Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance NO 5 8 KANKATTI ALA PERIYAKUTTY MADUVU POST VAZHAPPADI TALUK SALEM 636101 | SALEM | SALEM | TAMIL NADU | 636101 | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.9 L (2.05%)Admitted-Finance 36 151 E 46 PERIYAR NAGAR THANGAMAPURIPATTENAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹1.5 Cr+₹2.9 L (2.05%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RATHNA AND CO L2 | Selliamman constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for section and levelling and depositing on bank with in all leads of 10m and initial lift 0f 2m of sand, soil or other loose soil, wet sand or silt noy under water, light black cotton soil, sandy foam and ordinary soil including gradient earth etc., complete as per standard specification | 459 | Cum | 72 ₹1,63,080 | 71 ₹1,60,815 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 167 | Cum | 208 ₹3,79,184 | 204 ₹3,71,892 Lowest |
| 3.00 | Providing and Laying Wet Mix Mecadam Using 0.396m3 of 45-22.40mm Graded metal, 0.528m3 of 22.40-2.36 mm graded metal and 0.396m3 2.36 and below size graded metal premixing with water to a densemass on a prepared subgrade / base to temple in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 1,078 | Cum | 1,950 ₹21,02,100 | 1,915 ₹20,64,370 Lowest |
| 4.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 8,694 | Sqm | 78 ₹6,78,132 | 76 ₹6,60,744 Lowest |
| 5.00 | Providing and laying tack coat of 2.50 kgs/10 sqm over the Prime surface treated with binder using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 8,694 | Sqm | 18.5 ₹1,60,839 | 17 ₹1,47,798 Lowest |
| 6.00 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH V Specifications | 1,606 | Sqm | 25 ₹40,150 Lowest | 25 ₹40,150 Lowest |
| 7.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 515 | Cum | 10,053 ₹51,77,295 | 9,856 ₹50,75,840 Lowest |
| 8.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm graded metal, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36mm & below metal by adding the shredded plastic 10% of Bitumen quantity 4.02kg(50.30X10%=5.03kg) shredded plastic waste over the aggregate heated to 170 degree celsius in the Central hot mix plant ,mixed well with 46.28kgs of hot bitumen VG30 bitumen (160 degree celsius) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminous concrete including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the minimum required temperature in central hot mix plant 20-30ton capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specifications. | 309 | Cum | 10,348 ₹31,97,532 | 10,145 ₹31,34,805 Lowest |
| 9.00 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflective glass beads @250gm/m2 area thick of 2.5mm as per IRC 35.The Finished surface to be level,uniform and free from holes complete as per the specification. | 471 | Sqm | 907 ₹4,27,197 | 890 ₹4,19,190 Lowest |
| 10.00 | Conveyance of excavated earth to lead of 3km from site including loading, unloading and conveyance charges etc. completed | 1,359 | cum | 80 ₹1,08,720 Lowest | 80 ₹1,08,720 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
20 Jan 2023, 3:00 pmClosed
COMMISSIONER GOBICHETTIPALAYAM MUNICIPALITY
COMMISSIONER GOBICHETTIPALAYAM MUNICIPALITY
Improvements to BT Road in Periyannan Street - 1 057029R0780, Palaniyappan Street 057029R0782 , Mariamman Koil Street 057029R0785, Anbu Nagar 1 street 057029R0790 in ward no 29 ,sengottaiyan colony (periyar nagar)-3 057030R0824,sengottaiyan colo
2023_MAWS_280783_1
2256 - 10 /2022/E1
Open Tender
Civil Works - Roads
Lump-sum
GOBICHETTIPALAYAM MUNICIPAL OFFICE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
25 Jan 2023
10 Jan 2023
20 Jan 2023
10 Jan 2023
20 Jan 2023
10 Jan 2023
Amount
Earthwork excavation for section and levelling and depositing on bank with in all leads of 10m and initial lift 0f 2m of sand, soil or other loose soil, wet sand or silt noy under water, light black cotton soil, sandy foam and ordinary soil including gradient earth etc., complete as per standard specification
Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Providing and Laying Wet Mix Mecadam Using 0.396m3 of 45-22.40mm Graded metal, 0.528m3 of 22.40-2.36 mm graded metal and 0.396m3 2.36 and below size graded metal premixing with water to a densemass on a prepared subgrade / base to temple in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying tack coat of 2.50 kgs/10 sqm over the Prime surface treated with binder using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm graded metal, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36mm & below metal by adding the shredded plastic 10% of Bitumen quantity 4.02kg(50.30X10%=5.03kg) shredded plastic waste over the aggregate heated to 170 degree celsius in the Central hot mix plant ,mixed well with 46.28kgs of hot bitumen VG30 bitumen (160 degree celsius) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminous concrete including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the minimum required temperature in central hot mix plant 20-30ton capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specifications.
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflective glass beads @250gm/m2 area thick of 2.5mm as per IRC 35.The Finished surface to be level,uniform and free from holes complete as per the specification.
Conveyance of excavated earth to lead of 3km from site including loading, unloading and conveyance charges etc. completed
Add for CGST 9% & SGST 9% on Civil work Total cost
RATHNA AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .