| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹453.8 CrAdmitted-Finance | ₹453.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹560.0 CrAdmitted-Finance OLYMPIA CYBER SPACE 9TH FLOOR MODULE 2 PART OF THE 6TH OFFICE FLOOR 21 22 ALANDUR ROAD ARULAYAMMAN PETTAI 2ND STREET GUINDY INDUSTRIAL ESTATE CHENNAI 600032 TAMILNADU INDIA | CHENNAI | CHENNAI | TAMILNADU | 600032 | ₹560.0 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | International Seaport Dredging Ltd L2 | Van Oord Dredging and Marine Contractors bv L1 |
|---|---|---|---|---|---|
| 1.00Capital Dredging: | |||||
| 1.01 | Capital Dredging: Dredging from existing depths to ( - ) 18.0/19.5/20.50 m CD in the harbour basin areas , (-) 21.50m CD in the inner approach channel , (-) 23m CD in the outer approach channel (including extended portion) including side slopes & (-) 22.50m in the sand trap , and disposing at designated offshore disposal area along with ancillary works (boulders and cobbles up to size of 400 mm to be included as dredging quantity along with this item). The rate shall be inclusive of Survey Cost, men, material, equipment, fuel and transportation. The work includes cost of conducting all surveys, (Pre, Post and interim/progress surveys) cost/hire charges of survey launch, cost of fuel, all plants, labour, material, etc complete. (Exclusive of GST as applicable). Note:
The dredging carried out beyond the levels indicated in the Post-Dredge survey charts attached as ANNEXURE-19 shall be considered as Capital Dredging. | 1,32,32,000 | Cum | 391 ₹517.4 Cr | 294.5 ₹389.7 Cr |
| 2.00 | Maintenance Dredging Dredging in the Harbour Basin, Inner approach Channel, Outer Approach Channel, Sand Trap Area, Berth Pockets including Double handling if necessary from existing depths to Designed Depths (-) 16/16.5/16.7/18.0/ 18.50m,(-) 19m CD, (-) 15m to (-) 18m CD in the Sand Trap Area, (-) 20m CD in the Outer approach channel (including side slopes 1:5) and dredged material disposal evenly in the locations specified in the drawing KPL-NTCPWC-CD-PH-VI-2024-002 along with ancillary works. Complete as per detailed technical specifications, Special Conditions of Contract, General Conditions of Contract etc., and directions of the Engineer. The work includes cost of conducting all surveys, (Pre, Post and interim/progress surveys) cost/hire charges of survey launch, cost of fuel, all plants, labour, material, etc complete. (Exclusive of GST as applicable). Note:
No separate post dredge survey shall be carried out. The Quantity arrived at based on the Pre- Dredge Survey to be undertaken under this contract and the levels as per Post-Dredge survey charts and other charts attached as ANNEXURE-19 shall be considered for payment. | 2,10,000 | Cum | 204 ₹4.3 Cr | 205 ₹4.3 Cr |
| 3.00 | Environmental Monitoring Cost as per Bid document. The rate quoted shall be inclusive of men, material, equipment, tests, fuel and transportation. | 18 | Months | 7,24,000 ₹1.3 Cr | 14,90,000 ₹2.7 Cr |
| 4.00 | Mobilisation, de-mobilisation of equipment required for the entire scope of works including dredger and marine spread/ equipment required for the work as per the approved equipment schedule. | 1 | Ls | 37,02,43,000 ₹37.0 Cr | 57,12,96,200 ₹57.1 Cr |
Tender Value
₹380 Cr
EMD Value
₹4 Cr
Closing Date
16 Apr 2024, 3:00 pmClosed
GM CSBD
Kamarajar Port Limited 17 Jawahar building 3rd floor Rajaji Salai Chennai 600001
Capital Dredging phase VI to provide deep draft at Kamarajar Port
2024_MoS_795793_1
KPL/PPD/CD VI/2024
Global Tenders
Civil Works
540 days
Kamarajar Port Limited
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4 Cr
Kamarajar Port Limited
18 Oct 2024
16 Feb 2024
17 Apr 2024
16 Feb 2024
16 Apr 2024
11 Mar 2024
5 Mar 2024
Amount
Capital Dredging:
Capital Dredging: Dredging from existing depths to ( - ) 18.0/19.5/20.50 m CD in the harbour basin areas , (-) 21.50m CD in the inner approach channel , (-) 23m CD in the outer approach channel (including extended portion) including side slopes & (-) 22.50m in the sand trap , and disposing at designated offshore disposal area along with ancillary works (boulders and cobbles up to size of 400 mm to be included as dredging quantity along with this item). The rate shall be inclusive of Survey Cost, men, material, equipment, fuel and transportation. The work includes cost of conducting all surveys, (Pre, Post and interim/progress surveys) cost/hire charges of survey launch, cost of fuel, all plants, labour, material, etc complete. (Exclusive of GST as applicable). Note: The dredging carried out beyond the levels indicated in the Post-Dredge survey charts attached as ANNEXURE-19 shall be considered as Capital Dredging.
Maintenance Dredging Dredging in the Harbour Basin, Inner approach Channel, Outer Approach Channel, Sand Trap Area, Berth Pockets including Double handling if necessary from existing depths to Designed Depths (-) 16/16.5/16.7/18.0/ 18.50m,(-) 19m CD, (-) 15m to (-) 18m CD in the Sand Trap Area, (-) 20m CD in the Outer approach channel (including side slopes 1:5) and dredged material disposal evenly in the locations specified in the drawing KPL-NTCPWC-CD-PH-VI-2024-002 along with ancillary works. Complete as per detailed technical specifications, Special Conditions of Contract, General Conditions of Contract etc., and directions of the Engineer. The work includes cost of conducting all surveys, (Pre, Post and interim/progress surveys) cost/hire charges of survey launch, cost of fuel, all plants, labour, material, etc complete. (Exclusive of GST as applicable). Note: No separate post dredge survey shall be carried out. The Quantity arrived at based on the Pre- Dredge Survey to be undertaken under this contract and the levels as per Post-Dredge survey charts and other charts attached as ANNEXURE-19 shall be considered for payment.
Environmental Monitoring Cost as per Bid document. The rate quoted shall be inclusive of men, material, equipment, tests, fuel and transportation.
Mobilisation, de-mobilisation of equipment required for the entire scope of works including dredger and marine spread/ equipment required for the work as per the approved equipment schedule.
International Seaport Dredging Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_836575.xls
BOQ • 0.27 MB
dredging_tender_final.pdf
Tender Documents • 10.72 MB
Download all tender documents and submit your bid