| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC AT AKULIKANA PO SARASADA P S BHANDARIPOHKARI DIST BHADRAK PIN 756120 | SARASADA | BHADRAK | ODISHA | 756120 | ₹3.6 L | L1 | Accepted-AOC successful Bidder selected through transparent lottery system |
| 2 | L1₹3.6 LRejected-AOC AT KANPADABINDHA PO KANPADA PS TIHIDI DIST BHADRAK PIN 756130 ODISHA | TIHIDI | BHADRAK | ODISHA | 756130 | ₹3.6 L | L1 | Rejected-AOC Unsuccessful Bidder selected through transparent lottery system |
| 3 | L1₹3.6 LRejected-AOC AT GHANTESWAR PO BIRIADIA DISTRICT BHADRAK PIN 756129 | BHADRAK | ODISHA | 756129 | ₹3.6 L | L1 | Rejected-AOC Unsuccessful Bidder selected through transparent lottery system |
| 4 | L1₹3.6 LRejected-AOC BASUDEVPUR BASUDEVPUR BHADRAK 756125 | BHADRAK | ODISHA | 756125 | ₹3.6 L | L1 | Rejected-AOC Unsuccessful Bidder selected through transparent lottery system |
| 5 | L1₹3.6 LRejected-AOC AT SAYA PO DEULIPADA PS TIHIDI DIST BHADRAK PIN 756130 | BHADRAK | ODISHA | 756130 | ₹3.6 L | L1 | Rejected-AOC Unsuccessful Bidder selected through transparent lottery system |
Tender Value
₹4.2 L
EMD Value
₹4,236
Closing Date
5 Dec 2025, 4:00 pmClosed
Executive Engineer
O/O the Superintending Engineer, R.W.Division, Bhadrak
Repairs of Buildings
2025_CERWI_122125_10
TCN 15 of 2025-26
Open Tender
Civil Works - Buildings
30 days
Bhadrak
PAN,GST,RC and other relevant document as per DTCN
3 documents required · 3 mandatory
₹2,000
₹4,236
Yes
7 Apr 2026
28 Nov 2025
6 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
28 Nov 2025 - 5 Dec 2025
Dismantling and removing R.C.C. Columns, beams,slab, staircase landing lintels includingstacking the useful material for reuse and removing the debris within 50 meter lead.as per specification and direction of the Engineer-In-charge. Second floor
RCC work of M-20 grade Column having a minimum compreshive srength 150kg per cm2 in 150mm cubes at 28 days curing after mixing and test conducted in accordance with I.S 456 and I.S 516 using black hard crusher broken granaite chipsof 20mm and down-grade size not exceeding 25percent of approved quality including hoisting and laying placing in position concrete watering and curing for 28 days including cost of rigid and smooth stool centering and shuttering with C.M plaster 1:2 at no extra cost where necessery and cost, conveyance, royality and taxes of all materials labour required for the work etc. complete but excluding cost of M.S. Rod or Tor steel and binding and tying the grills and placing in position etc.complete. The materials used in the work and finished item of work shall confirm to relevant I.S specification and as per specification and direction of the Engineer-In-charge. The testing charges will be borne by the contractor Second floor
Lintel Second floor
Chajja Second floor
Wall beam Second floor
Roof slab Second floor
Providing HYSD bar reinforcement Fe 415 MS round bars required for R.C.C. works including cost and conveyance of tested M.S. or T.S. rods and binding wire of 18 to20 gauge, including labour charges for straightening , cutting,bending,binding,and welding if required and tying the grills and placing in proper position as required incase of availability of rods in Departmental store,the same can be supplied to the contractor at prevailing stock issue rate of grade S 240 and S 415 confirming to IS 432 and IS 1786 respectively with approved design etc complete as per Specification and direction of Engineer-In - charge. Second floor
Fly Ash Brick masonary brick size of 25x12x8 c.m having crushing srength not less than 75kg per cm2 with dimension tolerance 8percent in C.M.1:6 in Superstructure including cost, conveyance, royalty and taxes of all materials, labour etc. complete including watering and curing for required period as per specification and direction of the Engineer-In-charge. Second floor
12mm thick cement plaster 1:6 finished smooth to outside surface of brick wall after racking out the joints scraping and cleaning the surface including watering and curing for specified period etc. complete including all cost and conveyance, royalty, taxes of all materials etc.complete as per specification and direction of the Engineer-In-charge. Second floor
16mm thick cement plaster 1:6 finished smooth to inside surface of brick wall after racking out the joints scraping and cleaning the surface including watering and curing for specified period etc. complete including all cost and conveyance, royalty, taxes of all materials etc.complete as per specification and direction of the Engineer-In-charge. Second floor
Providing, Fitting and Fixing M.S. Iron angle and shutters for doors and windows Including cost and conveyance of all materials to site, and all labour charges etc. complete as per specification and direction of the Engineer-In-charge. Second floor
Providing 2.5 cm thick grading concrete 1:2:2 on roof slab including punning using 6 mm size crusher broken granite chipps including curing dewatering, shoring, shuttering if necessary at the time of laying concrete with cost,conveyance, royalty,taxes of all materials required for the work, including supplying and working of pumps and all other materials required for the work, including all labour finishing the exposed surface, smooth, providfing grooves and beads where ever necessary etc. complete as per spoecification and direction of Engineer-in-charge. Second floor
Fixing vetrified tiles in floors,treads or steps and landing on 25 mm thick bed of c.m. 1:1 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing completeas per direction of EIC. Second floor
Fixing vetrified tile in dados skirting and risers of steps on 12mm thick CP 1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete as per direction of EIC. Second floor
Supplying ,Fitting and Fixing up window sliding type made up aluminum section 9778 as windows frame section No 4095 , 4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber bending including lucking arrangement including all fitting including cost of materials all taxes , labour , excluding cost of glass etc complete as per the direction of Engineer-in charge. Second floor
Finishing wall surfaces with Acrylic wall putty Water based of approved make and finished smooth and even surfaces to receive painting including cost of all materials taxes, labour etc. complete as per direction of the Engineer-in-charge. Second floor
Priming 1-coat with any approved primer including all labour etc complete as per direction of the Engineer-in-charge. Second floor
Wall painting 2-coats with plastic emulsion paint of approved shade on new work 1coats to give an even shade including cost and conveyance of all materials to site, and all labour charges etc. complete as per specification and direction of the Engineer-In-charge. Second floor
Finishing walls with weather coat two coats over a coat of cement primer to outer wall surface including cost and conveyance of all materials to site, and all labour charges complete as per direction of the Engineer-in-charge. Second floor
Painting two coats over wood and iron work with approved Enamel paint over a coat of primming, including cost and conveyance of all materials to site, and all labour charges etc. complete as per specification and direction of the Engineer-In-charge. Second floor
stage.html
html • 0.06 MB
techsummary_567635.pdf
finsummary_567635.pdf
aoc.pdf
finance_567635.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
Tendernotice_2.pdf
PDF • 1.32 MB
BOQ_567635.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid