| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 LRejected-AOC SOUTH ZONE TAMIL NADU | ₹4.2 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | C BALASUBRAMANIAN L2 | A SHANMUGAM L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Old damaged drains Plain cement concrete etc., complete complying with standard specification | 2.5 | Cum | 580 ₹1,450 | 572 ₹1,430 |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 68 | Cum | 225 ₹15,300 | 220 ₹14,960 |
| 3.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 | 6.3 | Cum | 5,962.25 ₹37,562.17 | 5,962.25 ₹37,562.17 |
| 4.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | |||||
| 4.01 | Drain | 183 | Sqm | 534 ₹97,722 | 534 ₹97,722 |
| 4.02 | Slab | 6 | Sqm | 720 ₹4,320 | 712 ₹4,272 |
| 5.00 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 | 31.6 | Cum | 6,721.5 ₹2.1 L | 6,721.5 ₹2.1 L |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 1.45 | Qtl | 9,542 ₹13,835.90 | 9,542 ₹13,835.90 |
| 7.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 1.5 | Cum | 9,744.5 ₹14,616.75 | 9,744.5 ₹14,616.75 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 34 | Sqm | 350 ₹11,900 | 309 ₹10,506 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Dec 2025, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Reconstruction of Storm water Drainage at Muthusamy Servai Street (Tower line Road) in ward no . 92
2025_MAWS_631719_34
E8 / South Zone / 2025
Open Tender
Civil Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
18 Jan 2026
13 Dec 2025
24 Dec 2025
14 Dec 2025
23 Dec 2025
14 Dec 2025
Amount
Dismantling the Old damaged drains Plain cement concrete etc., complete complying with standard specification
Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification
Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3
Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
Drain
Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Supply and Fixing of SFRC Manhole Cover with Frame as per Standard Quality as per the Direction of the Departmental officers Etc., Complete.
600mm Dia
Conveyance of Surplus earth from work site to City outer with average lead of 15 km
Add :- GST @ 18%
C BALASUBRAMANIAN (BID ID -1540237)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_756111.xls
BOQ • 0.32 MB
ITB.pdf
Additional Documents • 0.19 MB
tenderdocument.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid