| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | ₹37.4 L | L1 | Accepted-AOC BEC Decided |
| 2 | L2₹37.4 LRejected-Finance METUAKUCHI BARPETA ASSAM | BARPETA | BARPETA | ASSAM | 781301 | ₹37.4 L | L2 | Rejected-Finance BEC |
| 3 | L3₹37.4 LRejected-Finance | ₹37.4 L | L3 | Rejected-Finance BEC |
| 4 | L3₹37.4 LRejected-Finance MAJARHATI BARPETA P O BARPETA P S BARPETA DISTRICT BARPETA PIN 781301 | BARPETA | ASSAM | 781301 | ₹37.4 L | L3 | Rejected-Finance BEC |
| Sl No | Description | Qty | Unit | Mrinal Jyoti das L3 | PRSANTA DAS L1 | DIPANKAR BAYAN L2 | M/s Shivam Consortium L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth Work in excavation by mechanical means/manual means over areas (exceeding 30cm in depth,1.50m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, as directed by Engineering in-charge 2.6.1, all kinds of soil. | 110.47 | Cum | 149.99 ₹16,569.40 | 100 ₹11,047 | 150.01 ₹16,571.60 | 149.99 ₹16,569.40 |
| 1.02 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks | 308.05 | Sqm | 600 ₹1.8 L | 800 ₹2.5 L | 600.01 ₹1.8 L | 600 ₹1.8 L |
| 1.03 | CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :'4.1.2 :- 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.2 | Cum | 8,000 ₹57,600 | 6,500 ₹46,800 | 8,000 ₹57,600 | 8,000 ₹57,600 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :5.1.2 : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 21.41 | Cum | 11,000 ₹2.4 L | 7,000 ₹1.5 L | 11,000 ₹2.4 L | 11,000 ₹2.4 L |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering , shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarsesand(zone-III) derived graded stone aggregate from natural sources : 3 | 11.15 | Cum | 10,000.03 ₹1.1 L | 7,000 ₹78,064 | 10,000.05 ₹1.1 L | 10,000.03 ₹1.1 L |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 73.73 | Sqm | 350 ₹25,805.50 | 350 ₹25,805.50 | 350 ₹25,805.50 | 350 ₹25,805.50 |
| 1.07 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 169.84 | Sqm | 350 ₹59,444 | 400 ₹67,936 | 350 ₹59,444 | 350 ₹59,444 |
| 1.08 | Columns, Pillars, Piers, Abutments, Posts and Struts | 43.2 | Sqm | 350 ₹15,120 | 400 ₹17,280 | 350 ₹15,120 | 350 ₹15,120 |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: 6.1.1Cement mortar 1:4 (1 cement : 4 coarse sand) | 40.27 | Cum | 6,499.9 ₹2.6 L | 7,000 ₹2.8 L | 6,500 ₹2.6 L | 6,499.9 ₹2.6 L |
| 1.10 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level 6.13.2 :Cement mortar 1:4 (1 cement : 4 coarse sand) | 302.93 | Sqm | 750 ₹2.3 L | 1,050 ₹3.2 L | 750 ₹2.3 L | 750 ₹2.3 L |
Tender Value
₹41.6 L
EMD Value
₹83,180
Closing Date
27 Nov 2025, 12:00 pmClosed
Chairman Barpeta Municipal Board Barpeta
BMB
Construction of Assam Type Chalighar market building near FAAMC, Metuakuchi under Untied basic grant award of the 15th Finance commission for the year 2024-25
2025_UDD_48433_1
5 of 2025-26
Open Tender
Civil Works - Building
180 days
BMB
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,500
Yes
₹83,180
Yes
12 Feb 2026
5 Nov 2025
27 Nov 2025
5 Nov 2025
27 Nov 2025
5 Nov 2025
Amount
Earth Work in excavation by mechanical means/manual means over areas (exceeding 30cm in depth,1.50m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, as directed by Engineering in-charge 2.6.1, all kinds of soil.
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks
CEMENT CONCRETE (CAST IN SITU) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :'4.1.2 :- 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :5.1.2 : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering , shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarsesand(zone-III) derived graded stone aggregate from natural sources : 3
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: 6.1.1Cement mortar 1:4 (1 cement : 4 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level 6.13.2 :Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :13.2.11:4 (1 cement: 4 fine sand)
Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.
52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length andjointed together at the end by end locks, mounted on specially designedpipe shaft with brackets, side guides and arrangements for inside andoutside locking with push and pull operation complete, including thecost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strengthconforming to IS: 4454 - part 1 and M.S. top cover of required thicknessfor rolling shutters. 10.6.1 : 80x1.25 mm M.S. laths with 1.25 mm thick top cover
Providing and fixing powder coated aluminium work (minimum thickness of powder coating 50 micron) consisting of tee/ angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P. brass/stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I. level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-incharge (level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately).
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 10.16.1Hot finished welded type tubes
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) , excluding the cost of purlins,rafters and trusses and including cutting to size and shape wherever required. 12.1.30.: 63 mm thick with zinc coating not less than 275 gm/ m²
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 10.25.2:- In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).12.26. :-16 mm thick Cement fiber board as per IS: 14862
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 13.43.1 : Water thinnable cement primer
Finishing walls with water proofing cement paint of required shade :13.44.1New work (Two or more coats applied @ 3.84 kg/10 sqm)
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 13.48.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources)
A Provisional sum (fixed Amount of 7 % ) for the items of Electrification of Rs.2,55,886.00 (not to be changed by the Bidders in BOQ)
DIPANKAR BAYAN (BID ID -287469)
M/s Shivam Consortium (BID ID -286745)
Mrinal Jyoti das (BID ID -287021)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
SBDASSAM.pdf
Tender Documents • 1.71 MB
BOQ_76988.xls
BOQ • 0.40 MB