| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | MATHURA | ₹14.2 Cr Quoted ₹14.7 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 142164405.53 Only |
| 2 | L2₹14.8 Cr+₹6.1 L (0.41%)Rejected-Finance S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | ₹14.8 Cr+₹6.1 L (0.41%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | Rejected-Technical 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | - | - | Rejected-Technical Technical Bid Non responsive |
| 4 | Rejected-Technical 323 SHAMBHU NAGAR SHIKOHABAD DISTRICT FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | - | - | Rejected-Technical Technical Bid Non responsive |
| 5 | Rejected-Technical UTTAR PRADESH UTTAR PRADESH | - | - | Rejected-Technical Technical Bid Non responsive |
| Sl No | Description | Qty | Unit | M/s R L A Constructions L1 | SRS EXPRESS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Road (Including Diversion for Box Culvert Also)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6). | 6,700 | Cum | 60.3 ₹4,04,010 Lowest | 60.3 ₹4,04,010 Lowest |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 6,700 | Cum | 70 ₹4,69,000 Lowest | 70 ₹4,69,000 Lowest |
| 3.00 | Construction of embankment with approved material obtained from borrow pits all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Carted Earth) | 31,498 | Cum. | 150 ₹47,24,700 Lowest | 150 ₹47,24,700 Lowest |
| 4.00 | Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b). | 4,325 | Cum. | 3,209.2 ₹1,38,79,790 Lowest | 3,209.2 ₹1,38,79,790 Lowest |
| 5.00 | Consolidation of machine crushed stone ballast of approved quarry of 63~45mm size to water bound macadam of G-2 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work as per MORT&H specifications no 404 (4.11A) | 220 | Cum. | 3,809.9 ₹8,38,178 Lowest | 3,809.9 ₹8,38,178 Lowest |
| 6.00 | Consolidation of machine crushed stone ballast of approved quarry of 53~22.4 mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work. as per MORT&H specifications no 404 (4.9). | 310 | Cum. | 3,883.2 ₹12,03,792 Lowest | 3,883.2 ₹12,03,792 Lowest |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406. | 7,450 | Cum. | 3,200 ₹2,38,40,000 Lowest | 3,280 ₹2,44,36,000 |
| 8.00 | Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.60 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work. | 48,700 | Sqm | 35.9 ₹17,48,330 Lowest | 35.9 ₹17,48,330 Lowest |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading-II, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 3,420 | Cum. | 10,000 ₹3,42,00,000 Lowest | 10,000 ₹3,42,00,000 Lowest |
| 10.00 | Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC) | 48,700 | Sqm. | 10.9 ₹5,30,830 Lowest | 10.9 ₹5,30,830 Lowest |
Tender Value
₹14.8 Cr
EMD Value
₹29.6 L
Closing Date
3 Feb 2026, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and Strengthening work on 3.75 M to 5.50 M of Chhata-Taroli road ODR in District Mathura
2026_CEAGR_1109877_1
38114M-AC/2025-26 dated 20-01-2026
Open Tender
Civil Works
Item Wise
365 days
Mathura
Widening and Strengthening
2 documents required · 2 mandatory
₹2,360
₹29.6 L
Agra
25 Mar 2026
27 Jan 2026
3 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
31 Jan 2026
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
SBDChhataTarauliRoad.pdf
Tender Documents • 1.29 MB
SBDAddendumChhataTarauliRoad.pdf
Tender Documents • 2.64 MB
BOQ_2049700.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .