| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 Cr+₹2.9 L (1.52%)Rejected-Finance | ₹1.9 Cr+₹2.9 L (1.52%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
2 Jun 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District - R S Mangalam Block - 23/MGSMT/2025-26
2025_RDTN_559354_3
R3/1988/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹1.9 L
24 Jul 2025
19 May 2025
2 Jun 2025
19 May 2025
2 Jun 2025
19 May 2025
Amount
Part I -Strengthening to the Road From Sethurastha road to sea show road (via) Mariyamman kovil km 0/0 -1/700(R-193)
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
KM Stone
60 cm Equilateral Traingle cautionary Sign board
60 Cm Circle (Mandatory ) Sign Board
CONSTRUCTION OF 6.00M SPAN CULVERT CH-400M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum (ABOVE SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Supply and Fixing of PVC or Compressible Fibre Board Expension Joints in between Deck Slab and Dird Wall including all labour charges etc complete..
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing weepholes in brick masonry stone masnory, plain / reinforced concrete abutment, wing wall,return wall, with 100mm dia AC pipe extending through the full width of the structures with slope of 1(v) 20(h) towards drawing face complete as per drawing and technical specification clauses 614,709,1204,3.7
Part II-Strengthening to the Road From Sethuratha - Gandhi nagar (via) resankadai vadamalai puram street Km 0/0-1/200
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
60 cm Equilateral Traingle cautionary Sign board
CONSTRUCTION OF 1.50M SPAN CULVERT CH-235M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
CONSTRUCTION OF 1.50M SPAN CULVERT CH-350M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
CONSTRUCTION OF 1.50M SPAN CULVERT CH-550M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
CONSTRUCTION OF 1.50M SPAN CULVERT CH-610M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
CONSTRUCTION OF 1.50M SPAN CULVERT CH-735M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
CONSTRUCTION OF 1.50M SPAN CULVERT CH-850M
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.(BELOW SILL)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen pad
Supply and Fixing ofKraft Paper for full width of seting of Deck slab including all labour charges etc complete..
Provision for Abutment PVC Seepage Pipes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G SIVAKUMAR (BID ID -1355508)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .