Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC The L1 bidder is techno-commercially eligible and the rate quoted is reasonable and justified, which has been accepted by the Competent Authority, NK Area. | |
| 2 | L2₹1.4 L+₹9,016 (7.10%)Rejected-Finance AT PO RAY DISTT RANCHI JHARKHAND 829209 | RANCHI | JHARKHAND | 829209 | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.4 L+₹9,409 (7.41%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.4 L+₹11,515 (9.07%)Rejected-Finance 15 3 625017 | MADURAI | TAMIL NADU | 625017 | L4 | Rejected-Finance L4 |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
24 Nov 2022, 5:00 pmClosed
SO EnM NK
GM Office, NK Area
Repairing and maintenance of different unit assembly and painting of Truck No. JH09AA6100, like gear, self-start, leaf, wheel greasing, filter and painting work under Churi Colliery, NK Area
2022_CCL_262057_1
GM (NK)/EnM/e-NIT/2022-23/ 154
Open Tender
Miscellaneous Works
Item Rate
15 days
Churi Colliery, NK Area
As per NIT
2 documents required · 2 mandatory
₹1,900
5 Apr 2023
12 Nov 2022
26 Nov 2022
14 Nov 2022
24 Nov 2022
14 Nov 2022
14 Nov 2022 - 21 Nov 2022
Amount
Gear Work
Cost of clutch plate
Cost of Clutch buster kit
Cost of release bearing, greasing
Cost of pressure plate full overhauling
Cost of cylencer opening and fitting clamp 02 Set
Gear down and fitting charge.
Self start unit work
Cost of Carbon bruss holder
Cost of Solienoid switch
Cost of Self pinion
Cost of self bearing (6202)
Labour cost and fixing charge
Rear leaf work
Cost of U Bolt
Cost centre bolt
Cost of cutter pin
Cost of side washer
Cost of clamp bolt
Cost of leaf clamp
Cost of rear leaf 2 Set opening and fitting
Front leaf work
Cost leaf bolt
Cost of Center bolt
Cost of cutter pin
Cost of side washer
Cost of leaf clamp
Cost of clamp bolt
Cost of front leaf 2 Set opening and fitting
Rear wheel greasing work
Cost of oilseal (Outer + inner)
Cost of cam bush
Cost of excel packing
Cost of cam bush rod welding machining proper size
Cost of break richit
Labour and fixing charge.
Front wheel greasing work
Cost of oilseal (Outer + inner)
Cost of cam bush
Cost of cam bush rod welding machining proper size
Cost of break richit
Labour and fixing charge.
Filter work
Cost of Air filter
Cost of mobil filter
Cost of Diesel filter
Labour and fixing charge.
Tie rod work
Tie rod goli kit
Drygling kit
Centre bearing rubber
Teeth of popular shaft
Oil seal
Check nut
Nut bolt (19 no)
Painting work
Asian paint 2K white
Rubber paint (Asian)
Chesis Paint (Asian)
Metal primer (Asian)
Putty (Nerolac)
Duco (Thinner)
Tapin Tel
Water paper
Unskilled man power (2 manpower x 5 days)
Skilled man power (2 manpower x 5 days)
Supervisory (1 manpower x 5 days)
Total impact of GST for the purpose of CTC
JAGDISH ENGINEERING WORKS AND SUPPLIER
LAXMI CONSTRUCTION
M/S BALAJI CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_271021.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .