Loading…
Loading…
Tender Value
₹25.5 L
EMD Value
₹51,000
Closing Date
27 Jun 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Annual Shutdown Works for the year 2026 (Group - 2) of Dust collectors of Steel Melting Shop, Moulding Room and Wheel Final Processing Shop and other works.
RWF-M-OT-MMS-2026-27-23
RWF-M-OT-MMS-2026-27-23
Open
Works - General
12 Months
Bengaluru Urban, Karnataka
₹0
₹51,000
27 Jun 2026
5 Jun 2026
13 Jun 2026
16 items across 7 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,03,664 | ||
| — | 1.00 | — | — | ||
| 1. Replacement of dust collector filter bags at Sand Plant, Qty: 144 Nos a) Removal of filter bag assemblies b) Removal of cages from filter bags c) Repair of damaged cages d) Thorough cleaning of Hopper chamber e) Fitment of cage into filter bags f) Fitment of ventury pipes. g) Positioning and clamping of filter bag assembly h) Servicing of pulse cleaning valve Qty- 1 unit 2. Cleaning of Tunnel of Fume extraction system- 3. a) Removal of man hole covers at furnace basement - 3 nos. b) Opening of inspection covers at spark arrestor before commencement of work & closing at the end of the day c) Electrical lighting arrangement inside the tunnels d) Temporary arrangement of Ventilation fans inside the tunnels e) Removal of accumulated seepage water from the tunnel f) Clearing of partial burnt plastic bags from Tunnels g) Clearing of slag particles and wet dust from Tunnels h) Clearing of Fallen loose concrete scaling and bricks from tunnels and loading in to the Bins i) Chipping and Collection of accumulated solid dust from tunnels and filling into the bins j) Disposal of dust at a designated place k) Removal of Electrical lightings and ventilation fans from tunnels Qty- 1 unit 3. Replacement of Fabric filter bags of Fume extraction system - 3, Qty: 1344 numbers a) Removal of top covers, pulsing jet pipes and filter bag assemblies. b) Thorough cleaning of bag house hoppers c) Removal of cages from the bags d) Repair of damaged cages e) Fitment of new filter bags into cages f) Fitment of pulsing jet pipes g) Fixing of top covers and clamping h) Clearing of dust released from hoppers I) Disposal of filter bags at ear marked place Qty- 1 unit | — | — | — | 3,03,664 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf Part V Breakup of rates and schedul
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC doc
ATTACHMENT
PartVBreakupofratesandschedule.pdf
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .