Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC NO 89 B KONGU NAGAR KARUMANDI SELLIPALAYAM VILLAGE PERUNDURAI TALUK ERODE DISTRICT 638 052 | ERODE | TAMIL NADU | 638052 | ₹1.8 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.9 CrRejected-AOC ERODE | ₹1.9 Cr | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | HariRam Constructions L2 | M.R.Thangaraj L1 |
|---|---|---|---|---|---|
| 1.00Construction of Vasantha mandapam for Arumigu Sellandiamman Thirukovil, Perundurai Town & Taluk, Erode District. | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete. | 170 | Cubic meter | 220 ₹37,400 | 220 ₹37,400 |
| 3.00 | Filling the foundation and basement with good quality of M. sand including cost and conveyance of all materials, labour charges etc., complete as per standard specification. | 10.5 | Cubic meter | 1,700 ₹17,850 | 1,620 ₹17,010 |
| 4.00 | Cement concrete 1:5:10 mix using 20mm HBG stone metal including cost and conveyance of all materials to site and labour charges including curing etc., complete. | 10.5 | Cubic meter | 5,200 ₹54,600 | 5,100 ₹53,550 |
| 5.00 | Random Rubble Masonry in Cement mortar 4:5 (One Cement and five M.sand) mix with simultaneously pointing using new stones and 10% including necessary provision of bond stones including simultaneous flush pointing with the same mortar etc., complete. | 66 | Cubic meter | 6,000 ₹4.0 L | 5,700 ₹3.8 L |
| 6.00 | Providing and laying , Standard Concrete Mix - 20 Grade in accordence with IS : 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.55, including admixtrure ( plasticiser / super plasticiser ) in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve stone jelly and with about ( 3.3 cu.m ) 5156 Kg .of 10 - 12 mm machine crushed stone jelly and with about ( 4.79 cu.m. ) 7670 Kg . of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying , vibrating with mechanical vibrators, finishing , curing, etc., and providing fixtures like fan clamps in the RCC floor / roof sabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. THe coarse and fine aggregates to be used should comply with the requirements of IS Stanards. ( No saparate payment will be made by the Department for the excess usage of materials). Upto basement | 3 | Cubic meter | 8,500 ₹25,500 | 8,300 ₹24,900 |
| 7.00 | Centering, shuttering for RCC works by using M.S sheets and angles etc. complete.for strutting charges Centering charges without Strutting charges | 13 | Square meter | 1,000 ₹13,000 | 950 ₹12,350 |
| 8.00 | Supply of fabrication of steel for reinforcement including all cost of steel, binding wire, labour charge and fabrication. | 0.3 | Metric Ton | 92,000 ₹27,600 | 90,000 ₹27,000 |
| 9.00Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc. | |||||
| 10.00 | Cut stone roughly dressed for Kalkaram vari vargams 5'-0" | 54 | Cubic meter | 20,000 ₹10.8 L | 19,500 ₹10.5 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
14 Aug 2025, 12:30 pmClosed
EXECUTIVE OFFICER
ARUMIGU SELLANDIAMMAN THIRUKOVIL PERUNDURAI TOWN AND TALUK ERODE DISTRICT
CONSTRUCTION OF VASANTHA MANDAPAM FOR ARUMIGU SELLANDIAMMAN THIRUKOVIL PERUNDURAI TOWN AND TALUK ERODE DISTRICT
2025_HRCE_586420_1
DIPR. 3676/TENDER/2025
Open Tender
Civil Works
360 days
ARUMIGU SELLANDIAMMAN THIRUKOVIL PERUNDURAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
2 Jan 2026
28 Jul 2025
14 Aug 2025
28 Jul 2025
14 Aug 2025
5 Aug 2025
Amount
Construction of Vasantha mandapam for Arumigu Sellandiamman Thirukovil, Perundurai Town & Taluk, Erode District.
Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete.
Filling the foundation and basement with good quality of M. sand including cost and conveyance of all materials, labour charges etc., complete as per standard specification.
Cement concrete 1:5:10 mix using 20mm HBG stone metal including cost and conveyance of all materials to site and labour charges including curing etc., complete.
Random Rubble Masonry in Cement mortar 4:5 (One Cement and five M.sand) mix with simultaneously pointing using new stones and 10% including necessary provision of bond stones including simultaneous flush pointing with the same mortar etc., complete.
Providing and laying , Standard Concrete Mix - 20 Grade in accordence with IS : 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.55, including admixtrure ( plasticiser / super plasticiser ) in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve stone jelly and with about ( 3.3 cu.m ) 5156 Kg .of 10 - 12 mm machine crushed stone jelly and with about ( 4.79 cu.m. ) 7670 Kg . of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying , vibrating with mechanical vibrators, finishing , curing, etc., and providing fixtures like fan clamps in the RCC floor / roof sabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. THe coarse and fine aggregates to be used should comply with the requirements of IS Stanards. ( No saparate payment will be made by the Department for the excess usage of materials). Upto basement
Centering, shuttering for RCC works by using M.S sheets and angles etc. complete.for strutting charges Centering charges without Strutting charges
Supply of fabrication of steel for reinforcement including all cost of steel, binding wire, labour charge and fabrication.
Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc.
Cut stone roughly dressed for Kalkaram vari vargams 5'-0"
Cut stone roughly dressed for Pillar , paukkal, Uthiram and Nillaikal 5'-10"
Labour charges for dressing cut stone Chitravanam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Aatharapeedam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Ubapeeda Padmajagathi 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Kandam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Ubapeeda Kabothagam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Pillar (Thun) 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Bothiyal 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Pristhra Thani Uthiram 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Kodungai 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Vyalavari 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Pavukal (ROOF) 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Supplying & Paving the 600mm x 600mm floor/steps with cut stone of 10cm thick and pointing in LM 1:1.5 including cost and conveyance of all materials, labour charges for dressing and paving and pointing etc., complete.(Single line dressing)
Brick work in CM 1:4 (One Cement and Four of Sand) . brick including all varivragams mould, sthamlam, muga pathiram koodu, Nasi and all ornamental – rick work complete all pachra agarai, karnakodu etc forming core walls of Rajagopuram complete including cost and conveyance of all materials including cement all the labour charges fitting of all materials to required height caring all extra for working height etc complete. Up to 15'0" Height. (Excluding Kalkaram)
Providing varagapoochu over the core walls of vimanams with Cement moratr 1 : 4 (One Cement and Four of Sand) by using with river sand complete including shaping the Mukka Pathram, Mahanasi, Koodu all ornamental works to proper shape, by bedding broken bricks or shapped, chiselled bricks, rough lastering with CM 1:4 and finishing with final ornamental plastering and Nayamtheervai including cost and conveyance of all materials, abour therefore, Lifting of materials, all working in heights curing with water etc. complete including all extra for folding and including clearing the debris from the Vimanam. - 15'0" Ht. (Excluding Kalkaram)
Proving new Sudhai Vagrahams in the Vimanam with Copper rod reinforcement of suitable dia with binding wire wherever necessary shaping the core with broken brick set in in Cement mortar 1:3 ( one of cement and three sand )finishing the same with in Cement mortar 1:4 ( one of cement and four sand ) bringing to the correct shape (prathima lakshna) in conformity with sirpa sastra inclusive of special ornamental weapons, peedam etc complete and providing nayam Theervai wherever necessary of cost and conveyance of all materials such as cement broken brick sand, GI rods binding ire all labour for working in height curing lifting of materials etc complete
Sudhai Vigraham 1’0” to 2’6”
Scaffolding charges for Vimanam using Camsurina pos or Palm tree for main work and providing for sides top shed with coconut leaves.15'0" height
Painting with multy colour good exterior emulsion paint complete for the Gopuram including cost and conveyance of all materials, labour charges, including Artist painter working in heights, lifting of materials, cost of brushes etc. complete - which include all extra for foldings. 100 sft. superficial. area.
Weathering course with concrete broken brick jelly of 20mm using Pollachi Lime guage in pure slacked lime.[No sand tobe used] over roof slab,the properties of brick jelly to lime being 32cft : 12.5cft well beaten with wooden beaters giving rquired slope and thickness of 75mm as directed by the departmental officers etc; complete complying with standard specification
Finishing the top of roof with one course of machine pressed tiles of size 23x23x2cm laid in Cement Mortar 1:3 20mm thick with water proofing compound with red oxide etc., complete.
GST Amount for providing Service to Government Contract Works for the above works at 18%(9%+9%). {GST Amount is the Total GST Amount for overall quoted amount}
HariRam Constructions (BID ID -1429172)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700488.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid