Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-Finance R O WARD NO 9 VPO AND TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | 1 | Accepted-Finance Accepted | |
| 2 | 2₹1.7 L+₹4,791.09 (2.84%)Rejected-Finance | 2 | Rejected-Finance Rejected |
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
24 Jul 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer HPPWD Division Tauni Devi.
C/o hume pipe culvert 900mm dia at RD 1/125)
2026_PWD_139294_6
3876-3925 dt.10.07.2026
Open Tender
Civil Works
Percentage
60 days
Tauni Devi
Please refer Tender documents.
13 documents required · 13 mandatory
₹350
₹3,500
1 Aug 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (one point five metre in width or 10 sqm (ten square metre on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,(one point five metre) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lfts and other incidentals.The rates are inclusive octrol, royality, Malkana,toll tax, GST or other taxes imposed by the Government. | 1 | Per Cubic metre | 290.15 | ₹289.86 |
| 2 | Providing and laying in cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:3:6 (one cement: three sand: six graded stone aggregated 20mm (twenty millimeters) nominal size, as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octrol, royality, Malkana,toll tax, GST or other taxes imposed by the Government. | - | Per Cubic metre | 4,950 | - |
| 3 | Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular materials in single row including fixing collar joints with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets clause 1108. 900mm(nine hundred millimeters) dia. as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octrol, royality, Malkana,toll tax, GST or other taxes imposed by the Government. | - | Per running metre | 3,905.29 | - |
| 4 | Backfilling Granular material behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8, and as per the direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidents.The rates are inclusive octrol, royality, Malkana,toll tax, GST or other taxes imposed by the Government. | 1 | Per Cubic metre | 700 | ₹699.3 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.32 MB
BOQ_206430.xls
BOQ • 0.28 MB
Job7.pdf
Tender Documents • 3.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .