Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
14 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
Above/Below/Par
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less crores; whereV= Advertised value of thetender in crores of RupeesN= Number of years prescribed for completion of work for which bids have been invited.The average annual contractualturnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.The tenderers shall submit requisite information as per Annexure-VIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formulated as Annexure-D. Tenderer shall furnish Annexure-V and annexure-XIX both duly certified by Chartered Accountant.
Definition Of Similar Work : - Engineering survey works (with or without Geotechnical / Soil Exploration work)
62 conditions · 7 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mandatory in case Bid security amount is prescribed in STD Para 5.1.2 - The Bid Security shall be deposited in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure-XXXII and shall be valid for a period of 90days beyond the bid validity period.
I/We have read the various conditions to tender attached here to and agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for a period as mentionedin NIT header from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our "Bid security". I/We offer to do the work for North Western Railway,at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within time period as mentioned in the NIT Header from the date of issue ofletter of acceptance of the tender.
I/We also hereby agree to abide by the General Conditions of Contract-2022 corrected up- to- date and to carry out the work according to the Special Conditions of Contract and Indian Railways Unified Standard Specifications (Materials and Works) 2021 as corrected up-to-date, Unified Standard Schedule of Rates of North-Western Railway - 2021 as corrected up-to-date & C P W D DSR-2023 and Specification 2019 (for the present contract)
I/We have read in detail the various conditions as detailed in clause 5 "Completion Period" of "Additional Special Conditions "of tender and confirm here toand agree to and abide by the said Conditions. The proposed work as detailed in scope of work, mentioned in milestones & specified in the contract documents should be completed within 14 months from the date of issue of the acceptance letter including monsoon as per Milestone. Resource mobilization by the agency will be arranged in amanner that the works can be commenced in parallel in all block section from Jaloda Jageer to Nimach section. If the contractor fails to complete the work as per given milestone in para 5 of "Additional Special Conditions" of tender, Railway will be entitled without prejudice to any other right and remedy available on that behalf, to recover damages as per clause 17B of SGCC.
Carrying Out Final location Survey, Geotechnical Investigations, Hydrological Studies, design, Preparation of Drawings, and Other Preliminary Activities for preparation of DPR, EPC Tender Documents for the Chittorgarh -Mavli - Debari & Umra-Debari Double Line Project (99.00 KM +24.782 KM)
COR-DRB-UMRA-T-02~NWR
COR-DRB-UMRA-T-02
Open
Works - General
180 Days
Udaipur, Rajasthan
₹0
₹4.5 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
27 items across 2 schedules · ₹1,61,43,468.36 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area. | — | — | — | — | |
| 1 | 0m to 10m | Metre | 1433.00 | 1,300.48 | 18,63,587.84 |
| 2 | 10m to 20m | Metre | 359.00 | 1,343.29 | 4,82,241.11 |
| Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing water with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR. | — | — | — | — | |
| 3 | 0m to 10m | Metre | 96.00 | 1,560.57 | 1,49,814.72 |
| 4 | 10m to 20m | Metre | 24.00 | 1,611.95 | 38,686.8 |
| 5 | Extra for 150mm dia. bore in hard Rock/large Boulder at all levels | Metre | 148.00 | 2,282.52 | 3,37,812.96 |
| Drilling of NX size borehole (75mm dia.) in all types of hard rock and collection of rock core samples from boreholes and preserving in boxes. | — | — | — | — | |
| 6 | 0m to 10m | Metre | 1180.00 | 3,189.64 | 37,63,775.2 |
| 7 | 10m to 20m | Metre | 148.00 | 3,418.43 | 5,05,927.64 |
| 8 | Taking out 100mm dia. & 450mm long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720. | Each | 2259.00 | 152.52 | 3,44,542.68 |
| 9 | Taking out 100mm dia. & 450mm long disturbed samples of soil from bore holes, including provision of air tight containers for packing, labeling and transporting the samples to laboratory. Samples shall be collected as per IS:2720. | Each | 565.00 | 164.57 | 92,982.05 |
| 10 | Conducting standard penetration test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge | Each | 1275.00 | 852.27 | 10,86,644.25 |
| Conducting laboratory Tests on collected soil samples as per relevant IS code | — | — | — | — | |
| 11 | Moisture Content/Dry Density | Each | 1275.00 | 287.66 | 3,66,766.5 |
| 12 | Atterberg Limits | Each | 1275.00 | 586.02 | 7,47,175.5 |
| 13 | Specific Gravity | Each | 1275.00 | 631.51 | 8,05,175.25 |
| 14 | Grain size analysis including Hydrometer analysis | Each | 1275.00 | 727.84 | 9,27,996 |
| 15 | Direct Shear Test | Each | 179.00 | 2,330.69 | 4,17,193.51 |
| 16 | Consolidation Test | Each | 179.00 | 6,886.37 | 12,32,660.23 |
| Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code | — | — | — | — | |
| 17 | Density Test | Each | 984.00 | 301.04 | 2,96,223.36 |
| 18 | Water Absorption & Porosity | Each | 984.00 | 301.04 | 2,96,223.36 |
| 19 | Hardness | Each | 984.00 | 167.24 | 1,64,564.16 |
| 20 | Unconfined Compression Test | Each | 984.00 | 2,144.71 | 21,10,394.64 |
| Schedule total | ₹1,60,30,387.76 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022CorrectionSlip5to12.pdf
ATTACHMENT
SafetycircularNWR.pdf
ATTACHMENT
Conditionmaster11.4.pdf
ATTACHMENT
AdditionalspecialConditionandspecialTechnicalconditionandsecificationofcontractforNSItems_compressed.pdf
ATTACHMENT
STANDARDTENDERDOCUMENTS114.pdf
ATTACHMENT
GCC2022uptoACS4.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].