Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC 2H 703 ANNAI THERESA NAGAR 2ND STREET TUTICORIN 628008 | TUTICORIN | TAMIL NADU | 628008 | ₹2.5 L Quoted ₹2.6 L | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical 47 A ANNA NAGAR 3RD STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | - | - | Not Admitted-Fee/PreQual/Technical Others-BQR Condition No 1 not satisfied |
| Sl No | Description | Qty | Unit | RELIABLE ENGINEERS |
|---|---|---|---|---|
| 1.00 | Charges for replacement/ Overhauling the wornout 300/250/200 NB plate/ gate/ Butterfly/ NRV Valves. | 21 | Nos | 68,880 ₹81,278.40 |
| 2.00 | Charges for replacement/ Overhauling the wornout 150 NB plate/ gate/ Butterfly/ NRV Valves | 33 | Nos | 70,620 ₹83,331.60 |
| 3.00 | Charges for replacement / Overhauling the wornout 100/80 NB/plate Butter fly/ gate/ NRV valves. | 47 | Nos | 83,190 ₹98,164.20 |
| 4.00 | Material cost contractor scope:
Supply of Rubber gasket ( 80 NB) | 25 | Nos | 1,650 ₹1,947 |
| 5.00 | Material cost contractor scope:
Supply of Rubber gasket (100 NB) | 18 | Nos | 1,512 ₹1,784.16 |
| 6.00 | Material cost contractor scope:
Supply of Rubber gasket ( 150 NB) | 8 | Kg | 3,680 ₹4,342.40 |
| 7.00 | Material cost contractor scope:
Supply of Rubber gasket ( 200 NB) | 20 | Nos | 3,600 ₹4,248 |
| 8.00 | Material cost contractor scope:
Supply of Rubber gasket (300 NB) | 4 | Nos | 1,080 ₹1,274.40 |
| 9.00 | Material cost contractor scope:
Supply of grease | 3 | Kg | 1,770 ₹2,088.60 |
| 10.00 | Material cost contractor scope:
Supply of 16 mm dia x65 to 90 mm length fully thread bolt and nuts with 2 Nos ( if requires) | 120 | Nos | 15,600 ₹18,408 |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
17 Dec 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle O E II FPS Overhauling of fire hydrant gate valves in various sizes 300 250 200 150 100 and 80 NB
2025_EB_628125_1
CE/SE/O/TTPS/Spec.No.236/25-26
Open Tender
Miscellaneous Works
120 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,800
Yes
CE/TTPS
10 Mar 2026
2 Dec 2025
18 Dec 2025
2 Dec 2025
17 Dec 2025
2 Dec 2025
2 Dec 2025
Charges for replacement/ Overhauling the wornout 300/250/200 NB plate/ gate/ Butterfly/ NRV Valves.
Charges for replacement/ Overhauling the wornout 150 NB plate/ gate/ Butterfly/ NRV Valves
Charges for replacement / Overhauling the wornout 100/80 NB/plate Butter fly/ gate/ NRV valves.
Material cost contractor scope: Supply of Rubber gasket ( 80 NB)
Material cost contractor scope: Supply of Rubber gasket (100 NB)
Material cost contractor scope: Supply of Rubber gasket ( 150 NB)
Material cost contractor scope: Supply of Rubber gasket ( 200 NB)
Material cost contractor scope: Supply of Rubber gasket (300 NB)
Material cost contractor scope: Supply of grease
Material cost contractor scope: Supply of 16 mm dia x65 to 90 mm length fully thread bolt and nuts with 2 Nos ( if requires)
Material cost contractor scope: Supply of Hex headed bolt and nuts with Two washers ( M 12 x75 mm ) if requires
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_750976.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid