Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.3 L+₹30,450.39 (3.38%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.3 L+₹33,450.42 (3.72%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹9.7 L+₹69,600.88 (7.73%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹9.9 L+₹88,351.12 (9.82%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
25 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Restoration of Soznipora Inner links
2026_PWDJK_325231_1
NIT_No_92_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
soznipora
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer RnB Division Budgam
₹30,000
28 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying nallah muck/GSB including leveling, watering an consolidation with power road roller of 8 to 12 tonne capacity to required gradient and camber, all carriage complete. | 240.9 | Cum | 1,000 | ₹2,40,900 |
| 2 | Providing, laying, spreading and compacting stone aggregate of size 63 mm to 45 mm to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fill up interstices of coarse aggregate, watering and compacting to the required density including carriage upto site of work. | 410.63 | Cum | 2,900 | ₹11,90,827 |
| 3Providing and laying in position RCC Spun Pipes including excavation of trenches, maintaining proper gradient, providing sand cushion, refilling the excavated soil and carriage of pipes to site of work, complete job. | |||||
| 3.01 | 12" Ø | 24.39 | Rm | 2,800 | ₹68,292 |
stage.html
html • 0.03 MB
finance_1098530.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1098530.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .