Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 CrAccepted-AOC 5TH FLOOR 0 BEE KAY TOWER G S ROAD VILLAGE TOWN GANESHGURI CITY GUWAHATI KAMRUP ASSAM 781006 INDIA | KAMRUP METRO | ASSAM | 781006 | ₹3.4 Cr Quoted ₹7.3 Cr | 1 | Accepted-AOC successful bidder |
| 2 | 1₹3.5 CrAccepted-AOC AA 57 KAILAS COMPLEX HIRANANDANI LINK ROAD VIKHROLI MUMBAI MAHARASHTRA 400079 | MUMBAI SUBURBAN | MAHARASHTRA | 400079 | ₹3.5 Cr Quoted ₹7.9 Cr | 1 | Accepted-AOC successful bidder |
| 3 | 2₹9.1 CrRejected-Finance | ₹9.1 Cr | 2 | Rejected-Finance L2 bidder for 120kw in BoQ3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
15 Mar 2023, 1:00 pmClosed
Managing Director
ASTC HO Paltanbazar
Supply and commissioning of 34 nos. of fast charger (120kW) for electric vehicle
2022_ASTC_27839_1
ASTC/FAMEi/1730/1234
Open Tender
Electrical Work/ Equipment
Item Wise
90 days
Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹10 L
Yes
Guwahati
31 May 2023
19 Nov 2022
15 Mar 2023
20 Nov 2022
15 Mar 2023
5 Dec 2022
30 Nov 2022
120 kW Electric Vehicle (EV) Off-Board DC Charger GB-T Protocol
120 kW Electric Vehicle (EV) Off-Board DC Charger GB-T Protocol
AMC Cost for the 1st Year after the end of warranty Period
AMC Cost for the 2nd Year after the end of warranty Period
AMC Cost for the 3rd Year after the end of warranty Period
AMC Cost for the 4th Year after the end of warranty Period
AMC Cost for the 5th Year after the end of warranty Period
Description of Work / Item(s)
120 kW Electric Vehicle (EV) Off-Board DC Charger CCS-2 Protocol
120 kW Electric Vehicle (EV) Off-Board DC Charger CCS-2 Protocol
AMC Cost for the 1st Year after the end of warranty Period
AMC Cost for the 2nd Year after the end of warranty Period
AMC Cost for the 3rd Year after the end of warranty Period
AMC Cost for the 4th Year after the end of warranty Period
AMC Cost for the 5th Year after the end of warranty Period
Description of Work / Item(s)
120 kW Electric Vehicle (EV) Off-Board DC Charger combination of CCS-2 Protocol & GB-T Protocol
120 kW Electric Vehicle (EV) Off-Board DC Charger combination of CCS-2 Protocol & GB-T Protocol
AMC Cost for the 1st Year after the end of warranty Period
AMC Cost for the 2nd Year after the end of warranty Period
AMC Cost for the 3rd Year after the end of warranty Period
AMC Cost for the 4th Year after the end of warranty Period
AMC Cost for the 5th Year after the end of warranty Period
BKSONS INFRASTRUCTURE PVT. LTD.
LABOTEK
Cloudstrats Technologies Pvt Ltd
LABOTEK
Cloudstrats Technologies Pvt Ltd
LABOTEK
BKSONS INFRASTRUCTURE PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .