| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 L+₹12,476.47 (4.32%)Rejected-Finance | ₹3.0 L+₹12,476.47 (4.32%) | L2 | Rejected-Finance L2 |
Tender Value
₹2.6 L
EMD Value
₹5,000
Closing Date
18 Dec 2019, 5:00 pmClosed
Executive EngineerProvincial Division No 1 Karnal
Executive Engineer Provincial Division No 1 Karnal
Construction of 5 feet span slab type culvert at RD 350 on Panjokhera app road Road ID 7323 in Karnal District
2019_HRY_111795_1
Construction of 5 span slab type culvert at RD 35
Open Tender
Civil Works
Works
30 days
Construction of 5 feet span slab type culvert at
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer Provl Divn No 1 B R Karnal
₹5,000
13 May 2020
9 Dec 2019
19 Dec 2019
9 Dec 2019
18 Dec 2019
9 Dec 2019
Amount
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres.(HSR 6.6)
Cement Concrete 1:6:12 with stone aggregate 40mm nominal size in foundation and plinth. (HSR 10.32)
Cement Concrete 1:4:8 with brick ballast 40mm nominal size in foundation and plinth.(HSR 10.36)
Cement Concrete 1:11/2 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level (HSR 10.60)
Cement concrete 1:1-1/2:3 with stone metal aggregate 20mm nominal size for RCC work complete (HSR 10.82+10.95 a)
First class brick work laid in cement sand mortar 1 : 5 in foundation and plinth (HSR 11.3)
First class brick laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
Cement pointing 1:2 deep variety on brick and tile work (HSR 15.60)
Fe-500 EQR/TMT steel bars for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding and placing in position complete in all respect. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS : 1732. Wastage, overlaps, coupling, welded joints space bars, chairs, stay, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement)(NS).
Making and filling expansion joints, with bituminous filler (bitumen 40 percent, asbestos 5 percent and sand 55 percent), 12 mm wide (HSR 24.34) Note :- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual scarifying and if material after scarifying is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note:- In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR. the unit and nomenclature given in HSR Shall be applicable. ii) In case of any difference in the unit of any Non- schedule items depicted in this DNIT and the Conventional unit of that N.S Item as per practice in this department the conventional unit as per practice shall be applicable.
Tirupati Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .