Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.7 Cr+₹1.7 L (1.01%)Rejected-Finance | ₹1.7 Cr+₹1.7 L (1.01%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SATYABRAT BURAGOHAIN L1 | Bhaben Phukan L2 |
|---|---|---|---|---|---|
| 1.00 | (i) Luthuri Gaon Road Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(i) By Manual Means
(a) In area of non thorny jungle | 0.81 | Hect | 52,995.08 ₹42,926.01 Lowest | 53,525.03 ₹43,355.27 |
| 2.00 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
(c) Above 900 mm dia Hume pipe | 7.5 | Rm | 440.14 ₹3,301.05 Lowest | 444.54 ₹3,334.05 |
| 3.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
(b) Cement mortar | 8.1 | Cum | 272.44 ₹2,206.76 Lowest | 275.16 ₹2,228.8 |
| 4.00 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(i) Private Land | 2,706.09 | Cum | 258.21 ₹6,98,739.5 Lowest | 260.79 ₹7,05,721.21 |
| 5.00 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table 300.2 with lead upto
1000 m as per Technical Specification Clause 303.1.
(i) Private Land | 929.2 | Cum | 339.68 ₹3,15,630.66 Lowest | 343.08 ₹3,18,789.94 |
| 6.00 | Granular Sub-base with Well Graded Material (Table 400.1)
(Only for PMGSY work)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
(ii) For Grading II Material | 602.21 | Cum | 2,064.71 ₹12,43,389.01 Lowest | 2,085.36 ₹12,55,824.65 |
| 7.00 | Water Bound Macadam Sub-base/base
(Only for PMGSY work)
III WBM Grading 3
Using stone screening Type-B 11.2 mm for Gr.III
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
A By Manual Means | 301.11 | Cum | 3,701.03 ₹11,14,417.14 Lowest | 3,738.04 ₹11,25,561.22 |
| 8.00 | 6.7 Inter locking concrete Block pavement
(A) Interlocking pavement block
(i) Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.
a) Including Edge block/ Edge restraints | 3,787.5 | Sqm | 1,161.08 ₹43,97,590.5 Lowest | 1,172.69 ₹44,41,563.38 |
| 9.00 | Utility Shifting | 1.01 | Km | 33,900 ₹34,239 Lowest | 34,239 ₹34,581.39 |
| 10.00 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)600mm equilateral triangle | 8 | each | 3,933.19 ₹31,465.52 Lowest | 3,972.52 ₹31,780.16 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
14 Aug 2025, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
MMPPNA_RIDF_XXXI_25_26_305 Construction of (1) Luthuri Gaon Road (from Ch. 0.00 m to Ch. 1010.00 m L 1.01 km) (2) Udaipur to Sosan Ghat Path (from Ch. 100.00 m to Ch. 1100.00 m L 1.00 km) under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under R
2025_PWD_45926_142
CE/DEV/TB/60/2025-26/06 Dtd- 14.07.2025
Open Tender
Civil Works – Roads
Item Rate
270 days
Nazira
Please refer Tender Documents
5 documents required · 5 mandatory
₹3,310
₹3.3 L
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
17 Jul 2026
1 Aug 2025
14 Aug 2025
1 Aug 2025
14 Aug 2025
1 Aug 2025
1 Aug 2025 - 2 Aug 2025
4 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .