Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance | ₹3.1 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹3.1 LAccepted-Finance CHUSHUL LADAKH | ₹3.1 L | L2 | Accepted-Finance Admitted |
| 3 | L3₹3.8 LAccepted-Finance | ₹3.8 L | L3 | Accepted-Finance Admitted |
| 4 | L4₹3.8 LAccepted-Finance STAKMO | ₹3.8 L | L4 | Accepted-Finance Admitted |
| 5 | L5₹4.0 LAccepted-Finance | ₹4.0 L | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S RIGZEN DAWA GOVT CONTRACTOR L4 | SIRAJ UD DIN L3 | M/S TSERING ANGCHOK L2 | M/S ZULFIQAR ALI GOVT CONTRACTOR L1 | M/S MOHD AMIR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of crate bunds. | ||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30 cmt in depth, 1.5mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead upto 50mt and lift upto 1.5mt as directed by the in charge. | 22.49 | cum | 647 ₹14,551.03 | 470 ₹10,570.30 | 120 ₹2,698.80 | 101 ₹2,271.49 | 200 ₹4,498 |
| 1.02 | Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires. | 123.22 | cum | 1,200 ₹1.5 L | 987 ₹1.2 L | 1,400 ₹1.7 L | 1,300 ₹1.6 L | 2,100 ₹2.6 L |
| 1.03 | Making knitted crate wire of approved mesh size, including weaving, binding sides and portions and binding top after filling, excluding cost of filling stones and weaving materials. | 18.62 | sqm | 146 ₹2,718.52 | 630 ₹11,730.60 | 80 ₹1,489.60 | 233 ₹4,338.46 | 67 ₹1,247.54 |
| 1.04 | Carriage of stone by mechanical transport for an average lead upto 25km approx. | 123.22 | cum | 500 ₹61,610 | 601 ₹74,055.22 | 200 ₹24,644 | 685 ₹84,405.70 | 200 ₹24,644 |
| 1.05 | Carriage of Crate material from Leh to Chuchot for an average of 30km | 0.99 | mt | 950 ₹940.50 | 494 ₹489.06 | 200 ₹198 | 1,400 ₹1,386 | 100 ₹99 |
| 1.06 | Cost of crate wire bunds. 16'x16'(4''x4'') mesh of 4mm dia. | 994.16 | kg | 156 ₹1.6 L | 165 ₹1.6 L | 110 ₹1.1 L | 58 ₹57,661.28 | 110 ₹1.1 L |
Tender Value
₹4.3 L
EMD Value
₹8,500
Closing Date
9 Feb 2026, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road Leh, UT of Ladakh
Construction of crate bund wire, protection bunds at Chow bagh chuchot 5nos, Shey Togar Bagh 6nos and Shey Old Bagh 6nos of Leh Forest Range for the year 2025-26 CAMPA scheme 52g Total 17nos.
2026_FEE_18429_1
e-Tender No 25 of FDL 2025-26
Open Tender
Civil Works - Others
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Divisional Forest Officer, Leh
₹8,500
24 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Construction of crate bunds.
Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30 cmt in depth, 1.5mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead upto 50mt and lift upto 1.5mt as directed by the in charge.
Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires.
Making knitted crate wire of approved mesh size, including weaving, binding sides and portions and binding top after filling, excluding cost of filling stones and weaving materials.
Carriage of stone by mechanical transport for an average lead upto 25km approx.
Carriage of Crate material from Leh to Chuchot for an average of 30km
Cost of crate wire bunds. 16'x16'(4''x4'') mesh of 4mm dia.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_44322.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid