| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.5 LAccepted-AOC | L-1 | Accepted-AOC LOW RATE | |
| 2 | L-2₹29.5 L+₹783.95 (0.03%)Rejected-AOC BUS STAND ROAD BARARA AMBALA | BARARA | AMBALA | L-2 | Rejected-AOC HIGH RATE | |
| 3 | L-3₹40.9 L+₹11.4 L (38.5%)Rejected-AOC | L-3 | Rejected-AOC HIGH RATE |
Tender Value
₹39.8 L
EMD Value
₹79,600
Closing Date
6 Jan 2022, 1:00 pmClosed
DY. CE
Office Room No. 310- 311, 2nd Floor, Shakti Sadan, Near Khalsa College, G. T. Road, Jalandhar
Construction of 66KV line from 220KV S/Stn. Jadla to 66 KV Karawar DC on DC towers 7.672 KM/0.2 sq inch ( replacement of existing SC towers/Rail Pole line 7.660 KM/0.15 sq inch )
2021_POWER_78764_1
22/PT-472/TLCJAL/2021-22
Open Tender
Miscellaneous Works
Item Rate
180 days
NAWANSHAHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹79,600
Yes
31 Mar 2022
9 Dec 2021
7 Jan 2022
9 Dec 2021
6 Jan 2022
9 Dec 2021
Laying of foundations, erection of towers, stringing and sagging of above 66KV line on labour rate basis, construction of tower foundations on lump sum basis as per PSPCL drawings, including excavation, placement of Steel reinforcement, concreting, stub setting form work, centering, shoring, shuttering back filling and other allied work required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications. The civil work’s material like crusher, sand have to be arranged by the contractor. All other material i.e. cement, Steel, tower, conductor, earth wire, disc-insulator, conductor, hardware fittings, stub setting, templates etc. shall be provided by PSPCL from its stores at Verpal ,MandiGobidgarh ,Bathinda,Civil Store Ludhiana,Central Store Jalandhar & Patiala free of cost.
Tower Type-A (D-2⁰) Normal Open Pit Foundation, Drawing No. CW/TT-3010
Tower Type-B (D-30⁰) Normal Open Pit Foundation, Drawing No. CW/TT-3011
Tower Type-C (D-60⁰) Normal Open Pit Foundation, Drawing No. CW/TT-3013
X-TYPE
Transportation and erection of towers complete with all fittings including tack welding (welding rods will be supplied by the Contractor) and Zinc paint to be supplied by the Contractor). Installation of danger plates, number plates, phase plates, circuit plates, bird guard and anti-climbing devices etc. on tonnage basis.
Transportation, installation of Insulator Strings complete with hardware installation & Stringing and Sagging of Conductor 0.2 Sq.” including fixing of conductor accessories for the 66 KV SC on D/C towers.
Transportation, installation of Insulator Strings complete with hardware installation & Stringing and Sagging of Conductor 0.2 Sq.” including fixing of conductor accessories for the 66 KV DC on D/C towers.
Transportation, installation, Stringing & Sagging of Earth wire 7/2.24MM at top of tower including fixing of Earth wire accessories.
Pit Marking
Straight towers
Angle Towers
Dism. of towers S-20 = 19 No. , 3 M=1 No., S -300 = 3 No., S-600= 5 No., AxA= 1 No.
Dism. of 4-RP
Dism. of ACSR 0.15 sq" S.ckt.
Dism. of E/W 7/2.24mm
Jain Brothers
Munish Kumar Contractor
SABRI CHISTI ELECTRICAL CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .