| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-Finance | ₹25.9 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹27.2 LAccepted-Finance | ₹27.2 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | MSC ENTERPRISES | UDAYAPPA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth. | 150 | M3 | 15,300 ₹18,054 | 14,550 ₹17,169 |
| 2.00 | Refilling with excavated soil for filling in foundation and basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete. | 93.2 | M3 | 4,380.4 ₹5,168.87 | 4,100.8 ₹4,838.94 |
| 3.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 13 | M3 | 83,720 ₹98,789.60 | 79,924 ₹94,310.32 |
| 4.00 | Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 600 | M2 | 3,60,600 ₹4.3 L | 3,43,800 ₹4.1 L |
| 5.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 100 | M3 | 10,94,900 ₹12.9 L | 10,45,200 ₹12.3 L |
| 6.00 | Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete. | 10,000 | Kg | 10,30,000 ₹12.2 L | 9,80,000 ₹11.6 L |
| 7.00 | Providing and laying with two-part elastomeric fuel resistance, UV resistant, Non-toxic once cured, resistant to flame, pouring grade liquid polysulphide sealant to fill the expansion joint, Control joints in parking area, construction joint in airport runway, Tanks, bridges & concrete roads. The sealant shall have Elongation min. 450% confirms to ASTM D 412, movement accommodation for butt joint 25% & for lap joints 50%. The sealant should meet the requirement of BS 5212, BS 4254 & ISO:11600. Ensure that apply a coat of polysulphide sealant primer @0.5L/m2 to get better adhesion on prepared surface before placing the sealant. The finished cost including surface preparation, filling foam backer rod, applying masking tape on both sides of the joint & polysulphide sealant filling on gap completely as per specification | 29 | Rm | 6,206 ₹7,323.08 | 5,916 ₹6,980.88 |
| 8.00 | Providing and fixing well point system for dewatering for emptying water from underground storm water drain (or) otherwise as instructed for 2 Nos 10HP vacuum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost etc., complete. | 24 | Shift | 1,22,136 ₹1.4 L | 1,16,568 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹21,800
Closing Date
9 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Improvement Works to the Dwarf Wall along NLC Compound Wall 302.5 W Road West side from 175 S Road to 263 S Road at TTPS
2026_EB_646618_1
CE SE C TTPS Spec.No. 370 25 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,800
Yes
11 Feb 2026
23 Jan 2026
10 Feb 2026
23 Jan 2026
9 Feb 2026
23 Jan 2026
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth.
Refilling with excavated soil for filling in foundation and basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete.
Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Providing and laying with two-part elastomeric fuel resistance, UV resistant, Non-toxic once cured, resistant to flame, pouring grade liquid polysulphide sealant to fill the expansion joint, Control joints in parking area, construction joint in airport runway, Tanks, bridges & concrete roads. The sealant shall have Elongation min. 450% confirms to ASTM D 412, movement accommodation for butt joint 25% & for lap joints 50%. The sealant should meet the requirement of BS 5212, BS 4254 & ISO:11600. Ensure that apply a coat of polysulphide sealant primer @0.5L/m2 to get better adhesion on prepared surface before placing the sealant. The finished cost including surface preparation, filling foam backer rod, applying masking tape on both sides of the joint & polysulphide sealant filling on gap completely as per specification
Providing and fixing well point system for dewatering for emptying water from underground storm water drain (or) otherwise as instructed for 2 Nos 10HP vacuum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_775075.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid