| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC 17 1 SANKAR COLONY PALAYAMKOTTAI TIRUNELVELI | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | ₹16.0 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | MARSHAL VIGNESH & CO L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositing on bank with initial lead of 10m & initial liftm of 2m, in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil asper standard specification 20.B including refilling charges in 2Km. Lead) | 267 | m3 | 91 ₹24,297 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 174 | m3 | 2,050 ₹3.6 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 1,158 | m2 | 75 ₹86,850 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,158 | m2 | 16 ₹18,528 |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 58 | m3 | 9,260 ₹5.4 L |
| 6.00 | Providing and Laying Bituminous Concrete 30/40mm thick using 0.13cum of 19-9.50mm graded metal and 0.17cum of 9.50-2.36mm graded metal and 0.26cum of 2.36mm & below metal with 45.27 Kgs of 60/70 bitumen & 5.03 Kgs of Plastic Waste (Total = 50.30 Kgs) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 - 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified graded and cross sections and compaction by vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 - 30 tonnes CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required including all other incidental charges etc., complete using CMP clause 507 of MORTH Rev-5 specifications. | 35 | m3 | 9,588 ₹3.4 L |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
23 Dec 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
1 Sn High Road Tirunelveli Municipal Corporation
Providing and Laying of B.T. Surface at 1) T. Nagar Main Road, 2) T. Nagar 1st Cross Street, 3) T. Nagar 2nd Cross Street in ward no. 43
2025_MAWS_633513_3
45/2025-26
Open Tender
Civil Works
1 Sn High Road Tirunelveli Municipal Corporation
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
20 Apr 2026
17 Dec 2025
23 Dec 2025
17 Dec 2025
23 Dec 2025
17 Dec 2025
Earthwork excavating and depositing on bank with initial lead of 10m & initial liftm of 2m, in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil asper standard specification 20.B including refilling charges in 2Km. Lead)
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and Laying Bituminous Concrete 30/40mm thick using 0.13cum of 19-9.50mm graded metal and 0.17cum of 9.50-2.36mm graded metal and 0.26cum of 2.36mm & below metal with 45.27 Kgs of 60/70 bitumen & 5.03 Kgs of Plastic Waste (Total = 50.30 Kgs) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 - 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified graded and cross sections and compaction by vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 - 30 tonnes CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required including all other incidental charges etc., complete using CMP clause 507 of MORTH Rev-5 specifications.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_757952.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_757952.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid