Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -8.00% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 LAdmitted-Finance | -5.88% | ₹1.8 L | L2 | Admitted-Finance |
| 3 | L3₹1.9 LAdmitted-Finance | -4.00% | ₹1.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-e-Nit No. and date and S. No. of work not mentioned in front side of CDR. (Read Sr. No. 05 in e-NIT) |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
25 Mar 2026, 4:00 pmClosed
Executive Engineer REW, Jammu
Office of the Executive Engineer REW, Jammu
Construction of Lane and Drain near the House of Sh. Joginder Paul S/o Sh. Subash Sharma W. No. 02 R/o Chowki
2026_RDPR_306500_6
e-NIT No. 900REWJ of 2025-26 dated 20-03-2026
Open Tender
Civil Works
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Govt. Treasury
₹3,900
30 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | |||||
| 2P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | |||||
| 3P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | |||||
| 4 | Providing and laying 60mm thick factory made cement concreteinterlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. allcomplete as per direction of Engineer-in-charge. | - | Sqm | 816.15 | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 6Providing and laying 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | |||||
| 7 | Carriage of Sand and Aggregates average 20.00 km lead by M.T | - | Cum | 409.94 | - |
| 8Add Provission for painting writing on Citizen information Board etc. all complete job | |||||
stage.html
html • 0.03 MB
techsummary_995166.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_995166.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid