Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -47.10% | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹13.6 LAdmitted-Finance | -43.89% | ₹13.6 L | L2 | Admitted-Finance |
| 3 | L3₹13.6 LAdmitted-Finance | -43.80% | ₹13.6 L | L3 | Admitted-Finance |
| 4 | L4₹13.7 LAdmitted-Finance | -43.18% | ₹13.7 L | L4 | Admitted-Finance |
| 5 | L5₹14.8 LAdmitted-Finance | -38.56% | ₹14.8 L | L5 | Admitted-Finance |
Tender Value
₹24.1 L
EMD Value
₹48,300
Closing Date
31 Jul 2026, 4:00 pmClosed
ADGP Hqrs PHQ
Srinagar
Renovation
2026_DGPJK_316997_2
e-NIT/EE-PCD/PHQ/50/2026-27
Open Tender
Civil Works
Percentage
90 days
P S Assar Doda
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Exen PCD PHQ
₹48,300
3 Aug 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge All kinds of soil | 29.74 | Cum | 479.3 | ₹14,254.38 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 14.47 | Cum | 5,202.9 | ₹75,285.96 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.99 | Cum | 5,733.6 | ₹1,08,881.06 |
| - | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 57.55 | Cum | 7,571.55 | ₹4,35,742.7 |
| - | Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level | 57.55 | Cum | 1,455.65 | ₹83,772.66 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 26.27 | Cum | 9,821.85 | ₹2,58,020 |
| - | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) | 658.9 | Sqm | 266.2 | ₹1,75,399.18 |
| - | Supplying at site 'Y' shaped M S Angle iron post & strut of required size over boundary wall of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete with priming coat and enamelled paint to M S Angle including all cost and carriages of material involved as directed by EIC. | 543.29 | Kg | 127.3 | ₹69,160.82 |
| - | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with
horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used with G.I. barbed wire | 550 | Rm | 19.85 | ₹10,917.5 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 132 | Sqm | 286.35 | ₹37,798.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
BOQ_1036627.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].