Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.7 L+₹15,463.31 (4.35%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S.KSM Engineering L1 | M/s. KSR Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling 4Nos mill outlet elbows/bends /inlet elbows after suitably supporting the adjacent coal pipes wherever required, removing, lowering them to ground floor from various heights (10mt to 32.5mt.) and placing them in Unit 1 as directed by the Engineer in-charge, including charges for temporary support, platform, scaffolding, cutting gas, welding electrode etc and hire charges for T&PS | 7.5 | Ton | 18,287 ₹1,61,839.95 Lowest | 19,082 ₹1,68,875.7 |
| 2.00 | Charges for reconditioning the eroded mill outlet elbows, bends, inlet elbows by patch welding if required, lifting the reconditioned mill outlet elbow bend/inlet elbow / new one and fitting them in correct position aligning with vertical straight pipe and renewal of victaulic coupling gasket 20L and aligning reassembling and also renewal of kicker blocks if necessary, removing the temporary supports including cost of consumables such as cutting gas, M.S. electrode etc. | 7.5 | Ton | 20,336 ₹1,79,973.6 Lowest | 21,220 ₹1,87,797 |
| 3.00 | Charges for dismantling the old worn out orifices on mill top assembling of new/old Orifice including hard facing positioning including consumables and T&P's Charges. cost of Consumables and T&P’s Charges. | 4 | Nos | 2,926 ₹13,810.72 Lowest | 3,054 ₹14,414.88 |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
18 Sept 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle AOH 26 27 MPM Dn Unit 1 Corners 3 4 Overhauling of worn out Fuel Inlet elbows by dismantling lowering to boiler floor Rectification Renewal aligning and assembling the new rectified Fuel inlet elbows and rectification of li
2026_EB_703637_1
CE SE MI NCTPS I 61 26 27
Open Tender
Power/Energy Projects/Products
Works
18 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,100
Yes
28 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling 4Nos mill outlet elbows/bends /inlet elbows after suitably supporting the adjacent coal pipes wherever required, removing, lowering them to ground floor from various heights (10mt to 32.5mt.) and placing them in Unit 1 as directed by the Engineer in-charge, including charges for temporary support, platform, scaffolding, cutting gas, welding electrode etc and hire charges for T&PS | 7.5 | Ton | 27,200 | ₹2,04,000 |
| 2 | Charges for reconditioning the eroded mill outlet elbows, bends, inlet elbows by patch welding if required, lifting the reconditioned mill outlet elbow bend/inlet elbow / new one and fitting them in correct position aligning with vertical straight pipe and renewal of victaulic coupling gasket 20L and aligning reassembling and also renewal of kicker blocks if necessary, removing the temporary supports including cost of consumables such as cutting gas, M.S. electrode etc. | 7.5 | Ton | 26,323 | ₹1,97,422.5 |
| 3 | Charges for dismantling the old worn out orifices on mill top assembling of new/old Orifice including hard facing positioning including consumables and T&P's Charges. cost of Consumables and T&P’s Charges. | 4 | Nos | 21,624 | ₹86,496 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_845775.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .