| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.9 CrAccepted-AOC 31 | ₹15.9 Cr Quoted ₹6.0 Cr | L-1 | Accepted-AOC Approved |
| 2 | L-2₹6.3 CrRejected-Finance | ₹6.3 Cr | L-2 | Rejected-Finance Reject |
| 3 | L-3₹6.8 CrRejected-Finance | ₹6.8 Cr | L-3 | Rejected-Finance Reject |
| 4 | L-4₹7.4 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹7.4 Cr | L-4 | Rejected-Finance Reject |
| 5 | L-5₹7.5 CrRejected-Finance | ₹7.5 Cr | L-5 | Rejected-Finance Reject |
Tender Value
₹9 Cr
EMD Value
₹18 L
Closing Date
18 Dec 2023, 12:00 pmClosed
SE PWD Mainpuri Circle Mainpuri
OFFICE OF THE SE PWD MAINPURI CIRCLE MAINPURI
Widening and Strengthening work of Sirsaganj Abadi Portion Sirsaganj Araon Road ODR And also Construction of Divider Footpath RCC Drain under Rajya Sadak Nidhi 2023 24 in District Firozabad
2023_CEAGR_869811_1
5646/7M-Mainpuri Circle/2023 dt. 04.12.2023
Open Tender
Civil Works
180 days
Widening and Strengthening work of Sirsaganj Abadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹18 L
Yes
Mainpuri
11 Feb 2024
12 Dec 2023
18 Dec 2023
12 Dec 2023
18 Dec 2023
12 Dec 2023
12 Dec 2023 - 18 Dec 2023
15 Dec 2023
Amount
Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 301)
Construction of Subgrade and Earthen Shoulders. Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. but 3.00 Km carted earth Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 305)
Mechanically compaction of earth work compacted to 95% proctor density in ordinary soil, excavation to be done form of regular pits not exceeding 0.5mtr in depth and work in embankment to be in 20cm layer including ramming and dressing pulverization surfacing including supply of labour, T&P, Roller and water sprinkler etc. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST.(SI 253(a))
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 401)-B
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (SI -3(4.1)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 601)
Construction of un-reinforced, Dowel jointed plain cement concrete pavement over a prepared sub base with 43 grade cement coarse and fine aggregate conforming to IS 383, as per approved design mix maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, dowel bars, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 602)
Providing and fixing PVC pipe conforming to IS make working pressure 4 Kg/SqCm incuding testing labour T&P and all complete fittings 110 mm diameter Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST.
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (SI-251)
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its waistage Bend, hooks, binding wire and authorized over lapping shall be measured upto floor to level. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) i) upto plinth level Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (SI No-12 (5.2)
Applying priming coat and painting Coat over new steel or other surface upto 10cm. In width or girth or small not exceeding 0.10 Sq.M. area after and including preparing the surface by thoroughly clearing oil, grease, dirt and other foreign matter and scoured with wire brushed, fine steel/wood. Scrapper, sand papering and knotting including cost of all materials, labour T&P etc. required for proper completion of work. (2 Coat) Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST.
M/S R.N.AGRAWAL
Garg Re Surfacing and Construction
RAM SANEHI AND SONS
shree ram stone supliers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid