Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical PQC not meeting |
Tender Value
Refer Docs
Closing Date
20 Aug 2021, 3:00 pmClosed
JITENDRA KUMAR
IOCL PARADIP REIFNERY
Design, Supply, Installation, Testing and Commissioning of Wind Turbine Generator System at IOCL, Paradip Refinery.
2021_PDR_138139_1
PDR21M8342
Open Tender
Electrical - All
Supply
180 days
PARADIP REFINERY
Please refer Tender documents.
2 documents required · 2 mandatory
Exempted
18 Oct 2021
13 Jul 2021
21 Aug 2021
13 Jul 2021
20 Aug 2021
22 Jul 2021
Amount
Wind Turbine Generator System
WIND TURBINE GENERATOR SYSTEM-225KW
Instl & Comm. as per SCC-T(Annex-3)
1 year Non-CAMC as per SCC-T(Annex-E)
2 year Non-CAMC as per SCC-T(Annex-E)
3 year Non-CAMC as per SCC-T(Annex-E)
4 year Non-CAMC as per SCC-T(Annex-E)
5 year Non-CAMC as per SCC-T(Annex-E)
SOUTHERN GREEN POWER SERVICE
SOUTHERN GREEN POWER SERVICE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .