Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 Cr Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | ₹5.1 Cr | L1 | - |
| 2 | L2₹5.2 Cr+₹7.4 L (1.44%)Financial bid opened Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | ₹5.2 Cr+₹7.4 L (1.44%) | L2 | Financial bid opened |
| 3 | L3₹5.2 Cr+₹8.3 L (1.62%) Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | ₹5.2 Cr+₹8.3 L (1.62%) | L3 | - |
| 4 | L4₹5.4 Cr+₹30.5 L (5.96%) Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | ₹5.4 Cr+₹30.5 L (5.96%) | L4 | - |
| 5 | L5₹5.5 Cr+₹36.0 L (7.05%) Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa. | ₹5.5 Cr+₹36.0 L (7.05%) | L5 | - |
| Sl No | Description | Qty | Unit | M/S BHARAT ENGINEERING WORKS L1 | Aditya Kumar L3 | M/s Sonadhari Pandey L6 | M/s R.S.T. Construction L5 | M/s MOHD SAJID CONSTRUCTION, BIKANER L2 | SATHI ELECTRIC CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Component | - | - | -36.88 ₹4,51,41,251.41 Lowest | -36 ₹4,57,70,597.12 | -11.12 ₹6,35,63,916.75 | -31.91 ₹4,86,95,624.34 | -34.55 ₹4,68,07,587.21 | -33 ₹4,79,16,093.86 |
| 2 | Electrical Component | - | - | -22.54 ₹59,95,620.89 | -19.97 ₹61,94,546.08 | -7.12 ₹71,89,172.06 | -21.9 ₹60,45,158.68 | -34.55 ₹50,66,013.26 Lowest | -19 ₹62,69,626.8 |
Tender Value
₹7.9 Cr
EMD Value
₹15.9 L
Closing Date
27 Mar 2025, 3:00 pmClosed
EE(C)Mujafferpur
Raj Kumar
OFFICE OF EXECUTIVE ENGINEER, Muzaffarpur Central Division, CPWD, MSME Building, Goshala Road, Ramna
Construction of additional floor on existing Boys Hostel (160 Bedded Capacity) under DRPCAU, Pusa.
106392
19/NIT/SE(Muzaffarpur)/CPWD/2024-25
OPEN
Civil Works - Buildings
NCB
10 months
Samastipur, Bihar
7 documents required · 7 mandatory
₹15.9 L
Not Applicable
27 Mar 2025
13 Mar 2025
27 Mar 2025
27 Mar 2025
26 Mar 2025
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+19+Boys+Hostel+Pusa.pdf
document • 2.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .