INSPECTOR PARAMATHI VELUR DIVISION
OFFICE OF THE INSPECTOR, PARAMATHI VELUR DIVISION, VELUR PO. PARAMATHI VELUR TK, NAMAKKAL DT
Repair and renovation work for Arulmigu Veerateswarar Temple, Pillur, Paramathy Velur taluk Namakkal District.
2026_HRCE_667943_1
DIPR/1314/TENDER/2026
Open Tender
Civil Works
Item Rate
540 days
rulmigu Veerateswarar Temple, Pillur, Paramathy V
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
27 Feb 2026
27 Feb 2026
27 Mar 2026
27 Feb 2026
27 Mar 2026
2 Mar 2026
CONSTRUCTION OF A/m VEERATEESHWARAR & VINAYAKAR STONE MANDAPAM, SUB SANNATHY'S, CUT STONE FLOORING, RE PAINTING TO TEMPLE FOR ARULMIGU VEERATEESHWARAR TEMPLE - PILLUR - NAMAKKAL DIST.
Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete
Earth work open excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc (For kerb wall)., Complete
Filling the foundation and basement with good quality of M. sand including cost and conveyance of all materials, labour charges etc., complete as per standard specification.
Cement concrete 1:5:10 mix using 40mm HBG stone metal including cost and conveyance of all materials to site and labour charges including curing etc., complete.
Random Rubble Masonry in Cement mortar 1:2 mix with simultaneously pointing using new stones and 10% including necessary provision of bond stones including simultaneous flush pointing with the same mortar etc., complete.
Providing and laying , Standard Concrete Mix - 20 Grade in accordence with IS : 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.55, including admixtrure ( plasticiser / super plasticiser ) in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve stone jelly and with about ( 3.3 cu.m ) 5156 Kg .of 10 - 12 mm machine crushed stone jelly and with about ( 4.79 cu.m. ) 7670 Kg . of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying , vibrating with mechanical vibrators, finishing , curing, etc., and providing fixtures like fan clamps in the RCC floor / roof sabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. THe coarse and fine aggregates to be used should comply with the requirements of IS Stanards. ( No saparate payment will be made by the Department for the excess usage of materials). Upto basement
Centering, shuttering for RCC works by using M.S sheets and angles etc. complete.for strutting charges Centering charges without Strutting charges
Supply of fabrication of steel for reinforcement including all cost of steel, binding wire, labour charge and fabrication.
Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc.
Cut stone roughly dressed for Kalkaram vari vargams
Cut stone roughly dressed for Pillar , Pavukkal, Uthiram and Nillaikal
Labour charges for dressing cut stone Chitravanam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Aadarapeedam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Pillar (Thun) 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Bothiyal 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Thani Uthiram 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Kodungai 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Vyalavari 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Paukkal (roof) 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Ubapeeda Padmajagathi 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Kandam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Kabothagam 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Patham Kalvari 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Palagal 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tools and fixing in position etc.,
Labour charges for dressing cut stone Prasthiram 3 line dressed on all face set in Cement mortar 1:3 (One Lime and three M - Sand) including handling charges cost of tool
Supplying & Paving the floor/steps with cut stone of 10cm thick and pointing in LM 1:1.5 including cost and conveyance of all materials, labour charges for single line dressing and paving and pointing etc., complete
Brick work in lime mortar 1:4 (One Cement and Four of Sand) . Stock brick including all varivragams mould, sthamlam, muga pathiram koodu, Nasi and all ornamental – rick work complete all pachra agarai, karnakodu etc forming core walls of Rajagopuram complete including cost and conveyance of all materials including cement all the labour charges fitting of all materials to required height caring all extra for working height etc complete. Up to 15'0" Height.
Providing varagapoochu over the core walls of vimanams with lime mortar 1:1:5 by using with river sand complete including shaping the Mukka Pathram, Mahanasi, Koodu all ornamental works to proper shape, by bedding broken bricks or shapped, chiselled bricks, rough lastering with lime mortar 1:1:5 and finishing with final ornamental plastering and Nayamtheervai including cost and conveyance of all materials, abour therefore, Lifting of materials, all working in heights curing with water etc. complete including all extra for folding and including clearing the debris from the Vimanam. - 15'0" Ht.
Painting with multy panchavarnam colour good exterior emulsion paint complete for the Gopuram including cost and conveyance of all materials, labour charges, including Artist painter working in heights, lifting of materials, cost of brushes etc. complete - which include all extra for foldings. 100 sft. superficial. area.
Weathering course with concrete broken brick jelly of 20mm using Pollachi Lime guage in pure slacked lime.[No sand tobe used] over roof slab,the properties of brick jelly to lime being 32cft : 12.5cft well beaten with wooden beaters giving rquired slope and thickness of 75mm as directed by the departmental officers etc; complete complying with standard specification
Finishing the top of roof with one course of machine pressed tiles of size 23x23x2cm laid in lime Mortar 1:2 with water proofing compound with red oxide etc., complete.
Scrapping/removing/cleaning old paint/oil stain etc., from stone wall/Pavukkal including all labour charges, necessary requisite materials used for Paint removal etc., complete
Pointing in Lime mortar 1:1.5 to a depth of stones including cost and conveyance of all materials and all labour charges etc.complete and as directed by the departmental officer
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Supplying and painting two coats with approved weather froof Emlsuion over the the cement plastered wall surface , ceiling and other new surface including the cost of priming coat etc., complete in all floors, the make and colour of paint to be used shall be got approved.(kerb wall)
Painting two coats of newly plastered wall surface with water based emulsion paint of first class quality over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Scaffolding charges for Vimanans and gopurams with casuarinaprops, coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work -1 sqm,
Up to 15' height
Up to 25' height
Up to 50' height
Painting with Water based exterior emulsion paint complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Vimanam height upto 15'
Vimanam height upto 25'
Providing sudhai vigrahams Panchavarnam 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., in the vimanams and Rajagopurams inclusive of cost and converyance of all materials, Working in heihts, ect complete
Sudhai size above 2' 6" upto 3' 6"
Sudhai size above 3' 6" upto 4' 6"
Supplying and painting the walls with two coats of cement paint as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work)
Clean Floor finish & dadooing walls in cement mortar with, including lifting and clearing away and carefully stacking the materials useful for re-use if considered fit including conveyance etc., complete and as directed by the Departmental Officer.
Supplying and FILLING GRAVEL Supplying and filling in 'foundation and basement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification
Brick work in following Cement Mortar using best quality clay burnt bricks of size 9" x 4-3/8" x 2 3/4 " for foundation and basement including curing, etc., complete complying with standard specifiction (kerb wall)
Plastering walls with cement mortar 1:5 (One cement five M sand) 12mm thick in all floors and all exposed surfaces including cost and conveyance of materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above works at 18%(9%+9%). {GST Amount is the Total GST Amount for overall quoted amount}
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
VEERATESWARARPQ.pdf
Tender Documents • 0.37 MB
VEERATESWARARDRAWING.pdf
Additional Documents • 11.22 MB
BOQ_802526.xls
BOQ • 0.32 MB
VEERATEESWARARCORR13032026.pdf
PDF • 0.28 MB
PILLURCORR06032026.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .