| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.9 Craccepted-aoc | ₹5.9 Cr | accepted-aoc |
Tender Value
₹5.6 Cr
EMD Value
₹8.5 L
Closing Date
13 Feb 2026, 11:00 pmClosed
Minor Irrigation Department
SHILPA.K
Construction of Shirapur pattern of Series of Checkdams and Improvements to Nalas of Hulikere-Kenchamallanahalli villages in Kudligi taluk Vijayanagara Dist
MI/2025-26/AB/WORK_INDENT10196
MI/2025-26/AB/WORK_INDENT10196
Open
Construction of Anicuts - Barrages
Two Tender Document System(Two Cover)
Minor Irrigation Division Bellary
6 documents required · 6 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Executed in any one year, during the last five years (2020-21to 2024-25) the following minimum quantities of work 1.Earthwork in both excavation and embankment (combined quantities) : 123339.00 Cum 2. Cement concrete (including RCC and PCC ) : 2455.00 Cum 3. Supply and Fabrication/Reinforcement steel : 25.00 Tonne 4. Pitching / Revetment : 7421.00 Sqm.
Satisfactorily completed (at least 90% of contract value) in the last five years (i.e. 2020-21 to 2024-25), as a prime contractor, at least one Similar work such as Construction of Checkdam/Bridge/Pickups work of value not less than Rs. 281.43 Lakhs. The weightage of 10% will be given per year to bring them to the price level of the FY 2025-26.
Tenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years i.e. 2020-21 to 2024-25 (updated to 2025-26 price level) taking into account the completed as well as works in progress. N, Number of years 11 months prescribed for completion of the works for which tenders are invited. B, Value, at 2025-26 price level, of existing commitments and on-going works to be completed during the next 11 months (11/12 (0.916) year i.e. period of completion of the works for which Tenders are invited.
Achieved in at least two financial years during the last five years (i.e. 2020-21 to 2024-25) a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.1125.72 Lakhs. Financial turn over of previous years will be given a weightage of 10% per year to bring to them to the price level of the FY 2025-26.
Liquid assets and /or availability of credit facilities of not less than Rs. 157.75 Lakhs Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc
ContractorRegistration certificate
Each Tenderer should further demonstrate a.Availability by owning at least 50percent of the required specified key and critical equipment for this work and b. the remaining 50percent can be deployed on lease or hire basis for all works provided,the relevant documents commitment agreements etc.for availability for this work are furnished.1. Excavator or Poclaine 4 Nos. 2. Lorry or Tipper 6 Nos. 3. Self loading Concrete Mixer or Concrete mixer 3 Nos. 4. Vibrator Roller 02 Nos
Section 3 Qualification Information
₹5,000
₹8.5 L
13 Feb 2026
6 Feb 2026
16 Feb 2026
12 Feb 2026
11 Feb 2026
Construction of Shirapur pattern of Series of Checkdams and Improvements to Nalas of Hulikere-Kenchamallanahalli villages in Kudligi taluk Vijayanagara Dist
MI001 CHECKDAM 1: Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricadin... 1406.35 Cum
MI002 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 332.23 Cum
MI003 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery,labour, c... 123.91 Cum
MI004 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe... 578.77 Cum
MI005 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per r... 243.75 Cum
MI006 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 9.56 t
MI007 Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading... 310.50 Cum
MI008 Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / ... 1890.00 Sqm
MI009 Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and comple... 168.00 Cum
MI010 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad... 1.00 No
MI011 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse
aggregate i... 28.00 m
MI012 Nala Depeaning Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloadin... 30130.00 Sqm
MI013 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 31597.17 Cum
MI014 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 7693.23 Cum
MI015 Recharge Shaft three nos Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, struttin... 112.50 Cum
MI016 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 37.50 Cum
MI017 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 27.00 Cum
MI018 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 40.50 Cum
MI019 Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, etc., complete with all lead and lifts including... 59.01 Cum
MI020 Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all etc., complete with all lead and l... 143.19 Cum
MI021 Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading &sizes as per actual requirement, all etc., complete with all... 16.68 Cum
MI022 Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with ... 12.00 Each
MI023 Sinking of Borewell of 165mm dia clear using super fast hydraulic rigof capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and c... 60.00 m
MI024 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint... 60.00 m
MI025 Providing and fixing sultable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing plpe, removable as per re quirement, all complete for borewell of:(150 mm dia). ... 3.00 Each
MI026 Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utllity ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 55... 3.39 Sqm
MI027 CHECKDAM 2:Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading... 1597.20 Cum
MI028 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution ... 266.38 Cum
MI029 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, ... 136.81 Cum
MI030 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe... 638.56 Cum
MI031 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per r... 288.38 Cum
MI032 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 10.53 t
MI033 Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a
place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading... 184.00 Cum
MI034 Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston... 2130.00 Sqm
MI035 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing,finishing top surface & all necessary works as directed etc., compl... 186.00 Cum
MI036 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad... 1.00 No
MI037 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse
aggregate i... 28.00 m
MI038 Nala Depeaning Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloading... 36500.00 Sqm
MI039 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 36633.21 Cum
MI040 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 9448.53 Cum
MI041 Recharge Shaft three nos Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, struttin... 112.50 Cum
MI042 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 37.50 Cum
MI043 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 27.00 Cum
MI044 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 40.50 Cum
MI045 Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts etc., complete with all lead and lifts including ... 59.01 Cum
MI046 Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all etc., complete with all lead and l... 143.19 Cum
MI047 Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading &sizes as per actual requirement, all etc.,etc., complete wit... 16.68 Cum
MI048 Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with ... 12.00 Each
MI049 Sinking of Borewell of 165mm dia clear using super fast hydraulic rigof capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and c... 60.00 m
MI050 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint... 60.00 m
MI051 Providing and fixing sultable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing plpe, removable as per re quirement, all complete for borewell of:(150 mm dia) e... 3.00 Each
MI052 Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utllity ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 55... 3.39 Sqm
MI053 CHECKDAM 3:Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading... 1754.46 Cum
MI054 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 242.46 Cum
MI055 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, ... 135.71 Cum
MI056 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe... 646.66 Cum
MI057 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per r... 276.19 Cum
MI058 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 10.52 t
MI059 Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a
place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading... 396.75 Cum
MI060 Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston... 5256.00 Sqm
MI061 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing,finishing top surface & all necessary works as directed etc., comple... 186.00 Cum
MI062 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad... 1.00 No
MI063 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse
aggregate i... 28.00 m
MI064 Nala Depeaning Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloading... 34750.00 Sqm
MI065 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 49275.97 Cum
MI066 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 12382.21 Cum
MI067 Recharge Shaft three nos Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, struttin... 112.50 Cum
MI068 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 37.50 Cum
MI069 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 27.00 Cum
MI070 Earth work excavation for Foundation by mechanical means for all works & required depth , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l... 40.50 Cum
MI071 Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, etc., complete with all lead and lifts including... 59.01 Cum
MI072 Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all etc., complete with all lead and l... 143.19 Cum
MI073 Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading &sizes as per actual requirement, all etc., complete with all... 16.68 Cum
MI074 Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with ... 12.00 Each
MI075 Sinking of Borewell of 165mm dia clear using super fast hydraulic rigof capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and c... 60.00 m
MI076 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint... 60.00 m
MI077 Providing and fixing sultable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing plpe, removable as per re quirement, all complete for borewell of:(150 mm dia) e... 3.00 Each
MI078 Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utllity ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 55... 3.39 Sqm
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Technical bid.doc
Tender Document • 0.21 MB
Kudligi KKRDB Drawings with sign.pdf
Tender Document • 7.53 MB
kudligi kkrdb complaince.pdf
Others - COMPLIANCE • 1.40 MB
kw-4 KUDLIGI.doc
Tender Document • 26.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .