Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹2.1 L+₹3,200 (1.54%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹2.1 L+₹6,150 (2.96%)Accepted-Finance | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹2.3 L
EMD Value
₹4,500
Closing Date
7 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Restoration by strengthening of suction lines along with other allied works at LIS Kathar , LIS Meeni, , LIS Manwa, LIS Bhanara, LIS Fundwal , LIS Bal , LIS Saroh LIS Kah.
2020_IFC_105641_1
46/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹4,500
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
12 Oct 2020
28 Sept 2020
8 Oct 2020
29 Sept 2020
7 Oct 2020
29 Sept 2020
30 Sept 2020
180 days
Restoration by Strengthening of Suction lines of pumping unit no. 01 , 02, 03 & 04 installed at LIS Kathar . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of foot valves of pumping unit no. 1 ,2,3 & 4 at Kathar by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . a) Unit 1 &2 ( 250mm) b) Unit 3&4 (200 mm)
Restoration by Strengthening of 200 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Meeni . The job involves disconnecting the suction pipes , & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 200mm dia foot valves of pumping unit no. 1 & 2 at LIS Meeni by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . Complete Job
Restoration by Strengthening of 150 mm dia Suction lines of pumping unit no. 01 , 02 & 03 installed at LIS Manwa . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 150mm dia foot valves of pumping unit no. 1 ,2 & 3 at LIS Manwa by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . .
Restoration by Strengthening of 200 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Bhanara . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 200mm dia foot valves of pumping unit no. 1 & 2 at LIS Bhanara by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . Complete Job
Restoration by Strengthening of 150 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Fundwal . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 150mm dia foot valves of pumping unit no. 1 & 2 at LIS Fundwal by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS Complete Job
Restoration by Strengthening of 200 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Bal . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 200mm dia foot valves of pumping unit no. 1 & 2 at LIS Bal by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS .
Restoration by Strengthening of 200 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Saroh . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 200mm dia foot valves of pumping unit no. 1 & 2 at LIS Saroh by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . Complete Job
Desilting / Strengthening of 150 mm dia Suction lines of pumping unit no. 01 & 02 installed at LIS Kah . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. De-silting of 150 mm dia foot valves of pumping unit no. 1 &2 at Kah by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . Complete Job
BEE AAR ENTERPRISES
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .