Tender Value
₹75.3 L
EMD Value
₹1.5 L
Closing Date
31 Aug 2026, 11:00 am7d left
DSCO Patiala
Zila Parishad Complex
Laying UGPL Community Projects distt Sangrur
2026_DOA_173777_1
DSWC/PAT/2026-27/06
Open Tender
Civil Works - Water Works
Percentage
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
Yes
₹1.5 L
Yes
18 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
FINANCIAL BID NO.: DSWC/PAT/2026-27/06
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Name of Work: Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of various Dia RCC Pipes, fixing of AVP, Risers, Construction of Haudies at various villages of District- Sangrur.
S. No. Detail of Work Amount in Rs. (As per details in attached sheets)
1 Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Naraingarh(C/o 2940/L)Ext, Tehsil Bhawanigarh and District- Sangrur. 58385
2 Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Phaguwal & Bhawanigarh(C/o 20964/L), Tehsil Bhawanigarh and District- Sangrur. 909599
3 Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Jhaneri (C/o 73643/R), Tehsil-Bhawanigarh and District- Sangrur. 174050
4 Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Salempur (C/o 2550/L), Tehsil Dhuri and District- Sangrur. 338902
5 Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Pump Stand and Gate valve at Village - Gaggarpur(C/o 84558/L), rajwaha-Sangrur,Tehsil sangrur and District- Sangrur. 1302775
6 Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - chatha sekhwan (Mogha no. 86680L 2nd Extention), Tehsil-sangrur and District- Sangrur. ( Section Malerkotla 2 ) 684822
7 Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Tolawal 10500/TR, Tehsil-Sunam and District- Sangrur. 4066071
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Naraingarh(C/o 2940/L)Ext, Tehsil Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 266.18 /Cum 93.78 Rupees ninty three and seventy eight paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc.dia 350 mm 195 /Mtrs 76 Rupee eighty four Only
Lowering of R.C.C. Class NP-3 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 0 /Mtrs 2777.02 Rupee Two Thousand seven hundred seventy seven and two paise only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 78 /Joints 160.2 Rupees one Hundred sixty and Thirty nine Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 1 /Cut hole 95 Rupees ninety five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 1 /Riser & Valve 568.69 Rupees Five hundred sixty six and ninety five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 /Air pipe 286.85 Rupees Two Hundred Eighty five and ninety eight Paise Only
Fixing of pump stand(900mm) 0 /pump stand 6591.29 Rupees six thousand five hundred ninety one and twenty nine paise
Fixing of gatevalve 1 /Valve 1734.69 Rupees one thousand seven hundred thirty two and ninety five paise only
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 7.17 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less)as per CSR 2020 Item No- 5.2 (13 b,c,d) 17.06 Per Ton 172.94 Rupees one hundred seventy two and ninety four paise Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Phaguwal & Bhawanigarh(C/o 20964/L), Tehsil Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3841.11 /Cum 93.78 Rupees ninty three and seventy eight paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc.dia 350 mm 2814 /Mtrs 76 Rupee eighty four Only
Lowering of R.C.C. Class NP-3 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 18 /Mtrs 2777.02 Rupee Two Thousand seven hundred seventy seven and two paise only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1126 /Joints 160.39 Rupees one Hundred sixty and Thirty nine Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 26 /Cut hole 95 Rupees ninety five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 13 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 /Riser & Valve 566.95 Rupees Five hundred sixty six and ninety five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 /Air pipe 285.98 Rupees Two Hundred Eighty five and ninety eight Paise Only
Fixing of pump stand(900mm) 3 /pump stand 6591.29 Rupees six thousand five hundred ninety one and twenty nine paise
Fixing of gatevalve 4 /Valve 1732.95 Rupees one thousand seven hundred thirty two and ninety five paise only
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 103.592 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less)as per CSR 2020 Item No- 5.2 (13 b,c,d) 246.024 Per Ton 172.94 Rupees one hundred seventy two and ninety four paise Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Jhaneri (C/o 73643/R), Tehsil-Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 813.05 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 505 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 202 /Joints 234.69 Rupees Two Hundred Thirty Four and Fifty Eight Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 2 /Cut hole 116 Rupees One hundered Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 2 /Riser & Valve 667.77 Rupees Seven Hundred Sixty and Fifty Eighty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 2 /Air pipe 286.35 Rupees Two Hundred Eighty Four and Ten Paise Only
Fixing of gatevalve(450mm) 0 /Air pipe 0 Rupees Two Thousand One Hundred Fifty Nine and Thirty Paise Only
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 30.946 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 60.49 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Salempur (C/o 2550/L), Tehsil Dhuri and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1459.2 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1280 /Mtrs 70 Rupees Seventy Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 640 /Joints 90.77 Rupees Ninety And Eighty nine Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 15 /Cut hole 62 Sixty two RupeesOnly
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 7 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (250 mm) 15 /Riser & Valve 431.49 Rupees Four Hundred Thirty Two And Thirty Eight Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 7 /Air pipe 284.25 Rupees Two Hundred Eighty Four and Twenty Two Paise Only
Detail Of 600mm Pump Stand
Description Of Work Quantities & Rate
Rate (Including 18% GST ) of 600mm dia S&S NP2 Pipe 6m Long Total (1) 9027
Excavation Length(m) Width(m) Height(m) Total (Cum)
Quantity Rate Total
Total (2) 93.78
Foundation of Pump Stand(1:8:16) Length(m) Width(m) Height(m) Total (Cum)
Material For Foundation Quantity Rate Total
Cement 1.08 300
Aggregates 21.18 36.37
Labour for Foundation of Pump Stand 0.6 1269.47
Material For Fixing Of Pump Stand Quantity Rate Total
Aggregates 13 36.37
Labour for Foundation of Pump Stand 2079
Sub Total (1+2+3+4)
Say Price For 1 No. Pump Stand Total B
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (250 mm) 5 each 920.9 -
Nimar for jointing the pipe (250mm) 42.12 Per kg 60 Rupees Sixty Only
Road Cut 0 Per Cut 15000 Fifteen thousand only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 88.78 per tonnes 160.3 Rupees One Hundred Sixty and Thirty paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Pump Stand and Gate valve at Village - Gaggarpur(C/o 84558/L), rajwaha-Sangrur,Tehsil sangrur and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5865.75 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only 550090.04
2 Lowering of 400 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3950 /Mtrs 71 Rupee Seventy One Only 280450
3 Jointing of class N.P.2 400 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1580 /Joints 206.16 Rupees Two Hundred six and sixteen Paise Only 325732.8
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only 0
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 33 /Cut hole 105 Rupees One hundred Five Only 3465
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 17 /Cut hole 41 Rupees Forty One Only 697
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 33 /Riser & Valve 811.29 Rupees eight hundred eleven and twenty Nine Paise Only 26772.57
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 17 /Air pipe 328.46 Rupees three Hundred twenty eight and Fourty six Paise Only 5583.82
Total (A) 1192791.23
Estimate of Charges for 900 mm Dia Pump Stand (as Siltation Chamber)
1 Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only 750.24
2 Material and Labour Charges For Foundation of Pump stands(1:8:16) 2190.01
3 Material and Labour Charges For Fixing of Pump stands 3512.28
Complete Work Total Cost for ONE Pump Stand 6453
Complete Work Total Cost for three No. Pump Stand (B) 19359
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
2 Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only 4000
3 Fixing of gate valve (400 mm) 3 each 2051.3 Rupees Two Thousand Fifty one and thirty Paise Only 6153.9
4 Nimar for jointing the pipe 218.04 Per kg 60 Rupees Sixty Only 13082.4
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 0.200 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only 67389.18
Sub Total 90625.48
Total (C) 90625
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C) 1302775
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - chatha sekhwan (Mogha no. 86680L 2nd Extention), Tehsil-sangrur and District- Sangrur. ( Section Malerkotla 2 )
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2969.81 /Cum 93.78 Ninty three rupees & seventyeight Paisa
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1685 /Mtrs 71 seventyone
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 298.39 two hundred ninetyeight &thirtynine
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 14 /Cut hole 127 one hundred twentyseven
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 5 /Cut hole 41 fourtyone
Fixing of Risers and alfa alfa valve with C.C 1:2:4 14 /Riser & Valve 889.53 eight hundred eightynine & fiftythree
Fixing of Air vent Pipes with C.C 1:2:4 5 /Air pipe 285.85 two hundred eightyfive & eightyfive
Fixing of Gate Valve C.C 1:2:4 3 each 2187.82 two thousand one hundred eightyseven & eightytwo
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 eightysix
B.B.C 1:8:16 0.6 cum 3856.48 three thousand eight hundred fiftysix & foutyeight
Plain Cement Concrete 1:2:4 0.14 cum 5066.89 five thousand sixtysix & eightysix
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 6189.26 six thousand one hundred eightynine & twentysix
12.5 mm thick cement plaster work 1:4 15.32 cum 201.525 two hundred one & five hundred twentyfive
RCC Slab 1:2:4 0.21 cum 8166.67 Eight thousand one hundred sixtysix & sixtyseven
Foot rest (Item No. 29.37) 6 No 100 one hundred
Total Cost for ONE Haudi
Total Cost for ( zero ) Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Four thousand
Sign Board (5' X 3') 0 each 4000 Four thousand
Road Cut 0 each 15000 Fifty thousand
Nimar for jointing the pipe 142.349 /Kg 60 sixty
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 260.142 209.86 two hundred nine & eightysix
Total Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Tolawal 10500/TR, Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 16176 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 8425 /Mtrs 74 Seventy four rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 3370 /Joints 334.44 Three Hundred Thirty-Four Rupees and fourty four Paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (600mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 6942.56 SIX thousand nine hundred fourty-two rupees and fifty six paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 67 /Cut hole 150 One hundred fifty rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 15 /Cut hole 41 Fourty One Rupess
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (600mm) 67 /Riser & Valve 965.8 Nine Hundred Sixty-five Rupees and eighty Paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 15 /Air pipe 291.01 Two Hundred Ninety one Rupees and one Paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3889.86 Three Thousand Eight Hundred Eighty-nine rupees and Eighty six paise
Plain Cement Concrete 1:2:4 0.14 cum 5157.16 Five Thousand One Hundred Fifty-seven rupees and Sixteen paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5057 Five Thousand Fifty-Four Rupees and Fifty-Nine Paise
12.5 mm thick cement plaster work 1:4 15.32 cum 202.61 Two Hundred Two rupees and Sixty-one Paise
RCC Slab 1:2:4 0.21 cum 8249.03 Eight Thousand Two Hundred Forty-Nine Rupees and Three paise
Foot rest (Item No. 29.37) 6 No 100 One hundred rupees
Total Cost for ONE Haudi
Total Cost for 1 Haudis 33263
Estimate of Charges for Pumpstand (1200 mm)
Rate of pumpstand 14691
Total Cost for 1 pumpstand 21395
Total Cost for 10 pumpstand 213950
Road Cut 0 each 15000 Fifteen thousand rupees only 0
Providing and Fixing of jaal 1 each 4000 Four Thousand rupees only
Sign Board (5' X 3') 0 each 4000 Four Thousand rupees only
Fixing of gate valve (600 mm) 15 each 2765.97 Two Thousand seven Hundred sixty-five and ninety seven Paise
Nimar for jointing the pipe 1149.17 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 1702 per tonnes 209.86 two hundred nine rupees eighty six paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
sbid06.pdf
Tender Documents • 0.47 MB
FinBid20262706.xls
Additional Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].