| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.8 L+₹52,297.29 (23.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,980
Closing Date
16 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of drain from house of Mohd Dawood Mir and others at Mir Mohalla Gujran Tulail
2026_PWDJK_315197_4
(RnB) E-NIT No 26 of 2026-27 EE-RnB-Grz-3038-44 E-tendering Dated-08-07-2026
Open Tender
Civil Works
Percentage
20 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Executive Engineer RnB Division Gurez
₹5,980
Executive Engineer RnB Division Gurez
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete by manual/ mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:4:8 or leaner mix (i/c equivalent design mix). | 4.23 | Cum | 1,064.55 | ₹4,503.05 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge.All kinds of soil | 23.96 | Cum | 479.3 | ₹11,484.03 |
| 3 | Supply,Stacking,laying spreading and compacting stone aggregate(90-45)mm of specified sizes in uniform thickness hand packing ramming with hand complete job. | 7.12 | Cum | 1,200 | ₹8,544 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) using Nallah aggregates.incl.all complete .Excluding cement carriage. | 7.91 | Cum | 5,050 | ₹39,945.5 |
| 5 | Providing and Laying in position Cement concrete of specified grade including curing but excluding the cost of centering and shuttering.All work upto plinth level with 1:3:6 mix.(1 Cement :3 coarse sand 6 : aggregate 20mm nominal size)with 10% plum.using Nallah aggregates.complete .Excluding cement carriage. | 21.56 | Cum | 5,600 | ₹1,20,758.4 |
| 5.01 | Plums | 2.4 | Cum | 1,200 | ₹2,880 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. For mass concrete. | 157.25 | Sqm | 286.35 | ₹45,028.54 |
| 7 | Cement concrete flooring in 1:2:4 (1 cement: 2coarse sand: 4 graded stone agg., 20mm nominal size finished with a floating coat of neat cement slurry all inclusive leads, lifts, loading, un-loading, head load, cost and carriage of materials from approved nearest sources to site of work complete.50mm thick.Using Nallah agg.complete. | 26.21 | Sqm | 562.15 | ₹14,733.95 |
| 8 | Providing and placing in position 100mm thick factory made machine batched and machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage ,all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. | 10 | Sqm | 3,681.6 | ₹36,816 |
| 9 | Carriage of Materials by Mechnical means from source incl.loading unloading stacking of materials at work site all complete job.(paid as per actual site requirment).Cement avg.lead of 50km. | 6.08 | MT | 658.63 | ₹4,004.47 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1021577.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .