| Sl No | Description | Qty | Unit | T SENTHILNATHAN L1 | UDAYAKUMAR L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Karur Avudaiyarkovil Road to Udayanasamuthiram Km 0/0 - 1/350 (R325) in Kannangudi Block | |||||
| 2.00 | Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers | 1,944 | Sqm | - | - |
| 3.00 | Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A | 1,620 | Cum | - | - |
| 4.00 | Picking the Existing Worn out BT Surface including all charges etc., complete. 0/0-1/1350 | 1,687.5 | Sqm | - | - |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | Km 0/0 - 1/0 | 150 | Cum | - | - |
| 7.00 | Km 1/0 - 1/350 | 52.5 | Cum | - | - |
| 8.00Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | |||||
| 9.00 | Km 0/0 - 1/0 | 154.69 | Cum | - | - |
| 10.00 | Km 1/0 - 1/350 | 98.44 | Cum | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
30 Sept 2020, 3:00 pmClosed
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
Upgradation / Strengthening of 2 Road work at Package No.TNSVG/25/KNG/ TNRRIS 2020-21 in Kannangudi Block of Sivagangai District.
2020_RDTN_180888_1
DIPR/3344/TENDER/20TNRRISP25KN
Open Tender
Civil Works - Roads
Item Rate
180 days
SIVAGANGAI
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹1.1 L
O/o The Project Director, DRDA, Sivagangai
24 Oct 2020
23 Sept 2020
30 Sept 2020
23 Sept 2020
30 Sept 2020
23 Sept 2020
25 Sept 2020
Amount
Strengthening of the road from Karur Avudaiyarkovil Road to Udayanasamuthiram Km 0/0 - 1/350 (R325) in Kannangudi Block
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Picking the Existing Worn out BT Surface including all charges etc., complete. 0/0-1/1350
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 14.6 kg. of bitumen per 10sqm. of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete.
Provision for KM Stone & HM Stone
KM Stone
HM Stone
Provision for Sign Board
Single Row Pipe Culvert @ Ch 427m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
Supplying and erecting centering shuttering including necessary supports for plane
Supply of NP3 Pipe including suitable collars including cost and conveyance at site etc., complete 900 mm dia pipes
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Two Row Pipe Culvert @ Ch 257m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
Supplying and erecting centering shuttering including necessary supports for plane
Supply of NP3 Pipe including suitable collars including cost and conveyance at site etc., complete 900 mm dia pipes
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Three Row Pipe Culvert @ Ch 724m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
Supplying and erecting centering shuttering including necessary supports for plane
Supply of NP3 Pipe including suitable collars including cost and conveyance at site etc., complete 900 mm dia pipes
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Sub total
Upgradation of the Road from Vengalore Vadakk Kudieruppu Road to Keelakadiyavayal Road Km 0/0-1/550 in Kannangudi Block.
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 14.6 kg. of bitumen per 10sqm. of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete.
Provision for KM Stone & HM Stone
KM Stone
HM Stone
Provision for Sign Board
Construction of 1.50m Span culvert @ Ch 238m & 295m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
Supplying and erecting centering shuttering including necessary supports for plane
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and fabricating and placing inposition mild steel or ribbed Tor steel for all reinforced cement concrete works as per the design given including cost of teel and binding wire in all floor etc. Completed complying with std specification the bind
Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Provision for Kraft Paper
provision for Expansion Joint
Provision for Weep holes
Construction of 1.50m Span culvert @ Ch 1155m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
Supplying and erecting centering shuttering including necessary supports for plane
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and fabricating and placing inposition mild steel or ribbed Tor steel for all reinforced cement concrete works as per the design given including cost of teel and binding wire in all floor etc. Completed complying with std specification the bind
Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Provision for kraft paper
provision for expansion joint
Provision for weep holes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
UDAYAKUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_216871.xls
BOQ • 0.32 MB
PriceBid25KNG2021.pdf
Tender Documents • 0.85 MB
TechnicalBid25KNG2021.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .