Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 Cr+₹71.5 L (10.7%)Admitted-Finance | ₹7.4 Cr+₹71.5 L (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹8.7 Cr+₹2.0 Cr (30.5%)Admitted-Finance PLOT NO 160 2 KH NO 443 NASIR PUR VILLAGE SOUTH WEST DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | ₹8.7 Cr+₹2.0 Cr (30.5%) | L3 | Admitted-Finance |
| 4 | L4₹9.5 Cr+₹2.8 Cr (42.4%)Admitted-Finance | ₹9.5 Cr+₹2.8 Cr (42.4%) | L4 | Admitted-Finance |
| 5 | L5₹10.3 Cr+₹3.6 Cr (54.5%)Admitted-Finance 123 B CENTRAL AVENUE SAINIK FARMS SOUTH DELHI DELHI 110062 | SOUTH DELHI | DELHI | 110062 | ₹10.3 Cr+₹3.6 Cr (54.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shivam Engineers and Contracts L2 | Third Wave Services Pvt Ltd L5 | Khairati Lal L3 | Ashish Sehgal and Co. L1 | P R Constructions L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||
| 1.01 | Construction of Md Accn for block of 20 QTRs (Warrant Officer-10 QTRs + SGT & below - 10 QTRs) with stilt parking and 05 floors including RCC water tank over roof (1 compartment of 25000 litre for fire fighting + 1 compartment of 10000 Ltrs for domestic work) complete all as specified and as shown on drawings. Note :- Lift shall be paid under respective schedule of Lift except civil works required as shown on drawings. | 1 | Lump sum | 5,85,00,000 ₹5,85,00,000 | 8,42,00,000 ₹8,42,00,000 | 6,99,99,951 ₹6,99,99,951 | 4,86,00,000 ₹4,86,00,000 Lowest | 7,85,00,000 ₹7,85,00,000 |
| 2.00NOTE: Schedule ‘A’ Part II to XV under Ser No. 2.01 to 2.14 are Prepriced by MES. | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 4,50,000 ₹4,50,000 | 5,50,000 ₹5,50,000 | 3,63,413 ₹3,63,413 Lowest | 5,90,000 ₹5,90,000 | 8,00,000 ₹8,00,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION"” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 21,50,000 ₹21,50,000 | 26,60,000 ₹26,60,000 | 23,31,250 ₹23,31,250 | 20,24,200 ₹20,24,200 Lowest | 25,37,353 ₹25,37,353 |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY"” as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 8,30,000 ₹8,30,000 | 8,84,000 ₹8,84,000 | 9,43,420 ₹9,43,420 | 7,45,598 ₹7,45,598 | 7,25,804 ₹7,25,804 Lowest |
| 2.04 | Lump sum price worked out by the Contractor for "LIFT” as listed in Schedule ‘A’ Part V | 1 | Lump sum | 25,43,000 ₹25,43,000 | 26,92,136.3 ₹26,92,136.3 | 27,46,650 ₹27,46,650 | 27,00,000 ₹27,00,000 | 24,50,000 ₹24,50,000 Lowest |
| 2.05 | Lump sum price worked out by the Contractor for “FIRE FIGHTING” as listed in Schedule ‘A’ Part VI | 1 | Lump sum | 8,50,000 ₹8,50,000 | 11,99,000 ₹11,99,000 | 11,11,592 ₹11,11,592 | 10,40,400 ₹10,40,400 | 8,35,000 ₹8,35,000 Lowest |
| 2.06 | Lump sum price worked out by the Contractor for “LIGHTENING PROTECTION” as listed in Schedule ‘A’ Part VII | 1 | Lump sum | 1,50,000 ₹1,50,000 | 1,43,000 ₹1,43,000 | 1,22,135 ₹1,22,135 Lowest | 1,57,538 ₹1,57,538 | 1,47,139.86 ₹1,47,139.86 |
| 2.07 | Lump sum price worked out by the Contractor for "ROAD, PATH AND CULVERT” as listed in Schedule ‘A’ Part VIII | 1 | Lump sum | 20,00,000 ₹20,00,000 Lowest | 30,37,000 ₹30,37,000 | 23,54,980 ₹23,54,980 | 24,64,901 ₹24,64,901 | 22,20,632.5 ₹22,20,632.5 |
Tender Value
₹6.1 Cr
EMD Value
₹6.3 L
Closing Date
14 May 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-110010
DEMOLITION AND RE-CONSTRUCTION OF MD ACCN AT AF STN FARIDABAD
2026_MES_747523_2
CEWAC/FBD/T-21/2025-26
Open Tender
Civil Works
Lump-sum
450 days
GE (AF) FARIDABAD
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE (AF) FARIDABAD
₹6.3 L
Yes
17 Jul 2026
13 Apr 2026
18 May 2026
13 Apr 2026
14 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | - | - | - | - |
| - | Construction of Md Accn for block of 20 QTRs (Warrant Officer-10 QTRs + SGT & below - 10 QTRs) with stilt parking and 05 floors including RCC water tank over roof (1 compartment of 25000 litre for fire fighting + 1 compartment of 10000 Ltrs for domestic work) complete all as specified and as shown on drawings. Note :- Lift shall be paid under respective schedule of Lift except civil works required as shown on drawings. | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION"” as listed in Schedule ‘A’ Part III | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY"” as listed in Schedule ‘A’ Part IV | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for "LIFT” as listed in Schedule ‘A’ Part V | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “FIRE FIGHTING” as listed in Schedule ‘A’ Part VI | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “LIGHTENING PROTECTION” as listed in Schedule ‘A’ Part VII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for "ROAD, PATH AND CULVERT” as listed in Schedule ‘A’ Part VIII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part IX | - | Lump sum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.28 MB
Tender.pdf
Tender Documents • 15.59 MB
Binder1.pdf
Additional Documents • 17.80 MB
BOQ_851603.xls
BOQ • 0.41 MB
Binder1.pdf
PDF • 2.08 MB
doc02621820260424153700.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .