Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹27.1 L+₹31,920 (1.19%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST | |
| 3 | L3₹28.1 L+₹1.3 L (5.01%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST | |
| 4 | L4₹29.7 L+₹2.9 L (11.0%)Rejected-AOC | L4 | Rejected-AOC OTHER THAN LOWEST | |
| 5 | L5₹31.9 L+₹5.1 L (19.1%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
11 Jul 2020, 6:00 pmClosed
GE (N) Mamun
GE (N) Mamun C/O 56 APO
MAINTENANCE AND OPERATION OF CERTAIN WATER SUPPLY INSTALLATIONS OF D lll and DlV ZONE UNDER AGE EM ll OF GE North MAMUN
2020_MES_358173_1
GE(N)/M- /2020-21
Open Tender
Civil Works
Item Rate
304 days
GE (N) Mamun
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (N) Mamun
₹92,000
Yes
12 Sept 2020
3 Jul 2020
13 Jul 2020
3 Jul 2020
11 Jul 2020
6 Jul 2020
Amount
Maintenance and operation including routine maintenance of 07 (seven) water supply installations viz submersible/vertical turbine & centrifugal pump sets installed at tube wells/pump house alongwith chloronome plant, bleaching dozers & generating sets etc of any capacity/type /pattern including LT control panel & allied connected fittings/fixtures all as described here-in-after in three shifts each of 8 hrs per day including daily periodical maintenance by deployment of one skilled experienced technician per shift per installation (Total three technicians in consequitive three shifts 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs per day per installation) Tw No 23, 25, 26, 29, 36,41 & 42. Note:- i) DG set to be run during breakdown of commercial electric supply or as and when required/ directed by Engr-in-Charge including daily static run. ii) DHPP and Chlorine gas/Calcium Hypochloride etc will be issued free for use under Sch'B'. iii) Qty under col 3 is per shift. (iv) Surrounding area cleaning of pumping installation and minor repair like repair of starter, replacement of gland packing, flange gaskets, M-Seal and electric rewireable fuse wire with in the installation, operation of sluice valve of pumping mains and distribution main for smooth supply of water to users,complete all as specified and directed.
M/S ONKAR SINGH PATHANIA
AGGARWAL ASSOCIATES
GOLDEN CONSTRUCTIONS
M/S BALWINDER SINGH
satpal and brothers
M/S SINGHAL ENGINEERS
SATISH AND CO
RD Engineers
M/S SUKHMANI ENGINEERS
Standard engineers
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .