Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L1 | Accepted-AOC Techno-commercially accepted by TC and approved by GM, KA | |
| 2 | L2₹33.8 L+₹2.3 L (7.17%)Rejected-Finance 1ST FLOOR FLAT NO A 104 ANANT EMEGINE SOCIETY PURANA BUS STAND KORBA DISTT KORBA C G 495678 | 495678 | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹37.2 L+₹5.6 L (17.8%)Rejected-Finance | L3 | Rejected-Finance Rejected being L3 bidder |
Tender Value
₹83.3 L
EMD Value
₹1.0 L
Closing Date
5 Dec 2022, 11:00 amClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG)
Removal/breaking of coal lumps, shale, etc. jammed in hopper of TRS, F/Breaker nd chutes of belt conveyor, Tripper during operation of Plant and Cleaning of conveyor structure, platform, bracing at CHP KOCP
2022_SECL_262668_1
SECL/GM/KSM/EnM/ eTender/22-23/47 dtd 18.11.2022
Open Tender
Miscellaneous Works
Item Rate
363 days
CHP KUSMUNDA PROJECT
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.0 L
31 Jan 2023
18 Nov 2022
6 Dec 2022
18 Nov 2022
5 Dec 2022
19 Nov 2022
19 Nov 2022 - 28 Nov 2022
Amount
Description of Work
Removal of shale, boulders & breaking of coal lumps, jammed slush coal etc. which obstract/hamper the operation of TRS Phase I, different belt conveyors during operation &cleaning of belt, jamming of chutes of belt conveyors & maintenance of plant in each shift, including handling of material, priming of pumps & other running maintenance etc, required for repairing & maintenance of plant & machineries in each shift of CHP, KOCP, (Analysed as per atleast 04 Un-skilled person in each shift X 3 shift = 12 Un-skilled person per day basis).
Cleaning of coal dust, slurry got stuck in conveyor structure, platform, bracing, etc. by wiping and moping on regular basis at CHP, KOCP. As analysed, work is to be carried out manually by deploying total 03 no. semi-skilled manshift per day on regular basis including cost of Tools and Tackles, contractor profit & applicable rate of CMPF.
Total impact of GST for the purpose of CTC
AARNA Constructions
Hems Corporation
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .