Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance HOUSE NO 85 BBDC ROAD PO SILONIJAN PS BOKAJAN KARBI ANGLONG 782460 | SILONIJAN | KARBI ANGLONG | ASSAM | 782460 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹7,815.18 (0.08%)Admitted-Finance | ₹1.0 Cr+₹7,815.18 (0.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Binit Saha L1 | Sarsing Engti L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land .(Clearing and
grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of treescut earlier and disposal of unserviceable materialsand stacking of serviceable materials to beused orauctioned up to lead of 1000metres includingremoval and disposal of top organic soil notexceeding 150mm thickness.(I) By Manual Means.A.In area of light jungle | 1.18 | Hect | - | - |
| 2.00 | Construction of Subgrade and Earthen
Shoulders (Construction of subgrade and earthen
shoulders with approved material obtained from
borrow pits with all lifts & leads, transporting to
site, spreading, grading to required slope and
compacted to meet requirement of table (300-2)
(a), ( Including cost of testing of materials at site
and laboratory as directed by the deptt.). a) From private land | 680 | Cum. | - | - |
| 3.00 | Providing , laying and rolling of build-up spray grout layer over prepared base consisting of a two layer composite construction of crushed coarse aggregates using motor grader for aggregates .......layer to sub as a base, conferming to the line grades and cross-section specified, the compected layer thickness being 75mm as per technical specification clause 505. By manual means, bitumen (S90) | 759.38 | Sqm. | - | - |
| 4.00 | Providing and applying track coat with bitumen emulsion (RS-1) pressure emulsion distributor at the rate of 0.25-0.30 kg. Per spm. On the prepared bituminous /granular surface cleaned with Hydraulic broomas per technical specification Clause 503 | 5,062.5 | Sqm. | - | - |
| 5.00 | Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixwd with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade,level and alignment and rolled to achieved the desired compaction as per Technical Specification Clause. 504. | 247.45 | Cum. | - | - |
| 6.00 | Semi - Dense Bituminous Concrete
(Providing and laying semi dense bituminous
concrete with 100-120 TPH batch type HMP
producing an average output of 75 tonnes per
hour using crushed aggregates of specified
grading, premixed with bituminous binder @
4.5 to 5% of mix and filler transporting the hot
mix to work site, laying with a hydrostatic paver
finisher with sensor control to the reqd. grade,
lavel and alignment,rolling with smooth
wheeled,vibratory and tandem rollers to achieve
the desired compaction as per MoSRT&H cl.
no.508. complete in all respect. (including
carriage of mixed materials up to 10.0 Km initial
lead from mixing plant )( Including cost of
testing of materials at site and laboratory as
directed by the deptt.)A.With hydrated lime/cement as filler ( refer
table 500-9 of MoSRT&H specification).I.with 60/70 or VG-30 grade bitumen.(i)for Grading I ( 13 mm nominal size ) | 126.56 | Cum. | - | - |
| 7.00 | Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&Hs fixed to the road surface using adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance. | 190 | mtr | - | - |
| 8.00 | Hume Pipe Culvert :- Earth work in excavation of foundation of structures as per drawing and technical specification clause305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matterial and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 81.73 | Cum | - | - |
| 9.00 | Dismantling of Structures :- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T &P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By manual means (B) Cement Concrete | 16.62 | Cum | - | - |
| 10.00 | Removing all types of Hume pipes and stacking within a lead of 1000 m includingEarthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
(B) Above 600 mm to 900 mm dia Hume pipe | 75 | RM | - | - |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
5 Feb 2020, 4:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
Kar/AD19-20/02 Improvement of road of Bormanthi Rongkher Shade under Assam Darshan for the year 2019-20.
2020_PWD_16002_129
CE/Maint/A.D./404/2019/2
Open Tender
Civil Works
Item Rate
180 days
Karbi Anglong
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,100
Empowered Officer, ASRB
₹2.0 L
Yes
O/o the Chief Engineer, PWD (Roads), Assam
5 Mar 2020
25 Jan 2020
6 Feb 2020
25 Jan 2020
5 Feb 2020
25 Jan 2020
25 Jan 2020 - 1 Feb 2020
28 Jan 2020
Amount
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of treescut earlier and disposal of unserviceable materialsand stacking of serviceable materials to beused orauctioned up to lead of 1000metres includingremoval and disposal of top organic soil notexceeding 150mm thickness.(I) By Manual Means.A.In area of light jungle
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.). a) From private land
Providing , laying and rolling of build-up spray grout layer over prepared base consisting of a two layer composite construction of crushed coarse aggregates using motor grader for aggregates .......layer to sub as a base, conferming to the line grades and cross-section specified, the compected layer thickness being 75mm as per technical specification clause 505. By manual means, bitumen (S90)
Providing and applying track coat with bitumen emulsion (RS-1) pressure emulsion distributor at the rate of 0.25-0.30 kg. Per spm. On the prepared bituminous /granular surface cleaned with Hydraulic broomas per technical specification Clause 503
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixwd with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade,level and alignment and rolled to achieved the desired compaction as per Technical Specification Clause. 504.
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)A.With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification).I.with 60/70 or VG-30 grade bitumen.(i)for Grading I ( 13 mm nominal size )
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&Hs fixed to the road surface using adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.
Hume Pipe Culvert :- Earth work in excavation of foundation of structures as per drawing and technical specification clause305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matterial and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Dismantling of Structures :- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T &P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By manual means (B) Cement Concrete
Removing all types of Hume pipes and stacking within a lead of 1000 m includingEarthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (B) Above 600 mm to 900 mm dia Hume pipe
Plain Cement Concrete M 10 (1:3:6 nominal mix) in levelling course below open foundation of Head Walls as per drawings & Technical Specification Clause 1109
Laying (First Class) bedding on well compacted approved granular material as per Clause 1105(ii)
Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 (A) BrickMasonry in 1:4 cement mortar
Providing & Laying Reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (B) 1000mm dia
Plastering with cement mortar (1:4),15mm thick on brickwork in substructure as per Technical specifications clause 613.4 & 1204.
Approach Road :-Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401 (I) For Grading II Material
WBM Grading III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the requied density grading 3 as per technical specification clause 405 (A) By manual means
Providing and laying of Interlocking Concrete Block Pavement having thickness 80mm as per Technical specification clause 1504 (iv) Rates are inclusive of C C Edge Block.
Routine Maintanence for 1st year
Routine Maintanence for 2nd year
Routine Maintanence for 3rd year
Sarsing Engti
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.87 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Tendernotice_3.pdf
PDF • 0.05 MB
BOQ_24454.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .