| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹56.0 L (18.9%)Admitted-Finance 103 MONALISA CHS HARINIWAS CIRCLE THANE WEST 400602 MAHARASHTRA INDIA | THANE | MAHARASHTRA | 400602 | ₹3.5 Cr+₹56.0 L (18.9%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹67.6 L (22.8%)Admitted-Finance | ₹3.6 Cr+₹67.6 L (22.8%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SSA TECHNO CONSTRUCTION PRIVATE LIMITED L3 | Sanrachana Structural Strengthening Pvt.Ltd L2 | CEMBOND CONSTRUCTIONS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00By Mechanical Transport including loading,unloading and stacking | ||||||
| 2.00 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Note - Item to be applicable in urban areas having directions for restricted hours for movement/plying of load carrying motor vehicle of 3.5 cum or more. | 626 | cum | 843.7 ₹5,28,156.2 | 1,650 ₹10,32,900 | 500 ₹3,13,000 Lowest |
| 3.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 24 | cum | 12,646.06 ₹3,03,505.44 | 17,800 ₹4,27,200 | 8,000 ₹1,92,000 Lowest |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||||
| 5.00 | Shelves (Cast in situ) | 158 | sqm | 1,180 ₹1,86,440 | 1,025 ₹1,61,950 | 600 ₹94,800 Lowest |
| 6.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 369 | sqm | 1,071.44 ₹3,95,361.36 | 1,175 ₹4,33,575 | 700 ₹2,58,300 Lowest |
| 7.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | ||||||
| 8.00 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,306 | kg | 113.28 ₹2,61,223.68 | 124 ₹2,85,944 | 80 ₹1,84,480 Lowest |
| 9.00Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : | ||||||
| 10.00 | Cement mortar 1:4(1 cement :4 coarse sand) | 135 | cum | 15,061.52 ₹20,33,305.2 | 11,950 ₹16,13,250 | 6,500 ₹8,77,500 Lowest |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
19 Dec 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer (Civil Division-III), Room No- MZ-137, Main Building, IIT Delhi, Hauz Khas, New Delhi-110016
Special Structural Repair work in B-Type 36 nos. houses (Third(top) floor and second floor) in east campus at IIT Delhi
2025_IIT_888670_1
IITD/WORKS (SP- 5194)/2025
Open Tender
Civil Works
Works
300 days
IIT Delhi Hauz Khas
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹7.8 L
29 Dec 2025
5 Dec 2025
22 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | By Mechanical Transport including loading,unloading and stacking | - | - | - | - |
| 2 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Note - Item to be applicable in urban areas having directions for restricted hours for movement/plying of load carrying motor vehicle of 3.5 cum or more. | - | cum | - | - |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| 5 | Shelves (Cast in situ) | - | sqm | - | - |
| 6 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | - | - | - | - |
| 8 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : | - | - | - | - |
| 10 | Cement mortar 1:4(1 cement :4 coarse sand) | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_934052.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .