.900 mm dia. R.C.C. Pipe | 60 | Rmt | 3,951.65 | ₹2,37,099 |
| 8 | Providing and laying non-pressure of specified class R.C.C. Pipes including collars / spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc Non-pressure NP-3 class (Medium duty) R.C.C. Pipes 450mm | 30 | Rmt | 2,008.8 | ₹60,264 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete | 17.34 | Sqm | 562.15 | ₹9,747.68 |
| 10 | Carriage of stone from an average distance of 05Km by MT | 51.05 | Cum | 236.16 | ₹12,055.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.73 MB
BOQ_1010659.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid