| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.0 L+₹600.01 (0.60%)Admitted-Fee/PreQual/Technical/Finance | +0.60% | ₹1.0 L+₹600.01 (0.60%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 L+₹1,000.01 (1.00%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹1.0 L+₹1,000.01 (1.00%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
14 Sept 2026, 11:00 amClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of water tank Mia Mohalla, W.No. 5 Pyt. Kanthan -A Block Arnas Dist. Reasi under Tribal Plan UT Capex Budget 2026-27.
2026_RDPR_323485_9
e-NIT No. 160 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,000
Yes
21 Sept 2026
5 Sept 2026
15 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge All kinds of soil | 6.07 | Cum | 479.3 | ₹2,909.35 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size | 0.5 | Cum | 4,826.5 | ₹2,413.25 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. ) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 4.13 | Cum | 7,788.4 | ₹32,166.09 |
| 4 | Reinforcement for RCC work including straightening , cutting, bending, placing in position and binding all complete | 123.77 | kg | 123.2 | ₹15,248.46 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 0.9 | Sqm | 286.35 | ₹257.72 |
| 6 | Centering and shuttering including strutting propping etc and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 29.7 | Sqm | 628.95 | ₹18,679.82 |
| 7 | Centering and shuttering including strutting propping etc and removal of form for suspended floors, roofs, landing, balconies and access platform | 3.35 | Sqm | 718.2 | ₹2,405.97 |
| 8 | 12 mm thick cement plaster of 1:4 mix ( 1 cement : 4 fine sand) | 30.61 | Sqm | 283.8 | ₹8,687.12 |
| 9 | White washing with lime to give an even shade on New Work (three or
more coats) | 17.23 | Sqm | 29.95 | ₹516.04 |
| 10 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15 mm dia | 8 | mtr | 206.5 | ₹1,652 |
stage.html
html • 0.02 MB
finance_1088996.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_1088996.xls
BOQ • 0.26 MB
Extension_corrigendum.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .