| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-AOC | ₹1.1 L | 1 | Accepted-AOC Financially Qualified |
| 2 | 2₹1.1 LRejected-AOC | ₹1.1 L | 2 | Rejected-AOC Financially Not Qualified |
| Sl No | Description | Qty | Unit | S RAVI L1 | K MURTHY L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for Cutting BT Road including cost and conveyance of materials etc., completed | 10 | m3 | 920 ₹9,200 | 950 ₹9,500 |
| 2.00 | Earth work pipe line excavated in all charges of soils and sub soils except hard rock requiring blasting with initial lead and lift including etc, complete as per SS20B all other incidental charges etc, complete | 45 | m3 | 165 ₹7,425 | 170 ₹7,650 |
| 3.00 | Supply and delivery of 90mm PVC 6 KSC Pipe including cost and conveyance of materials cost etc.,complete 90mm PVC Pipe | 110 | Mtr | 210 ₹23,100 | 220 ₹24,200 |
| 4.00 | Lowering and Jointing of 90mm PVC Pipe 6KSC including all labour charges etc, complete. | 110 | Mtr | 25 ₹2,750 | 27 ₹2,970 |
| 5.00 | Supply and delivery of following PVC Pipe specials including all the cost and conveyance of materials etc complete 90mm PVC Bend | 2 | No | 170 ₹340 | 175 ₹350 |
| 6.00 | 90mm PVC Coupling | 2 | No | 100 ₹200 | 100 ₹200 |
| 7.00 | 90mm PVC Tee | 2 | No | 110 ₹220 | 120 ₹240 |
| 8.00 | 90mm PVC Elbow | 2 | No | 145 ₹290 | 150 ₹300 |
| 9.00 | 90mm x 63mm PVC Reducer Coupling | 2 | No | 40 ₹80 | 45 ₹90 |
| 10.00 | Refilling with excavated soil and other sand including all labour charges etc, complete as per standard specification. | 50 | Mtr | 32 ₹1,600 | 35 ₹1,750 |
Tender Value
₹1.3 L
EMD Value
₹1,300
Closing Date
17 Oct 2025, 3:00 pmClosed
Commissioner Tirupathur Municipality
Tirupathur Municipality
Providing PVC Water Supply Distribution Pipe line to Jinna Road 3 Near Madarasa at ward No 8 in Thirupathur Municipality.
2025_MAWS_613463_1
0595/2025/E1
Open Tender
Civil Works
90 days
Tirupathur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,300
Yes
12 May 2026
11 Oct 2025
17 Oct 2025
11 Oct 2025
17 Oct 2025
11 Oct 2025
Amount
Labour charges for Cutting BT Road including cost and conveyance of materials etc., completed
Earth work pipe line excavated in all charges of soils and sub soils except hard rock requiring blasting with initial lead and lift including etc, complete as per SS20B all other incidental charges etc, complete
Supply and delivery of 90mm PVC 6 KSC Pipe including cost and conveyance of materials cost etc.,complete 90mm PVC Pipe
Lowering and Jointing of 90mm PVC Pipe 6KSC including all labour charges etc, complete.
Supply and delivery of following PVC Pipe specials including all the cost and conveyance of materials etc complete 90mm PVC Bend
90mm PVC Coupling
90mm PVC Tee
90mm PVC Elbow
90mm x 63mm PVC Reducer Coupling
Refilling with excavated soil and other sand including all labour charges etc, complete as per standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
K MURTHY (BID ID -1488591)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_732970.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
BOQ_732970.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid