Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹36,580
Closing Date
29 Jun 2026, 5:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Director ARAI
S.No.102,Vetal HIll,Off Paud Road,Kothrud,Pune.411038
Civil,partition and allied work for refurbishment of ITM department,A building ARAI Kothrud,Pune
2026_DHI_841681_1
ID-251-PR-20015765
Limited.
Civil Works - Others
120 days
S.No.102, Vetal HIll, Off Paud Road, Kothrud, Pune.411
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹36,580
Yes
S.No.102,Vetal HIll,Off Paud Road,Kothrud,Pune.411
15 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
16 Jun 2026
16 Jun 2026 - 23 Jun 2026
23 Jun 2026
Dismantling of Aluminium partition including Aluminium partly glazed door with fitting & fixtures: Dismantling and removing of all types of aluminium partition/ Glass Window with frames (fixed window or sliding winsows or comnination) and partly glazed glass door of any dimension height at any floor; MS grills of all Sizes, with its all fixtures and fastenings completely carefully and without breaking from wall or partition and shifting and stacking the same material within the 300 m radial distance from building with all leads and lifts, cleaning etc. complete as directed by the Engineer-In-Charge. Scope includes all tools & tackles, scaffolding, safety PPE`s required for work. Care to be taken as this removed material is to be reused.
Dismantling of HOD table: Labour charges of dismantling the modular furniture- HOD table with side credenza, back combo storage and allied accessories of modular table unit. Contractor must deploy the sklilled manpower having relevant experince for such type of work (autorized vender) Dimesnion of unit- Main Table (MT) Round edge - Dimension - 2100mm (L) X 900mm (D) X 750mm (H) Side Table (ST) Dimension - 1500mm (L) X 600mm (D) X 750mm (H) Back Combo Storage (BCS) - 1200mm (L) X mim 450mm (D) X 750mm (H) Scope includes tools & tackles, scaffolding, safety PPE`s, wrapping of parts to avoid damage etc complete.
Shifting & reinstallation of HOD table: Labour charges for shifting of dismantled modular HOD table to desired location within vicinity area having lead up to 100 meters and reinstalling as per instrcution of EIC at given location as per manufacturer`s guideline. Scope includes all leads & lift, transportation, all required tools & tackels, safety PPE`s, wrapping of parts to avoid damage.
Dismantling of work stations: Labour charges of dismantling the modular furniture L type work station. Contractor must deploy the sklilled manpower having relevant experince for such type of work (autorized vender) Dimension of work station: 1500mm (L)X1500mm(L)X1500mm(L)X 600mm(D) X750mm (H). Scope includes tools & tackles, scaffolding, safety PPE`s etc complete.
Shifting & reinstallation of work stations: Labour charges for shifting of dismantled modular L type work station to desired location within vicinity area having lead up to 100 meters and reinstalling as per instrcution of EIC at given location as per manufacturer`s guideline. Scope includes all leads & lift, transportation, all required tools & tackels, safety PPE`s, wrapping of parts to avoid damage.
Shifting & reinstallation of Linear table: Labour charges for shifting of dismantled modular Linear table to desired location within vicinity area having lead up to 100 meters and reinstalling as per instrcution of EIC at given location as per manufacturer`s guideline. Scope includes all leads & lift, transportation, all required tools & tackels, safety PPE`s, wrapping of parts to avoid damage.
Dismantling of Conference room table & refixing : Labour charges of dismantling the modular furniture conference room table. Contractor must deploy the sklilled manpower having relevant experince for such type of work (autorized vender) Dimension of work station: 2000mm (L)X 1200mm(D) X 750mm (H). Scope includes shifting of dismantled modular conference room table to desired location within vicinity area having lead up to 100 meters and reinstalling as per instrcution of EIC at given location as per manufacturer`s guideline; including tools & tackles, scaffolding, safety PPE`s, wrapping of parts to avoid damage etc complete.
Shifting and re-fixing of storage units includes the careful dismantling of existing units, including shutters, drawers, and internal shelves, followed by the safe removal and storage of all hardware like hinges, handles, and locks for reuse or shifting directly without dismantling (includes wrapping of parts to avoid damage). It covers (option1 of dismantling) surface preparation to remove old adhesives or wall plugs, the internal shifting of all components to the new location, and the subsequent re-assembly and secure anchoring of units to the wall or floor using new fasteners, ensuring they are perfectly level. The item also accounts for the re-installation and alignment of all hardware for smooth operation, minor touch-ups to laminates or veneers, and the final disposal of any unserviceable debris. DIMENSIONS - min.900mm (W) X min 450mm (D) X 1200mm (H)
Shifting of Sofa set shifting of a sofa set involves the safe handling and internal relocation of the entire unit, starting with the protective wrapping of all upholstered surfaces and wooden/metallic frames using bubble wrap or stretch film to prevent scratches, dust, or stains. It includes the careful dismantling of modular sections or detachable legs if required for transit, the manual lifting and transport of all pieces to the designated new location within the premises, and the subsequent re-assembly and positioning of the set as per the layout plan. The item also covers a final cleaning of the sofa surfaces to remove any handling marks and the removal of all packing debris from the site.
Shifting of Teepoy shifting of a teepoy involves the safe handling and relocation of the unit, starting with the careful removal and separate protective packing of glass tops or stone inserts using foam or bubble wrap to prevent breakage. It includes the wrapping of the main frame—whether wooden, metal, or glass—with stretch film to protect against scratches or chipping during transit, the manual shifting to the new designated spot, and the precise re-assembly or placement of all components. The item also accounts for a final cleaning to remove fingerprints or dust and the complete disposal of all packing materials
Removing of existing false ceiling removal of tiled false ceilings involves the systematic dismantling of ceiling tiles and the supporting grid system from a height of approximately 3 meters, ensuring all components are handled carefully to avoid breakage or structural deformation. It includes the organized stacking and internal shifting of the removed materials to a secure location within the ARAI premises lead up to 100 meters. The scope is all-inclusive, covering the provision of sturdy scaffolding for safe access, the use of all necessary hand tools and specialized tackles, and the mandatory use of safety PPEs by all personnel. The item also accounts for the cleaning of the floor area post-removal and the coordination with the Engineer-in-Charge (EIC) to ensure site readiness
Refixing of full height Aluminium partition (partly glazed & partly partical board) including fixing of door along with accessories- re-fixing of an aluminium partition from available material (stacked near to work location). Scope includes secure installation of the framework with proper floor and ceiling anchoring to ensure perfect alignment. The scope includes the re-installation of doors along with all accessories like hinges, floor springs, and locks, the replacement of rubber gaskets or sealants where necessary, and the final adjustment of all moving parts for smooth operation. This comprehensive rate accounts for all labor, scaffolding, safety PPEs, all consumables such as rubber gasket , cutting & fixing as per site requirement, strengthning of supports till RCC slab and tools required for both the removal and re-installation phases.
Refixing of half height Aluminium partition (partly glazed & partly partical board) including fixing of door along with accessories- re-fixing of an aluminium partition from available material (stacked near to work location). Scope includes secure installation of the framework with proper floor and ceiling anchoring to ensure perfect alignment. The scope includes the re-installation of doors along with all accessories like hinges, floor springs, and locks, the replacement of rubber gaskets or sealants where necessary, and the final adjustment of all moving parts for smooth operation. This comprehensive rate accounts for all labor, scaffolding, safety PPEs, all consumables such as rubber gasket , cutting & fixing as per site requirement, strengthning of supports till RCC slab and tools required for both the removal and re-installation phases.
Replacement of Vitrified tiles: replacement of vitrified tiles involves the careful chipping and removal of existing damaged or old tiles along with the underlying cement mortar bed to a required depth, ensuring no damage to the surrounding floor area or concealed utilities. Scope includes Providing and laying Vitrified Floor tiles, for flooring and skirting, in different sizes (thickness to be specified by the manufacturer) with water absorption's less than 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on cement-sand mortar ratio or high-quality tile adhesive It includes the preparation of the base surface by cleaning and wetting, followed by the laying of new vitrified tiles of approved make, shade, and size using a cement-sand mortar ratio or high-quality tile adhesive to achieve a perfectly level finish. The scope covers the precise cutting of tiles for edges and corners, grouting of joints with matching color-pigmented epoxy or cementitious grout, and a final cleaning and acid wash to remove all stains and debris. This comprehensive rate includes all necessary materials, labor, tools, and the disposal of dismantled waste to the designated scrapyard. Size of Tile 600 mm X 600 mm. Basic Rate of Tile 65/- Sqft
P & F Gypsum board false ceiling: Providing and fixing Gypsum Board False Ceiling at all height (3 m from FFL) including providing and fixing of frame work made of special Galvanized section Gyprock/Armstrong make for supporting frame structure as per IS :277 and consisting of angle cleats of size 25mm wide X 1.6mm thick with flanges of 27mm and 37mm, at 1200mm centre to center, one flange fixed to ceiling with dash fastener 12.5mm dia x 50mm long with 6mm dia bolts, other flange cleat fixed to the angle hangers of 25x10x0.50mm of required length with nuts and bolts of required size and other end of angle hanger fixed with intermediate GI channels 45x15x0.9mm running at spacing of 1200 mm center to center, to which the ceiling section 0.5mm thick bottom wedge of 80mm with tepered flanges of 26mm each having lips of 10.5 mm, at 450mm center to center , shall be fixed in a direction perpendicular to GI intermediate channel with connecting clip made out of 2.64 mm dia x 230 mm long GI wire at every junction, including fixing perimeter channels 0.5mm thick 27 mm high having flanges of 20mm and 30mm long, the perimeter of ceiling fixed to wall/partition with the help of PVC rawl plugs at 450mm centre, with 25mm long dry wall screws of size 3.5 X 25mm at 230mm c/c, including jointing and finishing to flush finish to tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound covering upto 150mm on both side of joint and two coats of primer suitable for board, all as per manufacturers specification and also including the cost of making opening for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed all complete as per drawing, specification and direction of the Engineer in Charge but excluding cost of painting. Includes wastage & other consumables Excluding scaffolding
Gypsum false ceiling patta:"P/F Gypsum patta: As per Above item 15 specification vertical patta up to 300mm in Gypsum Board as per detailed drawing. Includes wastage & other consumables Excluding scaffolding"
GRID FALSE CEILING USING 600mm X 600mm tiles: Providing and fixing Armstrong or equivalent tiled False Ceiling (RH 99) classic lite-approved materials of size 600x 600 mm in true horizontal level, suspended on inter locking metal grid of hot dipped galvanized steel sections consisting of main "T" runner with suitably spaced joints to get required length and of size 24x38 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200 mm center to center and cross "T" of size 24x25 mm made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main "T" at 600 mm center to center to form a grid of 1200x600 mm and secondary cross "T" of length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying metal perforated false ceiling tiles of approved texture and thickness in the grid including, required cutting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main "T" runners to be suspended from ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI adjustable rods with galvanised butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm center to center along main T, bottom exposed width of 24 mm of all T-sections shall be powder coated , all complete for all heights as per specifications, drawings etc completed as per direction of Engineer - in- charge.( Rate should be including of all like tools,tackels,consumables, scaffolding etc complete.) Work execution as per CPWD Guideline. Approximate height of work up to 2.5 meters.
Dry wall: Gypsum Board Dry Wall above glass Partition- Providing and fixing partition at ceiling height above 2.4 mtr to 4m consisting of G.I. frame and required board, including providing and fixing of frame work made of special section power pressed/ roll form G.I. sheet with zinc coating of 120 gms/Sqm(both side inclusive), consisting of floor and ceiling channel 50mm wide having equal flanges of 32 mm and 0.50 mm thick, fixed to the floor and ceiling at the spacing of 610 mm centre to centre with dash fastener of 12.5 mm Dia meter 50 mm length or suitable anchor fastener or metal screws with nylon plugs and the studs 48 mm wide having one flange of 34 mm and other flange 36 mm and 0.50 mm thick fixed vertically within flanges of floor and ceiling channel and placed at a spacing of 610 mm centre to centre by 6 mm Dia bolts and nuts, including fixing of studs along both ends of partition fixed flush to wall with suitable anchor fastener or metal screws with nylon plugs at spacing of 450 mm centre to centre, and fixing of boards to both side of frame work and bottom of wall by 25 mm long dry wall screws on studs, floor and ceiling channels at the spacing of 300 mm centre to centre. The boards are to be fixed to the frame work with joints staggered to avoid through cracks, M.S. fixing channel of 99 mm width (0.9 mm thick having two flanges of 9.5mm each) to be provided at the horizontal joints of two boards, fixed to the studs using metal to metal flat head screws, including jointing and finishing to a flush finish with recommended jointing compound, jointing tape, angle beads at corners (25 mm x 25 mm x 0.5 mm), joint finisher and as per manufacture's specification and direction of engineer in charge all complete.Including H frame or Cup lock scaffolding or Aluminium Ladder only.
Glass partition: Supply and Fixing of Double Glazed Glass partition of 12mm Toughened Glass on both sides using DORMA Alexa System-100-DG Frames (U channel ) to a height of maximum 4m or as per drawing. The Fixed glass to be fixed using DORMA Alexa BP100-DG Profiles at Top & Bottom & Alexa SP100-DG at sides. The profile size of 100x25MM to be fixed on to the floor/wall/ ceiling as per the architect design. DORMA Alexa H Junction profile to be used at all Glass to Glass vertical joints, 90 Deg L Junction Profiles and T Junction profiles necessary as per design. In case of Glass overall panel Alexa OHP100-DG Over panel Profile to be used. In case of Open glass edges EP100-DG End Profile to be used. The Alexa profiles shall be suitable for Glass thickness of 10/12/13.52mm.The Profile shall be matt natural anodized, the Profile Manufacturer to supply all the necessary clips, seals and fixing accessories for the system. All Profiles to be with 2 mm Gauge thickness Excluding 20 Micron of Anodizing. System should achive DB Difference of 30-35 DB. Approved Manufacturer: Profiles/Frames: DORMA, Glass : Saint Gobain/Asahi/Modiguard Scope includes all lead &lift, wastage, scaffolding, all safety PPE`s, tools & tackels, consumable etc complete.
Glass Door with accessories: Providing & Fixing of Dormakaba make Alterra Lite45 Rebate door for glass, including Rebate Door Frame with necessary seals in EV1 Grey Finish and hardware in EV1 Grey/SS Finish as Corner Hinge, TS 71 door closer with slide channel & Hold open unit, D Type Pull Handle 300mm , bottom center lock with both side key cylinder 60mm and strick plate, door stopper, Etc. Door Dimension including door frame-1000 mm (W) x2400mm (H) including 12 mm thick clear toughened glass. The scope includes the installation of heavy-duty floor springs, top and bottom patch fittings, stainless steel (SS) long-handle bars, and secure lock sets, ensuring perfect vertical alignment and smooth closing movement. It accounts for the precise drilling and cut-outs required for hardware, the application of clear silicone at fixed edges, and the testing of the door's swing and auto-close mechanism. This comprehensive rate includes all premium materials, specialized labor, and safety PPEs, utilizing top-tier hardware and glass from brands like Dorma (Dormakaba), Ozone, or Hafele.
P/A Flat oil paint: Providing and applying Flat oil paint on plastered wall & Ceiling as per approved make and shed including base preparation by scraping & cleaning existing paint, priming crack filling, one coat of repaint putty, one coat of primer, two or more coat of Paint etc. as per standard specifications of CPWD, etc. complete. Scope also includes necessary scaffolding. Heigh of work up to 3 meters. make Asian, Nerolac, Dulux, Berger make
P/A Plastic emulsion paint: Providing & applying Painting with low VOC Plastic emulsion paint of approved brand (Asian, Nerolac, Dulux, Berger make) and manufacture specification to give an even shade : Two or more coats on new work, old work, including all necessary surface preparation such as scrubbing of old paint, thoroughly cleaning of oil, grease, dirt and other foreign matter and sand papering, applying one coat of putty, one coat of primer and two or more coats of paint along with necessary masking etc complete at any height. including H Frame/cup lock scaffolding at all levels etc. complete. Height of work up to 3.2 meters. Painting on Gypsum false ceiling.
Removing & refixing roller blinds: Removing and re-fixing of roller blinds involves the careful dismantling of existing blinds from window frames or ceiling tracks, ensuring no creases, tears, or damage to the fabric and operating mechanisms. It includes the systematic labeling and internal shifting of the units, followed by the re-installation of mounting brackets and the secure fixing of the rollers in the new designated position with perfect horizontal alignment. The scope covers the testing of all operating cords, chains, or motorized systems for smooth functionality, the replacement of minor fixing hardware like wall plugs and screws, and the final cleaning of the blinds to remove handling marks. This comprehensive rate includes all labor, specialized tools, and ladders or scaffolding required for heights, utilizing high-quality components and accessories from top brands like Hunter Douglas, Mac Blinds, or Vista.
Plaster repair work: The structural repair of an RCC chajja using two-component materials involves a comprehensive process that begins with chipping away loose or spalled concrete and cleaning the exposed substrate to ensure a sound surface. The exposed reinforcement must be thoroughly de-rusted using wire brushes or mechanical grinders, followed by the application of a two-component anti-corrosive epoxy primer, such as Nitozinc, rustiside to prevent future oxidation. A two-component epoxy bonding agent is then applied to the concrete surface to facilitate a "wet-on-wet" bond between the old structure and the new repair material. The core repair is executed using a high-strength, two-component epoxy or polymer-modified mortar applied in layers to restore the chajja’s original profile and slope, ensuring it includes a functional drip course for water drainage. Finally, the surface is finished with a waterproofed plaster and protected, often requiring the erection of secure scaffolding for safe execution at height. Approved material Polymer-Modified Mortars (PMM)-Dr. Fixit Pidicrete URP; SikaTop-122 HS, Thermax
Exterior paint: exterior paint includes comprehensive surface preparation by high-pressure water jetting or manual scraping to remove moss, algae, and loose paint, followed by filling cracks with specialized external-grade wall putty or weather-resistant fillers. The scope covers the application of one coat of high-performance exterior primer and two or more coats of premium weather-proof emulsion that offers anti-algal and UV-resistant properties to withstand harsh environmental conditions. This item is all-inclusive of sturdy double-stage scaffolding for high-level work, safety harnesses for workers, protection of adjacent windows/surfaces, and final site cleanup, utilizing top-tier products from Asian Paints (Apex Ultima), Berger (WeatherCoat Long Life), or Kansai Nerolac (Excel),
Decorative film over glass: Application of decorative film( 3M, Garware or equivalent higher approved brand) over glass partition, involves the meticulous cleaning and degreasing of the glass surface to ensure a completely dust-free base for adhesion. It includes the precise measurement and custom cutting of high-quality decorative film—such as frosted, etched, or patterned designs—followed by its expert application using professional wetting solutions and squeegeeing techniques to eliminate air bubbles, wrinkles, or peeling. The scope covers the careful trimming of edges for a seamless fit against the frames, the use of all necessary tools like precision cutters and sprayers, and the provision of any required ladders or scaffolding for high-level panels. This comprehensive rate accounts for the cost of the film, specialized labor, and final site cleanup to remove any film trimmings or residues, provided as an all-inclusive rate per unit of measurement. Scope includes all wastage. Measurement apllication area lenght x height
Texture paint : Texture paint(Asian Paints (Royale Play), Berger (Nilaya), or Kansai Nerolac). application includes thorough surface preparation by scraping, cleaning, and filling any cracks or unevenness with putty to ensure a smooth, stable base. It covers the application of one coat of suitable primer followed by the base coat and the expert application of the texture material using specialized rollers, spatulas, or sprayers to achieve the approved design pattern and finish. The scope includes a final protective top coat or glaze for enhanced durability and aesthetics, as well as the complete protection of all surrounding floors, windows, and furniture with masking tape and plastic sheets. This comprehensive rate accounts for all premium materials, specialized labor, tools, scaffolding for heights, wastages and final site cleanup, provided per square meter (Sqm). Mode of measurement- Length /width x height
Skilled labour: Supply of skilled labour to carry out Skilled work apart from above mentioned specific work, including necessary tools & tackles and consumables
Unskilled labour: Supply of skilled labour to carry out Skilled work apart from above mentioned specific work, including necessary tools & tackles and consumables
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TechnicalBidDocument.pdf
Tender Documents • 0.57 MB
PriceBid.xls
Tender Documents • 0.06 MB
ITMEXISTINGLAYOUTPLAN.pdf
Tender Documents • 0.40 MB
PROPOSEDITMFURNITUREFINAlLAYOUT.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid