Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC 3 238 VENKATESA LAYOUT S V MILLS POST UDUMALPET 642 128 | UDUMALPET | TIRUPPUR | TAMIL NADU | 642128 | ₹16.6 L | L1 | Accepted-AOC L1 bidder
Less than the technically sanction amount |
| 2 | L2₹16.9 LRejected-AOC NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | ₹16.9 L | L2 | Rejected-AOC L2 bidder |
| 3 | Not Admitted-Fee/PreQual/Technical NO 1 4 56 Y SRI BHARATHI NAGAR OPP PARVATHI THEATER CUMBUM ROAD THENKARAI PERIYAKULAM THENI DT 625 601 | PERIYAKULAM | THENI | TAMIL NADU | 625601 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sp Constructions L2 | vasanthaconstructions L1 |
|---|---|---|---|---|---|
| 1.00Chipping and Cement Morar pointing | |||||
| 1.01 | Providing and laying PCC 1:2:4 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge. | 11 | M3 | 9,500 ₹1,04,500 Lowest | 10,000 ₹1,10,000 |
| 1.02 | Dismantling of Plain Cement Concrete including cost of all materials, lead, lift, curing labour charges etc., complete complying with standard specification and as directed by Engineer - in-charge. | 11 | M3 | 1,000 ₹11,000 Lowest | 1,100 ₹12,100 |
| 1.03 | Chipping raised pointing and removing downstream side masonry mortar joint upto average depth of 50mm and removing the loose materials and clearing the joints, packing joints for 25mm with cm 1:2 with hammering and packing rod of different sizes and filling with cm 1:3 for 25mm top depth and 20mm thick raised pointing for 65mm width over the racked joints in CM 1:3 including cost of all materials, T&Ps, labour, hire charges for suspension platform with all lead and lifts, etc. complete as per specification and as directed by Engineer in charge to the upstream face area. | 210 | M2 | 6,250 ₹13,12,500 | 6,100 ₹12,81,000 Lowest |
| 2.00GST fo bidders within Tamilnadu. Heading | |||||
| 2.01 | SGST | 1 | percentage | 9 ₹1,28,520 | 9 ₹1,26,279 Lowest |
| 2.02 | CGST | 1 | percentage | 9 ₹1,28,520 | 9 ₹1,26,279 Lowest |
| 3.00GST fo bidders within Tamilnadu. Heading | |||||
| 3.01 | IGST | 1 | percentage | - | - |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
25 May 2026, 2:00 pmClosed
SE/Civil/DRIP/TNGECL/Madurai
TNEB Complex, Race Course Road, K.Pudur, Madurai - 625007
Dam Rehabilitation and Improvement works Chipping and Cement Mortar pointing on the downstream face of the Dam below Geomembrane area in Kadamparai Generation Circle, Coimbatore District, Tamilnadu under the World Bank Funded DRIP (Phase II and III
2026_EBMDB_676589_1
SE/C/DRIP/MDU/001/2026-27
Open Tender
Civil Works
Item Rate
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹18,000
Yes
15 Jun 2026
11 May 2026
25 May 2026
11 May 2026
25 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Chipping and Cement Morar pointing | |||||
| 1.01 | Providing and laying PCC 1:2:4 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge. | 11 | M3 | - | - |
| 1.02 | Dismantling of Plain Cement Concrete including cost of all materials, lead, lift, curing labour charges etc., complete complying with standard specification and as directed by Engineer - in-charge. | 11 | M3 | - | - |
| 1.03 | Chipping raised pointing and removing downstream side masonry mortar joint upto average depth of 50mm and removing the loose materials and clearing the joints, packing joints for 25mm with cm 1:2 with hammering and packing rod of different sizes and filling with cm 1:3 for 25mm top depth and 20mm thick raised pointing for 65mm width over the racked joints in CM 1:3 including cost of all materials, T&Ps, labour, hire charges for suspension platform with all lead and lifts, etc. complete as per specification and as directed by Engineer in charge to the upstream face area. | 210 | M2 | - | - |
| 2GST fo bidders within Tamilnadu. Heading | |||||
| 2.01 | SGST | - | percentage | - | - |
| 2.02 | CGST | - | percentage | - | - |
| 3GST fo bidders within Tamilnadu. Heading | |||||
| 3.01 | IGST | - | percentage | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_813001.xls
BOQ • 0.27 MB
specification.pdf
Tender Documents • 3.87 MB
TenderNotice.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].