Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 2ND FLOOR PARNIL COMPLEX ZOO ROAD TINALI GUWAHATI 24 | KAMRUP METRO | ASSAM | 781024 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 1A 1ST FLOOR BLOCK 1 SHRISTI DHARMESHWAR APPARTMENT DINESH OJHA PATH RAJGARH ROAD GUWAHATI 781005 | KAMRUP METRO | ASSAM | 781005 | Admitted-Fee/PreQual/Technical |
Tender Value
₹94.1 L
EMD Value
₹1.9 L
Closing Date
18 Aug 2026, 2:00 pmClosed
SE PWD Ghy Bldg Circle-II, Chandmari Ghy-3
O/o the SE PWD Ghy Bldg Circle-II Chandmari Ghy-3
Construction of New Classroom Building of Shankardev Shishu Niketan, Hengrabari, Dist. Kamrup (Metro) in continuation to Earlier Project
2026_PWBNH_53209_1
SE/BII_Shankardev Shishu Niketan_Classroom
Open Tender
Civil Works - Building
Item Wise
180 days
Hengerabari, Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.9 L
Yes
O/o the SE PWD Ghy Bldg Circle-II Chandmari Ghy-3
11 Sept 2026
23 Jul 2026
19 Aug 2026
23 Jul 2026
18 Aug 2026
27 Jul 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 1 | Cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials:
Ordinary or hard rock | - | Cum | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| 5 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 1 | Sqm | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 7 | CAST IN SITU
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 8 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1 | Sqm | - | - |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.67 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
SBDSSN.pdf
Tender Documents • 7.46 MB
BOQ_83810.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .