GEMC-511687769472256
Awarded to WAVES INTERIORS
₹17.1 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Removing of existing doors | removing doors | 9403 | 6 Numbers | 1,000 | 6,000 |
| Removing of gyp partition | Removing gyp partition | 9403 | 525 SQFT | 20 | 10,500 |
| Re-fixing of doors | Refixing doors | 9403 | 6 Numbers | 2,000 | 12,000 |
| Cutting,removing of gypsum ceiling proper line, level, alter, reuse the frame work as per new design. | removal gyp ceiling | 9403 | 1,500 SQFT | 25 | 37,500 |
| Demolish of existing wall | demolish wall | 9954 | 150 SQFT | 65 | 9,750 |
| Removing of existing full height wooden partition without damage panels, Glass, frame etc | removing wooden partition | 9403 | 330 SQFT | 45 | 14,850 |
| Removing of existing wooden workstation without damage panels, Glass, frame etc | removing wooden workstation | 9403 | 1 Numbers | 25,000 | 25,000 |
| Removing existing carpet | removing carpet | 5703 | 700 SQFT | 25 | 17,500 |
| Relaying of existing carpet | relaying carpet | 5703 | 700 SQFT | 55 | 38,500 |
| Demolish and removing of existing DBs packing the area with proper plum and level | removing existing DB | 9954 | 1 Numbers | 12,000 | 12,000 |
| Removing and handover the cascade Aircondition and handover the client with proper packing etc | removing air-condition | 9987 | 4 Numbers | 3,500 | 14,000 |
| Removing of existing electrical fittings and Data points without damage the switch and sockets, wiring from DB with all related works etc | removing electrical fittings | 9954 | 1 Numbers | 10,000 | 10,000 |
| Removing and handover the cupboards with proper packing etc | removing cupboards | 9403 | 500 SQFT | 75 | 37,500 |
| Providing and constructing 4 and half Brick Work | brick work | 9954 | 1,000 SQFT | 190 | 190,000 |
| Providing and Laying Thick plaster to ceiling, all types of RCC work, brick work surfaces at all levels in line | plastering | 9954 | 2,100 SQFT | 80 | 168,000 |
| Dismantling of Existing tiles flooring, existing Stone Panelling and Plaster Bands disposal of materials as directed | dismandling tiles | 9954 | 120 SQFT | 65 | 7,800 |
| Providing and Fixing Window covering work | window covering work | 4418 | 40 SQFT | 250 | 10,000 |
| Supply of zebra curtain for Main Curtains with approved design | main curtain | 6303 | 175 SQFT | 300 | 52,500 |
| Fixing of 5amps switch with socket 3 nos each cabin and running counter from DB box | 5amps switch socket | 9954 | 30 Numbers | 1,000 | 30,000 |
| Fixing of Data and voice with socket each one for all the cabin and running counter from server room | data socket | 9954 | 30 Numbers | 1,000 | 30,000 |
| Providing and Fixing of Electrical fittings with 2 years company warranty | Electrical fittings | 9954 | 20 Numbers | 3,500 | 70,000 |
| Glass doors | Glass door | 7007 | 2 Numbers | 45,000 | 90,000 |
| Supply and fixing of Bio metric access along with one year software support with all related works etc | bio metric accessioreies | 8543 | 1 Numbers | 15,000 | 15,000 |
| Providing and Fixing of 8mm thick toughened glass partition fixing on teakwood frame work supported | Glass partition | 9403 | 140 SQFT | 500 | 70,000 |
| Providing and fixing in position Gypsum Board False Ceiling inclusive of Painting suspended on the G.I. frame work | false ceiling gyp board | 6809 | 1,300 SQFT | 120 | 156,000 |
| Levelling of wall surface with putty and the finished surface should be smooth so as to avoid unevenness and ready to take on paint | putty work | 3209 | 3,500 SQFT | 20 | 70,000 |
| Providing and Applying three coats of Luster EMULSION Paint on walls in approved shade | Painting work | 3209 | 7,500 SQFT | 25 | 187,500 |
| Window alternation work Cutting of existing grill work making one door to access the other side with proper locking arrangement etc | window grill alternation | 7308 | 1 Numbers | 12,000 | 12,000 |
| Providing and Fixing of Flush door 40mm thick flush door finish with Laminate double colour corner lipping with deco finish | flush door | 4418 | 2 Numbers | 25,000 | 50,000 |
| Providing and Laying of 8mm machine tufted carpet with 6mm rubber matt underlay | carpet | 5701 | 1,050 SQFT | 240 | 252,000 |