| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Work completed |
| 2 | L2₹5.7 L+₹28,744.50 (5.28%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹5.7 L+₹28,744.50 (5.28%) | L2 | Rejected-Finance 2nd lowest |
| 3 | L3₹6.0 L+₹50,861.50 (9.34%)Rejected-Finance | ₹6.0 L+₹50,861.50 (9.34%) | L3 | Rejected-Finance 3th lowest |
| 4 | L4₹6.3 L+₹83,886.50 (15.4%)Rejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹6.3 L+₹83,886.50 (15.4%) | L4 | Rejected-Finance 4th lowest |
| 5 | L5₹6.4 L+₹99,416.50 (18.3%)Rejected-Finance R O VILLAGE POST OFFICE DOHAG TEHSIL JOGINDER NAGAR DISTRICT MANDI H P | ₹6.4 L+₹99,416.50 (18.3%) | L5 | Rejected-Finance 5th lowest |
Tender Value
₹7.2 L
EMD Value
₹15,000
Closing Date
19 Sept 2024, 11:00 amClosed
Executive Engineer, Chamba Division, HPPWD Chamba
Executive Engineer, Chamba Division, HPPWD Chamba
Restoration of Rain Damages on Jhumar to Agar road Km. 0/0 to 4/700 (SH Construction of Retaining wall at RD 1/165 to 1/185)
2024_PWD_92914_1
No.PWC-WA-II/Contract/2023-24- 8377-476 dated 03.09.24
Open Tender
Civil Works - Roads
Item Rate
60 days
Chamba
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹15,000
19 Mar 2025
10 Sept 2024
19 Sept 2024
10 Sept 2024
19 Sept 2024
10 Sept 2024
Amount
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification section 300 and 1600 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated plain cement concrete 1:5:10 ( One cement is to five sand is to ten graded crushed stone aggregate 40mm (forty millimeter) nominal size in or under water including pumping or bailing out water( surface and sub soil water), dewatering for all heights /depths and any quantum of water including removal of slush which may arise at the time of laying under water for all heights/ depths, including the cost of form work and curing for 14 ( fourteen) days complete in Retaining walls and Breast walls etcetera as per drawings and MORD technical specification section 800, 900 and 1200 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Back filling behind abutments, return walls, wing walls and retaining walls etc. complete as per drawings and MORD technical specification section 1200 and 1600 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing 100mm (Hundred millimeter) diametre PVC pipe Weep holes in brick masonry/stone masonry, plain/reinforced concrete abutments, wing walls return walls and retaining /breast walls etc., extending through the full width of the structure with slope of 1 (V) : 20 (H) (one vertical is to twenty horizontal ) towards drawing face complete as per drawings and MORD technical specifications section 700 & 1200 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Sunil Kumar
VISHAL KUMAR
RAJENDER KUMAR
Abhishek Kumar
Anil Minhas
satishthakur&co.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .