Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance PLOT NO 783 JAIL ROAD JHARPADA BHUBANESWAR PIN 751006 | KHORDHA | ODISHA | 751006 | -14.99% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance | -9.99% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical PLOT NO 92 DHAGABANPUR PATRAPADA BHUBANESWAR DIST KHURDA | BHUBANESWAR | KHURDA | ODISHA | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 11(a). |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
22 Jan 2026, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar
S.E. Electrical Circle (RandB) Bhubaneswar, nirman Soudha, Unit-V, 751001.
Shifting of 33KV, 11KV and LT line due to Road Widening Work from Komtalpeta-Muniguda-Tumbiguda (SH 5) from Location Matania cardboard Ind. Jhinjilibadi to IOCL Amlabhata Penta Road in the Dist. of Rayagada
2026_EICCL_124167_3
Bid Identification No.S.E.E.C (RandB) 24/2025-26
National Competitive Bid
Electrical Works
180 days
Rayagada
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.2 L
12 Mar 2026
3 Jan 2026
27 Jan 2026
3 Jan 2026
22 Jan 2026
3 Jan 2026
3 Jan 2026 - 15 Jan 2026
WPB 160x152 (30.44KG/Mtr.),13 mtr- with base plate 300x300x12
33KV F clamp
33KV V cross arm(22Kg),GI
GI Back Clamp for V cross arm(33KV)(1.7 kg each)
33 KV pin insulator polymer
HT Stay Set complete
7/10 SWG GI Stay wire , Grade-2
Stay Insulator
HT Stay Clamp (1.9 Kg / Pair)
Earthing Coil
6SWG GI Wire for earthing
148 mm sq. AAA Conductor
GI Nuts & Bolts of Assorted size
GI Barbed wire (Anti climbing device@3Kg. Per support)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Danger Board
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
Sundries (Pole Numbering, Zebra Paintinig, Binding wire etc)
WPB 160x152 (30.44KG/Mtr.),13 mtr- with base plate 300x300x12
Top Pressure channel 100x50x6mm,(3.5Mx6Pc)(9.2kg/mtr)
Bracing Channel (75x40x6)mm,GI channel 4mtr long 2nos (6.8kg/mtr)
Bracing Angle (50x50x6)mm G.I angle for 4.5Meter long 2 Nos (4.5kg/Mtr)
Disc insulator(B&S)90 KN polymer
HW fitting(B&S) 90 KN,4 bolt
33KV pin insulator polymer
P G Clamp for 148mm2AAAC
Fish Plate 50X8 mm., 3.14kg/Mtr., each 0.280 mtr. Length
HT Stay Set complete
7/10 SWG GI Stay wire , Grade-2
Stay Insulator
HT Stay Clamp (1.9 Kg / Pair)
Earthing device / Support Coil type (GI)
No-8 GI Wire Dia 4.6mm 0.131Kg/mtr - 2mtr each pole connecting pole with Coil earthing.
Danger Board
GI Clamp for Danger Board GI Flat(25X3 @0.6 Kg/Mtr) 510 mm length(0.306 Kg/Piece)
G I Barbed Wire anticlimbimg device 3. kg per support
GI clamp for anti Climbing Devicev25X3 mm Flat (0.6 Kg /Mtr) Flat of 0.510 Mtr Length =4 No.s /Pole(1.22 KG /Pole)
GI nuts,bolts and washers
Sundrise (Pole Numbering, Zebra Painting and other accessories etc)
13 Mtr long 160X152mm WPB pole(30.44KG/MTR)(395.72KG)GI
Earthing of support (coil type)
No.8 GI Wire (dia 4.6mm) 0.131Kg / Mtr 2Mtr for connecting pole with coil earthing
Top Pressure Channel 100x50x6 mm 3.5 mtr long 2Nos for top channel (@9.2kg/mtr) (Galvanized)
Channel 75x40x6 mm 3.5 mtr long 4Nos for bracing at DPs @ 6.8 Kg/mtr (Galvanized)
Angel 50x50x6mm 4.5mtr long 2Nos for cross bracing of DPs @ 4.5Kg/mtr (Galvanized)
33KV Disc Insulator (B & S) 90KN Polymer
Hard Ware Fitting (B & S) 90 KN, 3 bolt
Fish Plate 50x8 mm., 3.14kg/Mtr., each 0.280 mtr. Length
HT stay set complete
HT Stay insulator
HT Stay Clamp(1.9 Kg/Pair)
7/8 SWG G.I. Stay wire , Grade-2
Black Paint
G.I. barbed wire @3KG Per Pole
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Danger Plate
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI Nuts & Bolts of Assorted size
1C x 400 mm² 33KV XLPE Cable(Armoured),A2XFY (70X4)
Heat shrinkable jointing kit for 1Cx400 mm² 33KV XLPE Cable(outdoor type)
Clamp for pipe
Lightning Arrester(30 KV,10 KA) (Station Class,class-1)
GI pipe Earthing 40mm dia mediun gauge 2.5mtr long (6 nos. for LA, 3nos. for U.G Cable)
25x3 mm GI Flat, 0.6Kg/Mtr, 15 Mtr per earthing
Sundries
11 Mtr long 160X152mm WPB pole
9Mtr Long 300Kg PSC Pole
11KV F Clamp 2.9 kg each
11KV V Cross arm (10.2 Kg each)
G.I. Back clamp for V cross arm (11 KV) 0.85 each)
Disc Insulator (T&C) 45KN Polymer
Hardware (T&C) 45 KN
11 KV Pin Insulator Polymer
100x50x6mm GI channel for straight Cross arm 1.2Mtr &0.3Mtr (9.2Kg/Mtr)
HT Stay Set complete
7/10 SWG GI Stay wire , Grade-2
Stay Insulator
HT Stay Clamp (1.9 Kg / Pair)
Earthing Coil
6SWG GI Wire for earthing
RCC Base plate
80 mm sq. AAA Conductor
PG clamp for 80 mm² AAA conductor
GI Nuts & Bolts of Assorted size
GI Barbed wire (Anti climbing device@3Kg. Per support)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Danger Board
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
Sundries (Pole Numbering, Zebra Paintinig, Binding wire etc)
11 Mtr long 160X152mm WPB pole
Earthing of support (coil type)
No.8 GI Wire (dia 4.6mm) 0.131Kg / Mtr 2Mtr for connecting pole with coil earthing
Top Pressure Channel 100x50x6 mm 2.8 mtr long 2Nos for top channel (@9.2kg/mtr) (Galvanized)
MS Channel 75x40x6 mm 2.8 mtr long 2Nos for bracing at DPs @6.8 Kg/mtr(Galvanized)
MS Angel 50x50x6mm 3.5mtr long 2Nos for cross bracing of DPs @4.5Kg/mtr (Galvanized)
11KV Disc Insulator (B & S) 45KN Polymer
Hard Ware Fitting (B & S) 45 KN, 3 bolt
Fish Plate 50X8 mm., 3.14kg/Mtr., each 0.280 mtr. Length
HT stay set complete
HT Stay insulator
HT Stay Clamp(1.9 Kg/Pair)
7/8 SWG G.I. Stay wire , Grade-2
Black Paint
G.I. barbed wire @3KG Per Pole
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Danger Plate
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI Nuts & Bolts of Assorted size
1C x 300 mm² 11KV XLPE Cable(Armoured),A2XFY (70X4)
Heat shrinkable jointing kit for 1Cx300 mm² 11KV XLPE Cable(outdoor type)
Clamp for pipe
Lightning Arrester(12 KV,10 KA) Station Class
GI pipe Earthing 40mm dia mediun gauge 2.5mtr long
25X3 mm GI Flat, 0.6Kg/Mtr, 15 Mtr per earthing
Sundries
9Mtr long 300Kg PSC Pole
Pressure Channel (100X50X6) mm 2.8 mtr. long 2 nos. (9.2 Kg. / Mtr.) with Galvanizing
Transformer Mounting Channel (100x50X6)mm 2.8 mtr. long 2 nos. (9.2 Kg./Mtr.) with Galvanizing
AB Switch mounting channel (75X40X6) mm 2.8 mtr. long 2ns. (6.8 Kg. / Mtr.) with Galvanizing
HG fuse mounting channel (75X40X6) mm 2.8 mtr. long 2ns. (6.8 Kg. / Mtr.) with Galvanizing
Cantilever GI Chanel for supporting AB Switch arm, 75X40X6-1mtr. Long,2 nos(@6.8Kg/mtr)
Cantilever Angle for supporting AB Switch 50X50X6mm G.I Angel (1.)mtr long 2Nos)(@4.5Kg/Mtr)
Angle for mounting LT distribution box (50X50X6)mm(4.5 Kg./Mtr.) with Galvanizing
AB Switch side support channel 100X50X6mm 9.2Kg/Mtr, each channel length 0.35mtr, 2no's channel required
Channel support for down pipe 75X40X6mm, 6.8KG/Mtr, each channel length 0.8mtr,1no's channel required.
Transformer Belting angle (50X50X6) mm 3.5Mtr. Long 2 nos. (4.5 Kg./Mtr.) with Galvanizing
AB Switch (11 KV,400A,3 pole,50 Hz)
H.G. Fuse(11 KV,400 A,3 Pole)with PI
LA (9KV, 10KA) Station Class
Disc Insulator (T&C) 45KN Polymer
Hardware (T&C) 45 KN
HT Stay Set complete
7/10 SWG GI Stay wire , Grade-2
Stay Insulator
HT Stay Clamp (1.9 Kg / Pair)
40 mm nominal bore G.I. Pipe (medium gauge) Earthing Device with 3 Mtr. Long
GI Flat 25 x 6mm
Erection Charges for 25 KVA,11/0.4 KV(Al) Transformer,BIS Energy level-II
LT Distribution Box with MCCB Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S
G.I. Nuts & Bolts of Assorted size
55sqmm AAA conductor for jumpering
1Cx95 mm sq. LT XLPE Cable (armoured)
RCC Base Plate (500x500x10mm) for PSC pole (20Kg)
Earthing Coil
6SWG GI Wore
Danger Board
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI Barbed wire (Anti climbing device@3Kg. Per support)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Sundries (Pole Numbering, Zebra Painting, Insulation Tape etc)
8 Mtr long 300 Kg PSC pole
(3X35+1X25) mmsq AB Cable
Pole clamp for I hook
Dead end Clamp
Eye hook for Dead end Clamp
Suspension Clamp with I hook for ABC
G.I. Nuts & Bolts of Assorted size
LT Stay Set
LTStay Insulator
LT Stay Clamp (1.40 Kg / Pair)
7/12 SWG GI stay wire, Grade 2
RCC Base Plate for support
Earthing Device Coil type (G.I.)
6SWG GI Wire
GI Barbed wire (Anti climbing device@3Kg. Per support)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
Danger Board
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
Sundries (Pole Zebra Painting, Binding tape and other accessories etc)
9 Mtr. Long 300 Kg PSC pole
Base Plate for support
Top Pressure channel (100x50x6)MM GI 2.8Mtr. long, 2Nos.(9.2kg/Mtr)
Bracing channel (75x40x6)MM GI 2.8Mtr. long, 2Nos.(6.8kg/Mtr)
Bracing angle (50x50x6) MM GI angle, 4.0 Mtr. long, 2Nos. (4.5kg/mtr)
LT Stay Set complete
LT Stay Insulator
LT Stay clamp
7/12 SWG Stay Wire
LT Back clamp for Bracing Channel (0.85kg/No)
G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long
No 25 x 6 mm GI flat for earthing
Pole clamp for I hook
Suspension Clamp with I hook for ABC
G.I. Nuts & Bolts of Assorted size
Earthing Device Coil type (G.I.)
No.8 GI Wire (dia 4.6mm) 0.131Kg / Mtr 2Mtr for connecting pole with coil earthing
Danger Board
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI Barbed wire (Anti climbing device@3Kg. Per support)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
1.1KV,4CX300mm2 XLPE insulated armoured cable
JT. KIT O/D 1.1KV XLPE 4X300 SQ.MM HS
Clamp for holding of Pipe
Sundries (Pole numbering, Zebra Painting, Binding wore and other accessories etc)
Stay concreting in ratio 1:2:4 (0.5x0.5x0.8)mtr .
Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.307Cu.mtr
Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.44Cu.mtr
Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.62Cu.mtr
Couping of poles in ratio 1:1.5:3 (500X500X475)= 0.11875 Cu mtr
Material for earthing including masonary work for earth pit, and cement plate cover including salt, Charcoal etc.
Dismantling of 9/8 Mtr. PCC/Joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC.
Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC.
Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store
Dismantle-LT AB Cable with acces
Dismantling of Steel Structure ( Angle/ Channel/ Flat) and Nuts and Bolt including loading, transportation, unloading and staking of dismantled material at a proper place in safe position/BA site store
Supply & Laying of PIPE HDPE 110MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 110 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984
Supply & Laying/Mounting and fixing of HDPE Pipe -110 mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded)
Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing.
Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site.
Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface.
Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity.
Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards
PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout)
Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material
15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material.
Supply and erection of material for RCC partition slab 800mmx250mmx75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc.
Supply & Laying of PIPE HDPE 110MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 110 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984
Supply & Laying/Mounting and fixing of HDPE Pipe -110 mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded)
Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing.
Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site.
Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface.
Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity.
Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards
PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout)
Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material
15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material.
Supply and erection of material for RCC partition slab 800mmx250mmx75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc.
Supply & Laying of PIPE HDPE 110MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 110 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984
Supply & Laying/Mounting and fixing of HDPE Pipe -110 mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded)
Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing.
Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site.
Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface.
Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity.
Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards
PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout)
Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material
15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material.
Supply and erection of material for RCC partition slab 800mmx250mmx75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc. N:B:. Salvage Value @8% to be deducted from the Contractor's bill.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BOQ_574352.xls
BOQ • 0.65 MB
DTCN.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid