| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | ₹14.5 L Quoted ₹12.1 L | L1 | Accepted-AOC Lowest quatation |
| 2 | L2₹12.2 L+₹12,524 (1.03%)Rejected-Finance | ₹12.2 L+₹12,524 (1.03%) | L2 | Rejected-Finance Highest Quatation |
| Sl No | Description | Qty | Unit | A.G.Iyappan L2 | Aravinth L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., in all incidential charges etc., complete as per standard specification for foundations SS 20B | 123 | m3 | 190 ₹23,370 | 183 ₹22,509 Lowest |
| 2.00 | Supply delivery and filling of Stone dust in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidental charges etc. complete as per standard specification. | 13 | m3 | 610 ₹7,930 | 599 ₹7,787 Lowest |
| 3.00 | Cement concrete of mix 1:4:8 ( One cement four sand eight aggregates ) using 40mm gauage hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidentail charges such as sheeting, shoring and bracing and their subsequent removal etc. complete as per standard specification. | 18 | m3 | 5,898 ₹1,06,164 | 5,886 ₹1,05,948 Lowest |
| 4.00 | Providing Centering, Strutting by using M.S. sheets and angles strutting arrangements for the sides and softest for RCC column , slab, lintel, bed lock T & L Beams, staircase waist slab, landing material at site and all labour charges and other incidental charges etc. complete for 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting | 384 | m2 | 478 ₹1,83,552 | 456 ₹1,75,104 Lowest |
| 5.00 | Plain Cement concrete of mix 1:3:6 ( One cement three M sand six aggregates ) using 40mm gauage hard broken including cost conveyance of all materials to site including formwork and centering labour charges, removal etc. complete as per standard specification | 136 | m3 | 6,635 ₹9,02,360 | 6,614 ₹8,99,504 Lowest |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
25 Sept 2025, 3:00 pmClosed
Executive Officer
Executive Officer Killai TP
CONSTRUCTION OF DRAIN AT SINGARAKUPPAM AND CONSTRUCTION OF RETAINING WALL AT MOZHI MUDANGAN MURUGANKOIL BACK SIDE IN KILLAI TOWN PANCHAYAT.
2025_DTP_607301_1
110/2025/A1
Open Tender
Civil Works
Works
90 days
Killai TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,500
Yes
5 Mar 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., in all incidential charges etc., complete as per standard specification for foundations SS 20B
Supply delivery and filling of Stone dust in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidental charges etc. complete as per standard specification.
Cement concrete of mix 1:4:8 ( One cement four sand eight aggregates ) using 40mm gauage hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidentail charges such as sheeting, shoring and bracing and their subsequent removal etc. complete as per standard specification.
Providing Centering, Strutting by using M.S. sheets and angles strutting arrangements for the sides and softest for RCC column , slab, lintel, bed lock T & L Beams, staircase waist slab, landing material at site and all labour charges and other incidental charges etc. complete for 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting
Plain Cement concrete of mix 1:3:6 ( One cement three M sand six aggregates ) using 40mm gauage hard broken including cost conveyance of all materials to site including formwork and centering labour charges, removal etc. complete as per standard specification
A.G.Iyappan (BID ID -1469362)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .