| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -51.00% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L1₹4.9 LAdmitted-Finance | -51.00% | ₹4.9 L | L1 | Admitted-Finance |
| 3 | L2₹5.4 LAdmitted-Finance | -45.81% | ₹5.4 L | L2 | Admitted-Finance |
| 4 | L3₹5.5 LAdmitted-Finance | -45.05% | ₹5.5 L | L3 | Admitted-Finance |
| 5 | L4₹5.5 LAdmitted-Finance | -45.01% | ₹5.5 L | L4 | Admitted-Finance |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
14 Jan 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Waterproofing on the roof of Govt flat at New and old B.C, Jammu. CNO-570 NP
2026_PWDJK_299974_7
Short e-NIT No. 118 of 2025-2026 Dated 06-01-2026
Open Tender
Civil Works
45 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹20,000
Office of the PWD RandB PROJECT DIVISION III JAMMU
23 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
14 Jan 2026
6 Jan 2026
9 Jan 2026
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.
Providing and fixing chromium plated brass curtain rod having wall thickness of 1.25mm with two chromium plated brass brackets fixed with C.P. brass screws and PVC sleeves etc., wherever necessary complete : 9.46.3 25 mm dia
Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand)
Providing and fixing of PVC Panneling on walls 8 to 10 mm thick incl all fittings and fixtures complete (wall affair or any eqviv. Make)
Engaging of labour for shifting of rubish material /cutting & clearance of various works .... Unskilled cleaning of site after the execution of work: Un-skilled Labour.
Engaging trolley for shifting of mulba from site to beyond the muncipality limit including loading and unloading.
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
15mm Cement plaster on the rough side of single or half brick wall ofmix: 1 : 6 ( 1 cement : 6 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_973308.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid