Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹1.6 L+₹1,358.84 (0.88%)Rejected-AOC MONDAL PARA KATWA P O KATWA DIST PURBA BARDHAMAN PIN 713130 | KATWA | PURBA BARDHAMAN | WEST BENGAL | 713130 | ₹1.6 L+₹1,358.84 (0.88%) | L2 | Rejected-AOC Reject |
| 3 | L3₹1.6 L+₹1,742.51 (1.12%)Rejected-Finance | ₹1.6 L+₹1,742.51 (1.12%) | L3 | Rejected-Finance Reject |
Tender Value
₹1.6 L
EMD Value
₹3,197
Closing Date
13 Mar 2026, 3:00 pmClosed
CHAIRMAN KATWA MUNICIPALITY
CHAIRMAN KATWA MUNICIPALITY
Construction Of CC Road At Math Para, Katwa beside the house of Safik Molla, Kohinur Bibi upto the house Saheb Ali Khan, Ward no.- 19, under Katwa Municipality.
2026_MAD_1017593_33
WBMAD 93 (DEV/15TH F.C /KM) 2025-2026
Open Tender
CIVIL WORKS
Percentage
11 days
Math Para
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,197
Yes
14 Sept 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. | 9 | % M3 | 2,294.9 | ₹20,654.1 |
| 2 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes.
(i) Pakur Variety | 20 | M3 | 5,571.61 | ₹1,11,432.2 |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm to 30 mm shuttering without staging in foundation | 10 | M2 | 205 | ₹2,050 |
| 4 | Sub Total | - | - | - | - |
| 5 | GST 18% | 1 | Nos. | 24,144.53 | ₹24,144.53 |
| 6 | CESS 1% | 1 | Nos. | 1,582.81 | ₹1,582.81 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_2501158.xls
BOQ • 0.27 MB
2911FORM.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .